Create an Integrated Digital Environment IDE which will support the development and manufacturing of - PowerPoint PPT Presentation

1 / 2
About This Presentation
Title:

Create an Integrated Digital Environment IDE which will support the development and manufacturing of

Description:

... manufacturing of the Stryker and the Advanced Amphibious Assault Vehicle (AAAV) ... Reduce touch labor and time in generating work order packages. ... – PowerPoint PPT presentation

Number of Views:89
Avg rating:3.0/5.0
Slides: 3
Provided by: mmo59
Category:

less

Transcript and Presenter's Notes

Title: Create an Integrated Digital Environment IDE which will support the development and manufacturing of


1
General Dynamics Land SystemsDocument
Management, Workflow, Configuration Management
CHALLENGE
  • Create an Integrated Digital Environment (IDE)
    which will support the development and
    manufacturing of the Stryker and the Advanced
    Amphibious Assault Vehicle (AAAV)
  • Implement a web-based Integrated Data Environment
    (IDE) in which to manage all Stryker and AAAV
    program data

Collaboration with US Army, Marine Corps
Partners
  • Land Systems IDE went live in June 2002.

USERS SOLUTIONS
400
1000
1700
START
2001 2002
2003
2
General Dynamics Bath Iron Works Achieves
Efficiencies in Naval Destroyer Production
CHALLENGE
  • Existing mfg work packaging process was
    inefficient causing excess overhead and
    production delays.
  • Needed to re-engineer the work package processes
    to provide immediate cost savings to DDG program
    and to ensure that competitive advantage is
    maintained on future class builds.
  • Reduce touch labor and time in generating work
    order packages. This will allow the w/os to
    cycle through the planning phase and into the
    Installation and fabrication phases much sooner.
    Planning personnel freed up.

Utilizing web based, PLM technology within a
shipyard environment
  • New Windchill based Electronic Drawing Release
    (EDR) allows for complete automation of work
    packages.
  • Before Windchill, each trade followed unique,
    manual processes contents. Now, archiving,
    searching, and historical reuse are possible.
    Before, complete recreation of work package was
    necessary.
  • Work package Planners reduced by 40. ROI of 2M
    annually. Countless shipyard processes are
    leveraging Work Package Authorization solution.