The Hydrological and Meteorological Monitoring, Forecasting and Protection System B'2 Component - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

The Hydrological and Meteorological Monitoring, Forecasting and Protection System B'2 Component

Description:

7-8 pazdziernika 2003, I Seminarium Integrujace ... The Hydrological and Meteorological Monitoring, Forecasting and ... in the Construction Law (11.07. ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 9
Provided by: ks89
Category:

less

Transcript and Presenter's Notes

Title: The Hydrological and Meteorological Monitoring, Forecasting and Protection System B'2 Component


1
The Hydrological and Meteorological Monitoring,
Forecasting and Protection System B.2 Component
  • B.2.1 Task
  • Build-up and launch of telemetric measurement
    network
  • Managing team
  • - Task Leader - mgr inz. Aleksander Kruszewski
  • Deputy Task Leader - mgr inz. Piotr Cygan
  • Realization period 6.06.2001 31.12.2004
  • Realization price 883 000 EURO 32 770 000 PLN
    7 518 000 USD
  • after
    conversion - 16,61 m USD

2
PURPOSE B.2.1- Build-up and launch of the
telemetric measurement network
  • Modern hydro-meteorological measurement network
    for the protection system must be efficient and
    reliable
  • Estimated minimal range of measurement network
    for forecasting and protection system consists of
    1000 stations of different types
  • In addition the system must to fulfill the
    condition of being representative in relation to
    collection of historic data
  • The used systems and communication equipment
    must ensure full functionality in all possible
    weather conditions
  • Full integration with other tasks within B2
    component B2

3
SCOPE B.2.1 Build-up and launch of the
telemetric measurement network
  • Preparing the telemetric system technical design
  • Communication system design together with
    analysis and measurements of radio waves
    propagation
  • Design of the equipment for measurement stations
    and of the set of basic measurements programs
  • Preparation of typical designs for given types
    of measurement stations and means of their
    installation
  • Design of software for system operation control
  • Arrangement and collection of documents
    necessary for system development

4
SCOPE B.2.1 Build-up and launch of the
telemetric measurement network
  • Preparation of Technical Specification for the
    bidding for build-up of the telemetric network
  • Build-up of the telemetric network and
    communication infrastructure taking into
    consideration the already existing phonic
    radio-communication
  • launching the system in all 7 branches /
    departments of IMGWs observation - measurement
    services
  • Introducing the system into cooperation with
    other tasks of B2 component, especially with
    B.2.2 task, for which the telemetric system shall
    be one of the primary sources of observation
    results

5
PHASES B.2.1 Build-up and launch of the
telemetric measurement network
  • B.2.1.2 Task Development of the hydrological
    and meteorological telemetric measurement
    network.
  • Phase I preliminary design of the network and
    verification of positions of telemetry posts
  • Phase II technical design for the whole
    network
  • Phase III final design and preparation of
    technical specification
  • Phase IV finalization of documentation
    necessary to start the installation works
  • Phase V supervision over system development
    cooperation in the integration process
  • B.2.1.3 Task Implementation of the hydrological
    and meteorological telemetric measurement
    network.
  • Phase I preparatory works
  • Phase II build-up of pilot installation to
    perform integration tests with other tasks within
    the component
  • Phase III build-up and launch of the remaining
    part of the system
  • Phase IV launch all the elements of the system

6
STATUS as on 30.09.2003 B.2.1 -Build-up and
launch of the telemetric measurement network
  • In relation to B.2.1.2 Task Design of the
    network ... the realization is in the IV phase
    due to
  • Changes in the Construction Law (11.07.2003)
  • Constant delays in the acquisition of permits
    for use from RZGW Cracow and Warsaw
  • In relation to B.2.1.3 Task Build-up of the
    system the realization is in the I phase
    preparatory works

7
B.2.1 Build-up and launch of the telemetric
measurement network
- Anticipated cooperation with OKI (RZGW) and
with other users will take place at the level of
System of Hydrology (B.2.2 Task).
8
B.2.1 Build-up and launch of the telemetric
measurement network
  • At this stage the realization is not anticipated
  • Due to the modernity of applied solutions the
    cooperation related to the operation of
    measurement stations belonging to other systems
    dedicated to data transmission is possible within
    IMGWs homogeneous system