Status of the renovation of the electrical network in Point 18

Description:

Control and auxiliary cabling new section (60%) Civil engineering works new section. ... Civil engineering modifications. Supplies of cables for provisional ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 13
Provided by: NIC8169
Category:

less

Transcript and Presenter's Notes

Title: Status of the renovation of the electrical network in Point 18


1
Status of the renovation of the electrical
network in Point 18
  • A. Vairo ST/EL-NP

2
Point 18
SE18
SD18
3
Future power requirements (Installed power)
  • SM 18 SH18, SW18 Machine 13600 kVA
  • G.S. 2000 kVA
  • SHM 18 Machine 10370 kVA
  • G.S. 435 kVA
  • SD 18 G.S. 515 kVA
  • SMA 18 G.S. 170 kVA
  • Total power installed 27 MVA

4
(No Transcript)
5
Future general layout
6
Layout for SE18 substation
7
Interventions executed
  • Civil engineering works new section.
  • False floor and cable trays new section
  • Control and auxiliary cabling new section (60)
  • Set up provisional feeding GS SM18
  • Provisional feeding and installation SD18

8
Unforeseen problems
  • Delivery of equipment (rectifiers, 48Vdc
    switchboard)
  • Slow feedback from JV Ansaldo
  • Civil engineering modifications.
  • Alarms terminal boards displacement
  • Supplies of cables for provisional installations.

9
Next steps in SE 18
  • Dismantling old section (11-20 Dec )
  • Set up false floor old section ( 20-29 Dec)
  • Installation and cabling modified MV switchboard
    ( 03-12.01.2000)
  • Installation and cabling LV switchboards
  • Test and commissioning

10
SE 18 - MV Switchboards EMD1/E18, EMD2/E18
11
(No Transcript)
12
Future layout for SHM18 substation