New UDC Ch' 15 Requirements: Stormwater Management Plan and Water Quality Impact Study - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

New UDC Ch' 15 Requirements: Stormwater Management Plan and Water Quality Impact Study

Description:

City of Baton Rouge-Parish of East Baton Rouge. Department of Public Works ... Provide capacity for a 10-year storm. New UDC Ch. ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 22
Provided by: SDUP
Category:

less

Transcript and Presenter's Notes

Title: New UDC Ch' 15 Requirements: Stormwater Management Plan and Water Quality Impact Study


1
New UDC Ch. 15 RequirementsStormwater
Management PlanandWater Quality Impact Study
  • February 1, 2008

Presented by Melissa A. Guilbeau, AICP City of
Baton Rouge-Parish of East Baton Rouge Department
of Public Works Infrastructure Planning Division
2
Todays Presentation
  • Performance
  • Previous Requirements
  • New Requirements
  • Documentation
  • Previous Requirements
  • New Requirements
  • Stormwater Management Plan
  • Water Quality Impact Study

3
PerformancePrevious Requirements
  • Drainage
  • Provide capacity for a 10-year storm

4
PerformanceNew Requirements
  • Drainage
  • Provide capacity for a 10-year storm
  • Water Quality
  • Treat or retain on-site all first flush
    stormwater pollutants that originate from the
    site post-construction (UDC Sec. 15.16.C) or as
    required by DEQ TMDLs

First Flush is the first 60 minutes of a 10-year
storm (UDC Sec. 15.1.B)
5
UDC Section 15.12.J.4.a.Watershed Specific
Mitigation
  • What if I cannot practicably fully treat
    stormwater discharge as defined in UDC Sec.
    15.16.C?
  • Provide such treatment in an off-site facility OR
  • Pay a stormwater off-site management fee
  • Fee determined by Planning Commission
  • Will be used to mitigate the impacts in the same
    watershed as the development

6
UDC Section 15.12.J.3.a.Waiver of specific
pollutant treatment
  • Waivers to treat specific water pollutants may be
    issued if
  • Developer provides documentation proving that
  • Specific pollutant does not exist on-site and
  • Will not be generated by proposed development
  • DPW concurs and approves

7
DocumentationPrevious Requirements
DIS
8
DocumentationNew Requirements
SMP
DIS
WQIS
9
Stormwater Management?Construction vs.
Post-Construction
  • Construction
  • Storm Water Pollution Prevention Plan (SWPPP)
  • No new or changed requirements!
  • Post-Construction
  • Stormwater Management Plan (SMP)
  • New UDC Ch. 15 requirement!

10
UDC Section 15.13Stormwater Management Plan
SMP
11
UDC Section 15.13Stormwater Management Plan
  • Recommend specific drainage and stormwater runoff
    quality improvements
  • Drainage capacity for 10-year storm
  • Treat or retain on-site all first-flush
    stormwater pollutants that originate from the
    site post-construction

12
UDC Section 15.13Stormwater Management Plan
  • Shall include
  • Location of development
  • Existing Conditions land cover, contours, soil
    types, estimated pollutant load
  • Proposed Development land cover, contours,
    empirically expected pollutant load, proposed
    drainage and stormwater BMPs
  • Plan Implementation detailed description of the
    specific proposed drainage and stormwater BMPs
  • Maintenance how the proposed improvements will
    be maintained

13
UDC Section 15.13Stormwater Management Plan
  • Must be consistent with
  • Drainage Impact Study
  • Water Quality Impact Study
  • when either or both of these are required
  • Required even if DIS or WQIS is not required

14
UDC Section 15.13Stormwater Management Plan
  • Required for
  • New development
  • Redevelopment (demolition or complete removal of
    existing structures or impervious surfaces and
    replacement with new development)

15
UDC Section 15.13Stormwater Management Plan
  • Exemptions (to submitting a SMP)
  • Residential lots of less than ½ acre within
    subdivisions approved on or before Dec. 5, 2007
  • All lots in duly authorized subdivisions created
    with an SMP
  • Individual lots must comply with SMP for the
    subdivision

16
UDC Section 15.13Stormwater Management Plan
  • Submit 2 copies of SMP to DPW

17
UDC Section 15.17Water Quality Impact Study
WQIS
18
UDC Section 15.17Water Quality Impact Study
  • Similar to DIS, but for water quality
  • Components
  • Existing Site Conditions and Location
  • Proposed Development Conditions
  • Empirically expected pollutants
  • Proposed Water Quality Treatment
  • Study Conclusions Recommendations

19
UDC Section 15.17Water Quality Impact Study
  • Required for
  • Exemptions (to submitting WQIS)
  • Sites with a developed area lt1 acre
  • Farming or agricultural activities

20
UDC Section 15.17Water Quality Impact Study
  • Submit 2 copies of WQIS to DPW

21
Questions
  • Melissa Guilbeau, AICP
  • Urban Transportation Coordinator
  • Department of Public Works
  • Infrastructure Planning Division
  • (225) 389-5491
  • mguilbeau_at_brgov.com

Jim Ferguson, PE Professional Engineer Department
of Public Works Drainage/Flood Section (225)
389-3196 jferguson_at_brgov.com