Title: Risk Aspects and Context Covered in the Module
1Risk Aspects and Context Covered in the Module
- COMM80 Risk Assessment of Systems Change
- Unit 1
2Objectives of Session Coverage
- To provide a matrix of the coverage intended.
- To outline the manner in which the topics
of the module are covered.
3Matrix Coverage in the module
4Unit 2
Introduce Systems Change and Its Perspectives.
- Systems Change and its attendant risks can be
considered from a range of perspectives. Those we
consider are - (A) Finance
- (B) Personnel
- (C) Business Fit
- (D) Infrastructure
- (E) Systems Integration
- (F) Systems Development
- Tutorial Group activities focusing on systems
change.
5Unit 3
Introduction to Risk.
- Risks.
- Definition of risk
- Facets of risk that need to be considered
- Generic Risk Life cycle
- Tutorial student analysis of documented risks.
6Unit 4
Risk identification generic techniques and
perspectives.
- Focus is initially on generic techniques for risk
identification. - Then introduce some specific techniques that fit
well with particular perspectives - e,g, rich pictures, SEIs TBQ.
- Tutorial student practice on case study
7Unit 5
Risk identification
- Continued focus on specific techniques and
perspectives. - (Where do these fit in a method)
- Tutorial student practice on case study.
8Unit 6
Risk assessment generic concept
- Reasons why so important
- Standard techniques e.g. prioritisation,
ranking. - Specific techniques e.g. Discount Cash Flow,
SSMs rich pictures - Tutorial student presentation of group
activity for assignment 1.
9Unit 7
Risk assessment Riskit Analysis Graph
- Focus on Riskit Analysis Graph and relevant
perspectives - (Where RAG fits in RISKIT)
- Perspective Infrastructure examples.
- Tutorial student practice on case study.
10Unit 8
Risk assessment Discounted Cash Flow
- Financial perspective
- Introduce the idea of comparative analysis
- what-if scenarios of DCF,
- other options such as AHP, Decision trees
(students to investigate in self study) - Tutorial student practice on case study.
11Unit 9
Risk Assessment Business Activity Maps
- Focus on RAMESES Business Activity Maps
- Focus on perspective of fit of system to
business. - Layers of information,
- current,
- proposed system
- Tutorial consideration of usage.
12Unit 10
Decision points.
Continue or Abandon? how to evaluate the
impact? Pareto Scenarios DCF and financial
justification, RAMESES risk gauges, SERUM
evolutionary development concept.
- Tutorial continue study of case study, group
sessions to query for further information and
make valid assumptions for the perspective
theyre taking.
13Unit 11
Mitigation and Contingency Planning.
- Techniques
- RISKIT taxonomy
- Risk RADAR (documentation)
Tutorial discussion of mitigation strategies and
contingency options for case study organisations
14Unit 12
Mitigation and Contingency Planning.
- Focus on Network and Systems Interaction
- Examples of effective strategies, and failures.
- Tutorial based on network issues.
15Units 13, 14 and 15
Pulling It All Together
- Overview of different methods, chosen from
(e.g.) - RISKIT, RAMESES, SERUM, Boehms win-win model.
- Tutorials
- Discussion of potential for application of
methods in context of systems change (reliant on
student reading). - Consultation time for assignment.