Title: Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003
1Stability Issues in Entergy System Entergy
Transmission Planning Summit New Orleans, LA
July 10, 2003
2Classification of Power System Stability
- Transient/Angle Stability
- Voltage Stability
- Small Signal/Oscillatory Stability
3Static Voltage Stability Criteria
Limits Corresponding to Voltage Decline Criteria
Limits Corresponding to 5 margin from Nose Point
Nose Point ( point before voltage collapse)
4Dynamic Voltage Stability Criteria
5Damping Criteria 3
6Areas of Stability Concern in 2002
I. Joint Stability Study between Entergy,
Southern, and TVA
North Arkansas
Northwest Quadrant
West of the Atchafalaya Basin (WOTAB)
Southeast Louisiana
II. McKnight-Franklin Flow Limits
III. Stability problem in WOTAB Area
7I. Joint Stability Study between Entergy,
Southern, and TVA
8Results/Northwest Quadrant
- New generation added without PSS severely
deteriorated system damping. - The most limiting contingency from a damping
standpoint was the Miller - Bellefonte 500 kV
line. - The most limiting contingency from a voltage
standpoint was the Farley - Mitchell 500 kV line. - With PSS on new generating units, the export
limits were found to be 3,850 MW. - Current Status Problem doesnt exist any more
due to cancellation of some IPP generation.
9II. McKnight-Franklin Flow Limits
10Problem Area
North Arkansas
Mississippi
West of the Atchafalaya Basin (WOTAB)
Southeast Louisiana
11Results/Southeast Louisiana
- Angle Stability limits found to be slightly lower
than voltage stability limits - Rating of the McKnight-Franklin 500kV line
limited to 2,070 MVA due to unacceptable damping - With Webre-Richard out of service, the flow limit
is 1,958 MVA - With Daniel-McKnight out of service, the flow
limit is 1,522 MVA - No transient voltage security violations observed
12III. Stability Problem in Entergys WOTAB
area
13Problem Area
North Arkansas
Mississippi
West of the Atchafalaya Basin (WOTAB)
Southeast Louisiana
14Results/WOTAB
- The limiting contingency is the Mt. Olive -
Hartburg 500 kV line. - Without PSS, the limit is 2,700 MW based on
damping criteria ( lt 3 damping). - With PSS on new generating units, the export
limit was found to be 3300 MW based on voltage
collapse criteria. - Limit based on voltage decline criteria (0.92 pu)
is 2,100 MW. - Major transmission improvements may be required
to increase export limits.
15New Areas of Stability Concern
North Arkansas
Mississippi
West of the Atchafalaya Basin (WOTAB)
Southeast Louisiana
V. Western Region Voltage Stability
IV. Amite South Stability
16IV. Stability Problem in Entergys Amite
South Area
17Problem Area
North Arkansas
Mississippi
West of the Atchafalaya Basin (WOTAB)
Southeast Louisiana
Amite South Region
18Background
- Major Load Center
- Large Concentration of Generation
- Expected 2003 conditions
- 6,280 MW of load (including CLECO LaGEN loads)
- 8,400 MW of native and new generation
19Background
- 230 kV loop out of Waterford is critical
- Approximately 3,100 MW generation in the loop
- System stable for primary clearing faults
- Additional generation can lead to instability for
stuck breaker faults
20Results
- Under stuck breaker faults
- Fault clearing time very important for the
stability of the region - Units in Amite south region and close vicinity
can separate from the rest of the system - Can lead to lines tripping
21System Separation
22Solutions Proposed
- Faster fault clearing devices (relays, breakers)
- Remedial action scheme to trip certain units to
protect against stuck breaker fault conditions - Power system stabilizers on the new units
- IPO breakers
23V. Voltage Stability Problem in Entergys Western
Region
24Areas of Stability Concern
North Arkansas
Mississippi
West of the Atchafalaya Basin (WOTAB)
Southeast Louisiana
Western Region
25Background
- Western Region load growth 5.1
- Generation sources Two Lewis Creek units (226MW
230MW, 150 MVAR each) - With one Lewis Creek unit out of service, certain
line outages can cause low voltages leading to
potential voltage collapse. - Critical tie lines are Grimes Crockett 345 kV
and China Jacinto 230 kV.
26Background
- Currently, Under Voltage Load Shedding (UVLS)
scheme is in place. - Voltage at critical buses below 0.92 pu
- Loss of both Lewis Creek generators
- Lewis Creek units go into over excitation mode
- Series Compensation on China Jacinto 230 kV
line - Static capacitors installed 770 MVAR
- Two D-SMES units (8 MVA each) installed at New
Caney and Metro in 2001
27Power Voltage (P-V) CurveLoss of one Lewis
Creek unit and Grimes Crockett 345 kV line
28Voltage Profile at Critical Buses
29Results for 2005 Summer Peak
- Voltage Instability
- Slow voltage recovery
- Several motor loads at risk
- Depressed voltages can lead to UVLS operation
-
30Possible Solutions
- Static Devices MS Shunt Cap Banks
- Series Compensation
- New transmission facilities (for details, see
EGSI-TXs area planning presentation) - Dynamic VAR support device (e.g., SVC, STATCOM,
D-SMES) -
31System Stability Summary
- PSS installation mandatory for all new generation
locating on the Entergy system - PSS tuning mandatory in WOTAB and Southeast
Louisiana - Traditional methods are needed to fix stability
problems (alleviate thermal constraints,
additional static reactive power support devices,
series compensation) - New technologies (FACTS devices, e.g., SVC,
STATCOM, D-SMES, UPFC, etc.) may be required.