Regional and Inter-Regional Planning Update Presentation Overview SERTP/RPSG: Southeast Regional Transmission Planning / Regional Planning Stakeholder Group www ... – PowerPoint PPT presentation

Number of Views:296
Avg rating:3.0/5.0
Slides: 13
Provided by: sdp04
Category:

less

Transcript and Presenter's Notes

Title: Regional and Inter-Regional Planning Update


1
(No Transcript)
2
Regional and Inter-Regional Planning Update
Entergy Transmission SummitJuly 29, 2008Astor
Crown PlazaNew Orleans, Louisiana
3
Presentation Overview
  • SERTP/RPSG Southeast Regional Transmission
    Planning / Regional Planning Stakeholder Group
  • www.southeasternrtp.com
  • SIRPP Southeast Inter-Regional Participation
    Process
  • www.southeastirpp.com
  • JCSP Joint Coordinated System Plan

4
SERTP / RPSG Meetings
  • 3/24/2008
  • Formation of RPSG and Selection of Sensitivity
    Studies for 2008
  • 6/25/2008
  • Preliminary 10-Year Expansion Plans of SE Region
    Transmission Owners
  • 9/23/2008
  • Preliminary Results
  • November Transmission Summit
  • Final Study Results

5
RPSG Sensitivity Studies
1000 MW
Mobile
Atlanta
2000 MW
Entergy
GITS
1000 MW
Alabama
Florida
1000 MW
Entergy
Alabama
Santee CooperSCEG
1000 MW
GITS
6
(No Transcript)
7
SIRPP Activity
  • April 3, 2008- Stakeholders Organizational
    Meeting
  • June 10, 2008 Meeting
  • Stakeholder Group was formed
  • Economic Studies selected
  • Coordinate on study assumptions
  • October, 2008 Conference Call
  • Review preliminary study results
  • January, 2009
  • Review final study results and draft report
  • February, 2009- Final report issued

8
SIRPP Step 1 Economic Studies for 2008
2000 MW
Entergy
GITS
2000 MW
PJMMISO
Southern
3000 MW
Southern
PJM
3000 MW
PJM (classic)
Southern
5000 MW
SPP
(JCSP)
Southern
9
Joint Coordinated System Plan
  • Scope of Work
  • Perform Eastern Interconnect wide study
  • Reliability Study 2018 model
  • Economic Analysis 2024 model
  • Incorporate DOE Eastern Wind Integration
    Transmission Study objectives
  • Future Scenarios
  • Reference (todays reference values)
  • 20 Wind (by 2024)

10
Joint Coordinated System Plan
  • Timeline
  • Initial Meeting November 1, 2007
  • Economic Analysis March 1, 2008
  • HV Transmission Overlay Development December,
    2008
  • Reliability Assessment August 2009
  • Cost Allocation Analysis October, 2009

11
Joint Coordinated System Plan
  • Current Status
  • Preliminary transmission plans for each future
    have been completed
  • Beginning to test transmission plans for
    robustness
  • Testing and consolidation of transmission plans
    to be completed by December, 2008

12
Steve PurdyLead Engineer, ICT Planning501-614-33
71SPurdy_at_SPP.org
Questions / Commentsspp.issuetrak.comQuick
Pick ICT Planning Base Plan
Doug BowmanLead Engineer, ICT Planning501-688-16
40DBowman_at_SPP.org