Technical Pub Panel 1 - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Technical Pub Panel 1

Description:

VADM (SEL) JAMES F. AMERAULT, DEP CHIEF OF NAVAL OPERATIONS (LOG) ... The Navy's E-6B aircraft has been included as a Pilot Demonstration System since ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 12
Provided by: ceco2
Category:
Tags: chief | navy | panel | pub | results | technical

less

Transcript and Presenter's Notes

Title: Technical Pub Panel 1


1
Electronic Technical Publications Ad Hoc Panel
Report to the Tri-Service Technical Working
Group on IETMs
Mr. S. William Lewis Hqs, CECOM, LRC Ft Monmouth,
NJ 15 Sep 98
2
JOINT LOGISTICS COMMANDERS (JLC)
  • PRINCIPALS
  • GENERAL JOHNNIE E. WILSON, COMMANDER, ARMY
    MATERIEL COMMAND
  • GENERAL GEORGE T. BABBITT, COMMANDER, AIR FORCE
    MATERIEL COMMAND
  • VADM (SEL) JAMES F. AMERAULT, DEP CHIEF OF NAVAL
    OPERATIONS (LOG)
  • MAJ GEN GEOFFREY B. HIGGINBOTHEM, DEP CHIEF OF
    STAFF (INSTALLATIONS LOGISTICS), USMC
  • LT GEN HENRY T. GLISSON, USA, DIRECTOR, DEFENSE
    LOGISTICS AGENCY
  • INVITED PARTICIPANTS
  • LT GEN JOHN M. MCDUFFIE, USA, DIRECTOR FOR
    LOGISTICS, JOINT STAFF (JS/J-4)
  • LT GEN JOHN G. COBURN, USA, DEPUTY CHIEF OF STAFF
    FOR LOGISTICS, ARMY

3
(No Transcript)
4
Executive Committee
  • Dennis Rilling, SPAWAR (Chairman)
  • Dr. Howard Wichansky, CECOM
  • COL Stewart Morrison, USA, JOINT STAFF
  • Greg Schellhase, SM-ALC/LH
  • Paul Arnstein, USCG
  • Dan Price, USAF
  • James McGillicuddy, USMC
  • Mike OConnor, DISA
  • LTC Eustace King, NSA

5
Goals
  • Develop a uniform approach for electronically
    communicating and accessing technical data
    throughout DoD
  • Maximize the use of COTS technology in the
    process
  • Develop a common user/information interface for
    field delivery

6
Approach
  • Change OSD CALS IETM Technical Working Group
    charter to reflect the goals of Sub-panel
  • Leverage off NAVAIRs approach for IETM
    interoperability
  • Perform technology survey
  • Select standard COTS viewer
  • Obtain Services Identification of unique
    requirements

7
Approach (cont.)
  • Develop Joint Architecture Business Process
  • Select Pilot Programs that demonstrate the unique
    and common requirements of each Services
    existing and future ETMs/IETMs
  • Conduct Pilot Programs of Proof-of-Principle
  • Publish Interoperability standards

8
Milestone Schedule
Publishing of Interim implementation recommendati
ons
3 months
3 months
6 months
3 months
3 months
Pilot Programs coordination
Standards promulgated to Service agencies
Analyze requirements
Characteristics mapping
Analysis of results

DEC 97
MAR 98
JUNE 98
DEC 98
JUN 99
MAR 99
CONCEPT DEVELOPMENT/ (FEASIBILITY ASSESSMENT)
ADVANCED DEVELOPMENT/ (REQUIREMENTS ANALYSIS)
ENGINEERING DEVELOPMENT (PILOT DEVELOPMENT
TEST)
PRODUCTION DEPLOYMENT
  • Presently in 3rd phase
  • Each service gathering data on programs

9
Programs Selected for Demonstration
  • Army AN/PPS-5, EPLRS, Apache Longbow.
  • Navy ATIS-AIR, LM-2500, Submarine
    SSMs, NSSN Library, E-6B, F/A-18.
  • Air Force General Methods and Procedures TO,
    F-22, JSTARS
  • USMC Diode Test Set, TRSS, TAOC, AAAV
  • The Navys E-6B aircraft has been included
    as a Pilot Demonstration System since the last
    IETMTWG meeting.

10
Key Metrics Benefits
  • Cost Reduction
  • Improved Efficiency
  • More Effective Deployment

11
Conclusion
  • There are currently no major issues
  • Program is on schedule
Write a Comment
User Comments (0)
About PowerShow.com