Title: Status of TDR2, TBP Tests CSIST and NSPO Daniel Haas Eduardo Cortina DPNC Geneva CSIST Meeting Taiwa
1Status of TDR2, TBP Tests _at_ CSIST and
NSPODaniel HaasEduardo CortinaDPNC
GenevaCSIST MeetingTaiwan, Dec 2003
- TDR2 Status
- TBP Status
- Tests of TDR2 _at_ CSIST
- Tests of T-Crate
- _at_ CSIST - functional test, ESS, EMI
- _at_ NSPO - TVT
2TDR2 Status
- TDR2 QM1 is ready and tested
- OK for QM2 production was given to CSIST in
October, Gerber files etc. transferred - Missing pieces
- Drawings for Frontpanel, Fixation for Connectors,
Assembly Note (ready by Dec-5) - Preprogrammed Actels (ready by Dec-17)
D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
3TBP Status
- TBP QM1 is ready
- Gerber Files (and PCAD) on CAEN FTP
- Backplane is not yet fully tested!
- waiting for TBS and TPSFE QM1 to do complete
functional test
D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
4TBP - Related Issues
- Removal of USCM's requires redesign of Backplane
for QM2 (_at_ CSIST if possible)? Decision after
weight-discussion in Jan 2004 - First ESS/EMI/TVT will be done with unmodified
TBP QM1 - Modified TBP (QM2) should be retested later
D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
5Tests of TDR2 QM1 - Done _at_ Geneva
- 6 QM1 prototype in our hands
- Tests of Solid State Fuse/Consumption (all 7)
- Functional Tests via AMSwire (all 7)
- 2 Testbeams (_at_CERN/_at_GSI) (3 boards)
- Test of TAS with W. Wallraff (3 boards)
- Tests in TBP with JINF (Andrei/Vladimir) (2
prototype) - 1 board in Mechanical Workshop for Frontpanel
- No Problems observed, all tests passed!
D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
6Tests of TDR2 QM2 - foreseen _at_ CSIST
- Test of Voltages/Consumption/SSF
- Functional Tests of CDP and analog Frontend(also
in a thermal chamber for ESS) - Results are stored via HTML-Interfaceinto
Database (under Preparation)
D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
7Tests of TDR2 QM2 - List of Material
- CSIST should provide
- Oscilloscope, Multimeter (if possible with
serial connection) - 2 Computers with Linux/Windows (in english)
- EPP/CANbox with 5 AMSWire cables
- evtl. NIM-Crate to provide Trigger/simple logic
- Geneva provides
- Minibackplane with Powersupply
- Equipment to test SSF (Load/Probe)
- Hybrids with Cables and dummy loads to test
Analog Part
D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
8Tests of T-Crate QM2 _at_ CSIST/NSPO
- Functional Test of equipped Crate _at_ CSIST
- digital and analog part, USCMs etc.
- ESS and EMI-Tests _at_ CSIST
- TVT _at_ NSPO
- Feedthroughs 5 AMSWire, 2 CANbus, 28 V we would
like to use the feedthroughs from X. Cai
D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
9Tests of T-Crate QM2 - List of Material
- CSIST/NCU should provide
- 2 PCs with PCIAMSwire (1 T-Crate/1 U-Crate)
- 1 PC to control Powersupply Switchbox
- 2 PCs for CANbus/Trigger (1 T-Crate/1 U-Crate)
- 2 PCs for Monitoring (1 T-Crate/1 U-Crate)
D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
10Tests of T-Crate QM2 - Documentation
- These documents will be prepared till
30-Jan-2004 - Functional Tests for TDR2
- Functional Tests for T-Crate Environmental Tests
- T-Crate Thermal Vacuum Test Interface Document
D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
11Tests of TDR2/T-Crate QM2 - Manpower
- Eduardo Cortina and Daniel Haas will come to
CSIST for ALL Tests of TDR2/T-Crate - please announce us in time when TDR2 will be
ready, so we can plan the travel - T-Crate tests _at_ CSIST and NSPO should be
performed in same time-window if possible - Person from Accademia Sinica should assist QM2
tests to get trained for FM production (E.
Cortina/D. Haas will be _at_ CSIST, but not together)
D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
12Conclusions
- TDR2 is ready for QM2 production
- TBP QM1 is waiting for TBS/TPSFE to finish tests
and give OK for QM2 - Modifications of TBP to discuss in Jan 2004
- E. Cortina/D. Haas will take care of QM2 tests
and will be present _at_ CSIST/NSPO - T-Crate tests/documents are under preparation
D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003