OK for QM2 production was given to CSIST in October, Gerber files etc. transferred ... Gerber Files (and PCAD) on CAEN FTP. Backplane is not yet fully tested! ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 13
Provided by: amsC3
Category:

less

Transcript and Presenter's Notes

Title: Status of TDR2, TBP Tests CSIST and NSPO Daniel Haas Eduardo Cortina DPNC Geneva CSIST Meeting Taiwa


1
Status of TDR2, TBP Tests _at_ CSIST and
NSPODaniel HaasEduardo CortinaDPNC
GenevaCSIST MeetingTaiwan, Dec 2003
  • TDR2 Status
  • TBP Status
  • Tests of TDR2 _at_ CSIST
  • Tests of T-Crate
  • _at_ CSIST - functional test, ESS, EMI
  • _at_ NSPO - TVT

2
TDR2 Status
  • TDR2 QM1 is ready and tested
  • OK for QM2 production was given to CSIST in
    October, Gerber files etc. transferred
  • Missing pieces
  • Drawings for Frontpanel, Fixation for Connectors,
    Assembly Note (ready by Dec-5)
  • Preprogrammed Actels (ready by Dec-17)

D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
3
TBP Status
  • TBP QM1 is ready
  • Gerber Files (and PCAD) on CAEN FTP
  • Backplane is not yet fully tested!
  • waiting for TBS and TPSFE QM1 to do complete
    functional test

D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
4
TBP - Related Issues
  • Removal of USCM's requires redesign of Backplane
    for QM2 (_at_ CSIST if possible)? Decision after
    weight-discussion in Jan 2004
  • First ESS/EMI/TVT will be done with unmodified
    TBP QM1
  • Modified TBP (QM2) should be retested later

D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
5
Tests of TDR2 QM1 - Done _at_ Geneva
  • 6 QM1 prototype in our hands
  • Tests of Solid State Fuse/Consumption (all 7)
  • Functional Tests via AMSwire (all 7)
  • 2 Testbeams (_at_CERN/_at_GSI) (3 boards)
  • Test of TAS with W. Wallraff (3 boards)
  • Tests in TBP with JINF (Andrei/Vladimir) (2
    prototype)
  • 1 board in Mechanical Workshop for Frontpanel
  • No Problems observed, all tests passed!

D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
6
Tests of TDR2 QM2 - foreseen _at_ CSIST
  • Test of Voltages/Consumption/SSF
  • Functional Tests of CDP and analog Frontend(also
    in a thermal chamber for ESS)
  • Results are stored via HTML-Interfaceinto
    Database (under Preparation)

D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
7
Tests of TDR2 QM2 - List of Material
  • CSIST should provide
  • Oscilloscope, Multimeter (if possible with
    serial connection)
  • 2 Computers with Linux/Windows (in english)
  • EPP/CANbox with 5 AMSWire cables
  • evtl. NIM-Crate to provide Trigger/simple logic
  • Geneva provides
  • Minibackplane with Powersupply
  • Equipment to test SSF (Load/Probe)
  • Hybrids with Cables and dummy loads to test
    Analog Part

D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
8
Tests of T-Crate QM2 _at_ CSIST/NSPO
  • Functional Test of equipped Crate _at_ CSIST
  • digital and analog part, USCMs etc.
  • ESS and EMI-Tests _at_ CSIST
  • TVT _at_ NSPO
  • Feedthroughs 5 AMSWire, 2 CANbus, 28 V we would
    like to use the feedthroughs from X. Cai

D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
9
Tests of T-Crate QM2 - List of Material
  • CSIST/NCU should provide
  • 2 PCs with PCIAMSwire (1 T-Crate/1 U-Crate)
  • 1 PC to control Powersupply Switchbox
  • 2 PCs for CANbus/Trigger (1 T-Crate/1 U-Crate)
  • 2 PCs for Monitoring (1 T-Crate/1 U-Crate)

D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
10
Tests of T-Crate QM2 - Documentation
  • These documents will be prepared till
    30-Jan-2004
  • Functional Tests for TDR2
  • Functional Tests for T-Crate Environmental Tests
  • T-Crate Thermal Vacuum Test Interface Document

D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
11
Tests of TDR2/T-Crate QM2 - Manpower
  • Eduardo Cortina and Daniel Haas will come to
    CSIST for ALL Tests of TDR2/T-Crate
  • please announce us in time when TDR2 will be
    ready, so we can plan the travel
  • T-Crate tests _at_ CSIST and NSPO should be
    performed in same time-window if possible
  • Person from Accademia Sinica should assist QM2
    tests to get trained for FM production (E.
    Cortina/D. Haas will be _at_ CSIST, but not together)

D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003
12
Conclusions
  • TDR2 is ready for QM2 production
  • TBP QM1 is waiting for TBS/TPSFE to finish tests
    and give OK for QM2
  • Modifications of TBP to discuss in Jan 2004
  • E. Cortina/D. Haas will take care of QM2 tests
    and will be present _at_ CSIST/NSPO
  • T-Crate tests/documents are under preparation

D. Haas, E. Cortina CSIST, Taiwan,
Dec 2003