Why do MEP contractors require BIM coordination services? PowerPoint PPT Presentation

presentation player overlay
About This Presentation
Transcript and Presenter's Notes

Title: Why do MEP contractors require BIM coordination services?


1
Why do contractors require
MEP coordination services?
2
Challenges faced by MEP contractors
  • Inaccurate MEP designs leading to rework
  • Errors during onsite installation due to
    unidentified clashes
  • Low level of detailing due to uncoordinated 2D
    drawings sketches
  • Meeting tight deadlines and controlling building
    costs

Undetected clashes account for 5 of total
construction spend (Source Autodesk)
3
  • How MEP coordination services benefit MEP
    contractors

Help meet project deadlines
Early conflict resolution in MEP designs
Provide hassle-free onsite installation
Stay within planned budget
with proper scheduling planning
by reducing unnecessary rework
with spatially coordinated models
with high level of detailing
4
1
Clash identification resolution at
preconstruction stage
The MEP BIM Solution
Problem
  • Early clash identification and resolution
  • Better visualization of MEP systems
  • Dynamic collaboration between various MEP trades
  • Interdisciplinary coordinated workflows
  • Covers 100 installation accuracy of MEP systems
  • Onsite interdisciplinary MEP clashes leading to
  • Rework due to undetected clashes
  • Lack of visualization
  • Silo workflows
  • Errors during onsite installation

5
2
Address MEP design conflicts at design stage
The MEP BIM Solution
Problem
  • Data-rich and coordinated MEP models
  • Real-time visualization of MEP systems
  • Better routing of MEP systems
  • Constructability issues lead to
  • lack of spatial coordination
  • Absence of constructability analysis
  • Performance issues of MEP systems

6
3
Better scheduling with improved workflows
The MEP BIM Solution
Problem
  • Precise material and equipment scheduling
  • Accurate 4D scheduling and construction
    sequencing
  • Real-time walkthroughs of MEP systems
  • Conflicts in workflow and equipment scheduling
    due to
  • Timeline conflicts and inaccurate material
    scheduling
  • workflow issues cascaded to next design phase
  • Ad-hoc site downtimes

7
  • 7M saved by a General Contracting company for an
    airport project in Oman, with MEP clash detection
    and coordination services.
  • Want to know how?

Learn how BIM MEP Clash Detection for
International Airport
8
Get a higher ROI for your construction project
with effective MEP coordination services.
  • Contact our MEP experts today!

www.hitechcaddservices.com info_at_hitechcaddserv
ices.com