Wireless Remote Sighted-Guide for the Blind ECE 191: Group 8 - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Wireless Remote Sighted-Guide for the Blind ECE 191: Group 8

Description:

Anh and Tuan tested functionality of parts. John Miller and Tuan beta test run ... Tuan following 20 feet behind. John Miller purposely disobey directions ... – PowerPoint PPT presentation

Number of Views:82
Avg rating:3.0/5.0
Slides: 12
Provided by: klbe
Category:

less

Transcript and Presenter's Notes

Title: Wireless Remote Sighted-Guide for the Blind ECE 191: Group 8


1
Wireless Remote Sighted-Guide for the BlindECE
191 Group 8
  • Group Members
  • Kathryn Becker
  • Hoang-Anh Nguyen
  • Danny Picar
  • Mike Ramirez
  • Tuan Anh Vo
  • Professors
  • Dr. Clark Guest
  • Dr. Charles Tu
  • Sponsor
  • Cal-(IT) ²
  • Mentor
  • John Miller, Ph.D.

2
Agenda
  • Gantt Chart
  • Tasks Accomplished
  • Preliminary Stage
  • Goals for Week 5
  • Summary

3
Gantt Chart
4
Tasks Accomplished
  • Kathryn GPS research
  • Anh and Tuan tested functionality of parts
  • John Miller and Tuan beta test run
  • Danny and Mike PC interface research
  • Ordered Lego Mindstorm book and RC transmitter PC
    interface
  • Met with Professor Ann Hoger to discuss mechanics
    aspects of project
  • Talked with Prof. Nate Delson about the physical
    aspects of the prototype

5
GPS Research
  • GPS receiver measures distance to three
    satellites this determines position
  • Commercial GPS measurements are too noisy
  • Errors up to 100 meters
  • Although DGPS is more accurate, it's too
    expensive
  • We will be logging GPS data points to determine
    if there is a pattern to the commercial GPS errors

6
Results Of Testing
  • Observations
  • Range of transmitter and receiver is good
  • Parts were light-weight
  • Obstacles
  • Increasing angle of rotation range
  • Linear Converter not functioning properly
  • Miniaturizing components
  • Delay attenuation of signal
  • Battery life

7
Beta Test Run
  • Path Café Roma to Peterson Hall
  • John Miller following direction
  • Tuan following 20 feet behind
  • John Miller purposely disobey directions
  • Test controller and user interaction
  • User requests feature
  • Indication that he responded correctly
  • Miniaturize device

8
Preliminary Stage
FRONT VIEW
Clip
BACK VIEW
Direction
Speed
Battery Receiver
9
PC Interface
  • RC Electronics serial PCbuddy
  • Programming
  • Multi channel data sending
  • Uncertainty of compatibility of coding with JA
    DAC interface
  • Must talk to Doug Palmer at Cal-(IT)²

10
Goals for Week 5
  • Research on how to communicate and control device
    using a computer via USB
  • Gain an understanding of Cal-IT2 GPS system
  • Develop a method to integrate the use of Lego
    Mindstorm
  • Begin assembly of device

11
Summary
  • Tested parts
  • Continuation of research GPS, RC Transmitter PC
    Interface
  • Beta test run and adjustment
  • Assembly of prototype
Write a Comment
User Comments (0)
About PowerShow.com