1
LIPPO CIKARANG Wasted Water Treatment Plant
  • Saputra Sibarani
  • Presented by
  • Andreas Alfredo Sigalingging

2
Content
Introduction
General Description Of Lippo Cikarang
Wasted Water Treatment Plant
Measurement
3
INTRODUCTION
  • Lippo Cikarang is Industrial Area managed by PT
    Lippo Cikarang.
  • Based on Government Rules, Industrial Area must
    have WWTP to guarantee health and clean area.

4
Data
  • Primary
  • Secondary
  • Flow Rate
  • Temperature
  • pH
  • Colour
  • COD
  • BOD
  • SS
  • Lippo Cikarang Description
  • WWTP Operational Data
  • WWTP Unit Dimensions

5
City of Lippo Cikarang
6
Public Facility
Comercial Area
Public Area
Industry Area
WWTP
7
Wasted Water Treatment Management
8
Standard of Effluen of PT Lippo Cikarang
Standard of effluent from industry to be
treated At WWTP of Lippo Cikarang
  • suspended solid 200 mg/l
  • pH 6.0-9.0
  • COD 1000 mg/l
  • BOD 600 mg/l

9
Treatment Processes
  • First Stage
  • (Equalization neutralization)
  • Second Stage
  • (Aeration CMAS sedimentation)
  • Third Stage
  • (Coagulation-flocculation, post-sedimentation)
  • Mud Treatment Stage
  • (Thickener filter belt press)

10
Scheme of WWTP
/Cikadu River
I Inlet I with screen II Inlet II with
screen a Equalization I b Equalization
II c Neutralization d Aeration Tank
CMAS e Sedimentation
f pH adjustment g Coagulation h
Flocculation i Post-sedimentation j
Thickener k Belt Press Filter
11
Equalization Unit
To overcome shock loading in term of Quantity and
quality. Equalization I absorbs wasted water
from clothing and food industries. Flow rate is
50 m3/hour and the Wasted Water are hold inside
for 1.82 days.
12
Equalization II absorbs wasted waters from other
sources. And then mix together with wasted water
from equalization I. Flow rate is 119 m3/hour and
holding time 0,77 day. Dimensions Length
35 m Depth 4,5 m (1m freeboard)Volume
2187,5 m3
13
Equalization I
14
Equalization II
15
Aeration CMAS
  • oxygenation
  • hydrodynamic purpose wastewater mixing by air
    bubbles ensure regardful and intensive contact of
    micro-organisms with oxygen and purified water
    (organic pollution)Dimentions Length 76 m
    Width 33 mDepth 4,5 m (1m
    freeboard)Volume 4838,75 m3

16
Aeration Pool (CMAS)
17
Scum in Aeration
18
Sedimentation
  • Sedimentation Pool is part of Biologic Treatment
    to sedimentate Biologic Muds.Dimensions
    Diameter 17 mDepth 3,5 m (1m
    freeboard)Volume 680,6 m3

19
Sedimentation Pool
20
Third Stage(coagulation-floculation and
post-sedimentation)
  • Coagulation is process to separate Pollutant in
    suspended form or Coloid, by adding Coagulant.
  • Flocculation is process to form bigger floc by
    adding Floculant so that it can be easily
    sedimentated.
  • Post-sedimentation is process to sedimentate
    chemical mud resulted from Coagulation and
    Floculation process.
  • Chemical used
  • Coagulant alum
  • Floculant polimer

21
Coagulation
22
Flocculation
23
Post-sedimentation
24
Thickener
  • Thickener Unit is used for thickening process of
    mud in Sedimentation Pool. Dimensions
    Diameter 12,5 mDepth 3,5 m (1m
    freeboard)Volume 368 m3

25
Thickener
26
Belt press filtering
  • Belt Press Filter is used for Mud Dewatering
    Process (decreasing water concentration) so that
    the muds can be easily and safely threw out in
    solid cake form. Dimensions Length 8 m
    Width 6 mSludge feed pump 3-13 m3/dWash
    water pump 12 m3/d

27
Belt Press Filter
28
Baku Mutu Air Limbah
Effluen quality standard for industrial WWTP
according To government rules (KepMen LH No
03/MENLH/1998)
Parameter Maximum (mg/l) Maximum Loads (kg/day. Ha)
BOD5 50 4.3
COD 100 8.6
TSS 200 17.2
pH 6.0-9.0 6.0-9.0
Maximum flow rate is 1 L/detik. Ha of used area. Maximum flow rate is 1 L/detik. Ha of used area. Maximum flow rate is 1 L/detik. Ha of used area.
29
Measurement Results
Thursday, 19 Juli 2007
Primary Data
Parameter Unit Influent Ekualisation II Influent aeration Aeration Pool RAS Effluent Aeration Effluent
Temperature 0C 25.1 26.1 29.9 26.3 26.8 29.2 26
pH 9.12 8.81 9.13 7.75 7.77 8.01 7.83
Color Pt-Co 2724 347 484
TSS mg/l 867 484 597 5790 15780 10232 153
BOD5 mg/l 700 344 470 525 330 37
COD mg/l 2058 949 1013 2208 4676 2044 201
SV-30 ml/1000ml 420
30
Efficiency
Efficiency
Parameter Unit Treatment Load Treatment Load Efficiency
Parameter Unit Influent Effluent Efficiency
Colour Pt-Co 2724 484 82
SS mg/l 867 153 82
BOD5 mg/l 700 37 95
COD mg/l 2058 201 90

31
  • THANK YOU!!!!