First ECENA Plenary Meeting Zagreb, 19-20 January 2006 Item 19 B - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

First ECENA Plenary Meeting Zagreb, 19-20 January 2006 Item 19 B

Description:

First ECENA Plenary Meeting Zagreb, 19-20 January 2006 Item 19 B&H s obligations in the field of environmental priorities within the European partnership – PowerPoint PPT presentation

Number of Views:52
Avg rating:3.0/5.0
Slides: 16
Provided by: webRecOrg
Learn more at: http://web.rec.org
Category:

less

Transcript and Presenter's Notes

Title: First ECENA Plenary Meeting Zagreb, 19-20 January 2006 Item 19 B


1
First ECENA Plenary MeetingZagreb, 19-20
January 2006Item 19BHs obligations in the
field of environmental priorities within the
European partnership prepared by Azra
GackicFederal Ministry of Physical Planning end
Environment
2
  • BHs obligations
  • 1. Institutional strengthening and capacity
    building in the domain of environmental
    protection
  • 2.Implementation of already adopted legislative
    instruments
  • 3. To ensure the efficient functioning of the
    environmental monitoring system

3
Institutional strengthening and capacity building
in the domain of environmental protection (1)
  • Establishment of an environmental protection
    agency at state level
  • Desision for environmental performances
  • Advisory services
  • Developing methodologies
  • Process is currently ongoing

4
Institutional strengthening and capacity building
in the domain of environmental protection (2)
  • Enactment of an environmental framework law at
    state level
  • Points for possible inclusions into the
    environmental framework law are listed
  • Clarification of the competency distribution
    structure
  • Establishment of the principles and mechanisms
    for integrating environmental concerns into other
    sectors
  • Complying with the requirements of EU and
    international conventions to which BiH is a
    Party.
  • Establishment of national reference centers
    regarding air quality, climate changes, water,
    biodiversity and waste management
  • Process is ongoing

5
Institutional strengthening and capacity building
in the domain of environmental protection (3)
  • Inspection reform (WB project)
  • Establishing a joint inspectorate at entity and
    cantonal level
  • Reorganizing the inspectorates including,
  • Rationally organised, regionally grouped and
    independent inspection network
  • Process is ongoing

6
Institutional strengthening and capacity building
in the domain of environmental protection (4)
  • PRSP -Poverty Reduction Strategy Paper
    Medium-term development strategy, (adopted on
    February,2004)
  • Enactment of a regulation on substances which
    have negative effect on the ozone layer in
    BiH(obligations derived from Montreal agreementa)
  • Strengthening of the National Ozone unit
  • Strengthening the role of the Steering
    Committee
  • Enactment of a Law on movement of hazardous
    substances
  • Process is ongoing

7
Institutional strengthening and capacity building
in the domain of environmental protection(5)
  • Study that has been carried out Functional
    review of Environmental Sector in BH (CARDS)
  • Proposed measures are
  • . to create a conceptual capacity at the centre,
  • to streamline the work,
  • to rationalise the use of human resources,
  • to raise cost-efficiency and
  • to mobilise citizens

8
Implementation of adopted legislative (1)
  • Law on environmental protection 6 by-laws
    enacted
  • Law on air protection 8
    by-laws enacted
  • Law on water protection 4 by-laws enacted
  • Law on waste management 6 by-laws enacted
  • Law on nature protection 2 by-laws enacted
  • Law on Environmental Protection Fund Enactment
    of 10 b-laws has been currently undergoing the
    preparation phase
  • Generally the enactment of sub-acts is late. The
    total of enacted sub-acts is about 60 . In 2006
    an enactment of rest sub-acts is to be expected
    (including both entities).

9
  • Functioning of enviromnetal monitoring sistem (1)
  • NEAP (National Environmental Action Plan)
  • Priorities Short- term
  • INTRODUCTION OF INFORMATION SYSTEMS
  • Projects for development and upgrading of
    databases( registries)
  • Supplying institutions with adequate equipment
  • INTRODUCTION OF MONITORING
  • Establishment of a central database, training of
    personnel and improvement of the existing
    communication with EEA
  • Establishment of a pollutant emission cadastre
    according to CORINAIR methodology
  • Emission and imission monitoring of large
    emitters
  • INTRODUCTION OF A WASTE MANAGEMENT SYSTEM
  • Elimination of wild dumpsites and rehabilitation
    of degraded areas
  • Identification of land destruction due to
    contamination by wastes and recovery of such areas

10
Functioning of environmental monitoring sistem(2)
  • NEAP (National Environmental Action Plan)
  • Priorities medium-term
  • INTRODUCTION OF INFORMATION SYSTEMS
  • Establishment of a national environmental
    information system ( NEIS)
  • ESTABLISHMENT OF A RIVER BASIN MANAGEMENT SYSTEM
  • INTRODUCTION OF A WASTE MANAGEMENT SYSTEM
  • Adoption of the waste management strategy
  • Establishment of databases on wastes
  • Establishment of a waste market
  • Introduction of adequate pricing for disposal of
    all kinds of wastes in an environmentally sound
    manner
  • EDUCATION
  • Education and training programs related to
    collecting, proceeding and storing of date in
    accordance with modern methodology

11
Functioning of environmental monitoring sistem
(3)
  • NEAP (National Environmental Action Plan)
  • Priorities medium-term
  • BALANCED MANAGEMENT OF BIODIVERSITY AND LANDSCAPE
    DIVERSITY
  • Preparation of a strategy for biodiversity
    protection
  • Preparation and adoption of a Red List and red
    Book
  • PROTECTION REGIME
  • Preparation of programs for placing 15-20 of BH
    territory under adequate protection regime

12
Functioning of environmental monitoring system(4)
  • Establishment of a national environmental
    monitoring system- CARDS programm , current
    project
  • Provide adequate assistance to BH when
    establishing monitoring and information system
    complying with the EIONET requirements
  • Institutional strengthening and capacity building
    in the field of environmental protection
  • Carrying out activities in selected sectors

13
Functioning of environmental monitoring system(5)
  • International Convention to which BH is a
    Party
  • Convention on long-range transboundary air
    pollution (Geneva 1979)
  • Vienna convention for the protection of the ozone
    layer (Vienna 1985)
  • United Nations framework convention on climate
    change (Rio de Janeiro 1992)
  • International plant protection convention (Rome,
    1951)
  • (UN) Convention on biological diversity (Rio de
    Janeiro,1992)
  • The Ramsar Convention on Wetlands (Ramsar, 1971)
  • Convention for the protection of the
    Mediterranean Sea against pollution (Barcelona)
  • International convention for the prevention of
    pollution of the Sea by oil (London)
  • International convention from the prevention of
    pollution from ships (London)
  • Convention on co-operation for the protection and
    sustainable use of the River Danube (Sofija)
  • Basel convention on the control of transboundary
    movements of hayardous wastes and their disposal
    ( Basel 1989)
  • UN Convention to combat desertification in
    countries experiencing serious drought and/or
    desertification

14
Functioning of environmental monitoring system(6)
  • IMPLEMENTATION OF ADOPTED LEGISLATIVE
  • Conventions
  • Currently undergoing the preparation process
  • Convention on environmental impact assessment in
    a transboundary context (Espoo)
  • Convention on free access to information (Aarhus)
  • Priority Directivese
  • Water Framework Directive
  • Joint cooperation directive in the domain of
    accidental or intended sea pollution
  • Reporting Directive
  • Air quality framework directive and so-called
    Daughter Directives

15
Functioning of environmental monitoring system(7)
  • BHs obligations in accordance with Ratification
    of certain Conventions and Directives
  • According to the Conventions
  • Strategies and plans
  • legal instruments
  • monitoring
  • reporting
  • According to the Directives
  • Defining strategic Directive priorities (
    inclusion into the legislative)
  • Capacity building (With the EU assistance BH is
    to chose leading countries that will provide
    adequate support in the domain of environmental
    technology)