G. Burdet ST/EL/CO. 6. FIPIO to PLC in PX24 and MAGELIS in ACR. RS485 Jbus ... G. Burdet ST/EL/CO. 11. Schema of drawer (before modification for breaker state) ... – PowerPoint PPT presentation

Number of Views:159
Avg rating:3.0/5.0
Slides: 27
Provided by: tsdepW
Category:

less

Transcript and Presenter's Notes

Title: LV Switchboards monitoring for ALICE and LHC-B experiments


1
LV Switchboards monitoring for ALICE and LHC-B
experiments
  • Equipment location.
  • Radiation and access constraints.
  • Monitoring goals.
  • Available signals.
  • Quantity.
  • Cabling switchboards to concentrator.
  • Possible interfaces.
  • Monitoring system architecture.
  • Conclusions.

2
Equipment location.
  • ALICE
  • UX25
  • 7 switchboards (23 drawers each) for electronic
    racks (EXD).
  • 2 General Services switchboards (EBD)
  • PX24
  • 8 switchboards (23 drawers each) for electronic
    racks (EXD).
  • 1 UPS Distribution switchboard (EOD)
  • LHC-B
  • ?

3
(No Transcript)
4
Interface Equipment
Monitored Switchboard
5
Interface Equipment
Monitored Switchboard
6
RS485 Jbus to URT500 ENS
FIPIO to PLC in PX24 and MAGELIS in ACR
TCP/IP (ModBus on TCP/IP and WEB Server
BUS X PLC crate expansion
MCA15 for drawers information
RS485 Jbus for DIRIS Ap SOCOMEC communication
7
SEM2
EMD4/2E
EMD3/2E
FIR Ir Is It
FIR Ir Is It
FIR Ir Is It
EMT302/2X
EMT406/2X
SX2
EXD1/2X
EBD1/2X
Is
EODx/2X
Is
UW25
EXD1/25
I phase S
UX25
PX24
PX24 39 drawers per level, total 156
Supervision of the LV Distribution for ALICE
experiment G. Burdet April 2003
8
Radiation and Access Constraints
  • ALICE
  • UX25
  • Radiation level consideration
  • Inaccessibility during operation
  • PX24
  • No radiation constraint
  • Accessible area
  • ALICE validate PLC in UX25
  • PLC closer to switchboards to reduce cabling cost
  • Measurement modules in switchboards

9
Monitoring goals
  • Monitoring of switchboards and drawers.
  • Remote control of drawers.
  • States and measurements integrated to ENS.
  • Synoptic.
  • Fault on electrical trips.
  • Alarms on measurements levels.
  • Monitoring and Control available to Experiment
    SCADA.

10
Available Signals
  • Switchboards
  • States
  • Input breaker (Opened and Closed)
  • 48VDC auxiliary (Missing)
  • Measures
  • Bus Bars voltages (230V and 37.07VAC nominal)
  • Input currents (Ir, Is, It, In CT 1A and 7.07VAC
    nominal)
  • Drawers
  • States
  • Contactor Position (Opened and Closed)
  • Breaker Position (Opened) after drawer
    modification.
  • Local/Remote switch (LOCAL and Remote)
  • Over current trip (SD)
  • External Interlock (Activated)
  • Measures
  • Earth current tore/shunt (7.5A, 7.70VAC nominal)
  • Controls
  • Contactor Close, Open, Reset external interlock

11
Separate Qc and Qd information Use one of the 2
pins to transmit
Schema of drawer (before modification for breaker
state)
12
Quantity
  • ALICE
  • Principe of 1 drawer per rack.
  • UX25 7 switchboards of 23 drawers 161 racks
    maximum
  • PX24 8 switchboards of 23 drawers 184 racks
    maximum
  • 120 measures without earth current per drawer.

13
Cabling
Cable Cable Connectors Connectors Total
Pulling Supply Cabling Supply  

1185 775 6446 900 9306
3555 2325 6446 900 13226
7110 4650 6446 900 19106
5925 3875 3223 450 13473

7110 4650 6446 900 19106
2370 1550 6446 900 11266
7110 4650 6446 900 19106
4740 3100 6446 900 15186

119778CHF
Switchboards Switchboards No Length Length
General Drawers MCA15 Unite Total
US25
2 2 23 50 5 250
2 2 23 50 15 750
2 2 23 50 30 1500
1 2 23 25 50 1250
PX24
2 2 23 50 30 1500
2 2 23 50 10 500
2 2 23 50 30 1500
2 2 23 50 20 1000

8250m
Groupement daffaire Pulling / Cabling 32668 Supply 36794 CHF Total 88409 CHF 74
14
Considered Interfaces
  • CIT8.4, CIT8.4A, CIT1.32P HAZEMEYER
  • PLC PREMIUM and distributed I/Os on FIPIO
  • PLC SIEMENS
  • S7-300 centralised
  • S7-300 distributed
  • S7-400
  • PLC PREMIUM and CIT 8.4A HAZEMEYER
  • PLC PREMIUM and DIRIS Ap SOCOMEC

15
CIT HAZEMEYER (1)
ltlt 15 switchboards gtgt
ltlt 23 drawers gtgt
16
CIT HAZEMEYER (2)
  • Modularity et compatibility with analogue
    signals.
  • 1 x CIT 8.4A per switchboard (measures et
    states).
  • 1 x CIT 8.4 per drawer (states and controls).
  • 1 x CIT1.32P as switchboard concentrator.
  • 15 sets (78 switchboards).
  • 15 CIT8.4A, 345 CIT8.4, 15 CIT1.32P
  • 1 x PLC PREMIUM SCHNEIDER MAGELIS
  • Interface Cost 63609 (plus crates, cables,
    cabling, program).
  • CIT Quantity and HAZEMEYER contract.

17
PLC PREMIUM and distributed FIPIO
  • TBX 16 inputs
  • TBX 16 outputs
  • TBX Analogues converters
  • Total equipments
  • PLC
  • TBX
  • Measurement Converter
  • 67500
  • 48500 without measure

18
PLC SIEMENS
  • 32 bits inputs boards
  • 16 bits outputs boards, common by 4
  • Prices for digital I/O (no measures).

19
PLC PREMIUM CIT HAZEMEYER (1)
  • PLC PREMIUM SCHNEIDER
  • 64 bits input boards (24VDC polarisation)
  • 64 bits output boards with external TeleFast
    relays
  • CIT8.4A (spare) versus CIT8MX (contract)
  • 1 module per switchboard
  • Voltage Ur, Us, Ut
  • Currents Ir, Is, It, In
  • Active Power Pr, Ps, Pt included
  • CIT1.32P as concentrator

20
PLC PREMIUM CIT HAZEMEYER (2)
  • PREMIUM limited to 2048 TOR
  • Two sets UX25 and PX24.
  • Modular crates, 64 drawers each.
  • Special crates for CIT and UC HH

EUROS CHF
Total PLC 58876 88314
CIT (CIT8.4A) 6750 10125
Matériel 79626 119439
Program. 7000 10500
Câbles 54803 82205
ALICE 141429 212144
EUROS CHF
Total PLC 58876 88314
CIT (CIT 8MX) 16050 24075
Matériel 88926 133389
Program. 7000 10500
Câbles 54803 82205
ALICE 150729 226094
21
PLC PREMIUM DIRIS Ap SOCOMEC (1)
  • PLC PREMIUM SCHNEIDER
  • 64 bits input boards (24VDC polarisation)
  • 64 bits output boards with external TeleFast
    relays
  • 1 x DIRIS Ap SOCOMEC per switchboard
  • Voltage Ur, Us, Ut
  • Currents Ir, Is, It, In, maximum current
  • Active reactive Power, maximum power
  • On/Off incomer interface
  • Saves 2 MCA15 cables par switchboard
  • Local display
  • Best placed in switchboards

22
PLC PREMIUM DIRIS Ap SOCOMEC (2)
  • PREMIUM limited to 2048 TOR
  • Two PLC sets UX25 and PX24.
  • Modular crates, 64 drawers max each.
  • Measures by DIRIS Ap in switchboards
  • Reduce cable 25 to 23 per switchboard
  • Full measurement
  • Local display

EUROS CHF
Total PLC 58876 88314
Total DIRIS 17040 25561
Matériel 83916 125875
Program. 7000 10500
Câbles 50419 75629
ALICE 141336 212003
23
TCR
CAS
TDS
ENS
SES2 Local SCADA URT500 FE
SX2
PX24
PLC
PLC
UX25
CIT1.32P
Tableaux BT PX24
Tableaux BT UX25
CIT8.4A
24
TCR
CAS
TDS
ENS
SES2 Local SCADA URT500 FE
SX2
PX24
PLC
PLC
UX25
Tableaux BT PX24
Tableaux BT UX25
25
ALICE Experiment Switchboards Monitoring and
Control
PREMIUM PLCs and DIRIS Ap SOCOMEC
FIPIO inter-PLC and to MAGELIS
UX25
PX24
TCP/IP ModBus on TCP/IP WEB Server
Jbus on RS485 URT500 ENS
46 drawers in 2 switchboards
BUS X
BUS X
Jbus RS485
69 drawers in 3 switchboards
46 drawers in 2 switchboards
BUS X
Jbus RS485
BUS X lt100m
46 drawers in 2 switchboards
BUS X
BUS X
46 drawers in 2 switchboards
92 drawers in 4 switchboards
26
Conclusions
  • Switchboards impose cable/connector type
  • Distributed architecture to reduce cabling costs
  • Best compromise is SCHNEIDER PREMIUM PLC for
    digital I/O with SOCOMEC DIRIS Ap for measures
  • Cabling and system cost related to relation
    rack/drawer
  • Change relation gt reduce cost.