Reliability Software Minimum requirements - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Reliability Software Minimum requirements

Description:

... awareness by the local grid operators and Reliability Coordinators ... What are the minimum real-time application & tool requirements for grid reliability ? ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 13
Provided by: FERC8
Category:

less

Transcript and Presenter's Notes

Title: Reliability Software Minimum requirements


1
Reliability SoftwareMinimum requirementsBest
practices
  • Frank Macedo - FERC
  • Technical Conference July 14, 2004

2
Blackout report findings
  • Inadequate situational awareness by the local
    grid operators and Reliability Coordinators
    prevented effective action

3
Objectives
  • What are the minimum real-time application
    tool requirements for grid reliability ?
  • What are the best available applications tools
    for grid reliability ?

4
Functional Areas
  • Network analysis
  • Monitoring and visualization
  • Real-time enablers
  • Operations planning
  • Transactions scheduling
  • History forecasting

5
Caveat
  • The minimum requirements and performance
    indicies quoted are considered to be commercially
    achievable and are not intended to be regulatory
    requirements. Their purpose is to initiate
    industry discussion on what these minimum
    reliability capabilities ought to be.

6
Network Analysis
  • Minimum
  • Network topology processor (Detailed network
    adequate external representation)
  • State estimator (lt 2 min., mismatch lt 10 MVA)
  • Real time contingency analysis (lt 5 min. on 100
    kV and above plus external critical facilities)
  • Best practice
  • Critical facility loading assessment (use of
    Line Outage Dist Factors)
  • Dynamic security assessment (transient voltage
    stability limits)
  • RT thermal capability assessment (based on
    prevailing pre-load and ambient or dynamic field
    measurements)
  • RT short-circuit assessment (based on prevailing
    network and generation)

7
Monitoring Visualization
  • Minimum
  • Wide area visualization (critical facilities
    external to the footprint)
  • Dynamic reactive reserve/Minimum voltage
    (required actual)
  • Remedial Action Schemes (status, trigger points
    proximity)
  • Automatic safety nets (under frequency load
    shedding, under voltage load shedding)
  • Status of EMS facilities (servers, back-up
    systems, communications, functionality)
  • Best Practice
  • Dynamic Map Board driven by EMS
  • Capability for remote access and navigation
    (network conditions and Contingency Analysis
    results)
  • Electronic documentation (critical operating
    information linked to facilities on network
    topology)

8
Real-Time Enablers
  • Minimum
  • Intelligent alarm processing (filtering,
    prioritization, grouping)
  • Block load shedding (lt10 min. capability)
  • ACE/AGC
  • Remote back-up EMS, voice data communications
  • Best Practice
  • Generation of options to return system to secure
    operating state

9
Operations Planning
  • Minimum
  • Outage scheduling (assess impact of outages
    using historical data ac Load Flow)
  • Study Mode capability (study what-if
    scenarios using a real-time snapshot of the
    system)
  • Generation reserve sharing (allocation of
    reserves among units)
  • Best Practice
  • Rehearsal of next days operation (simulate all
    outages test using contingency analysis in
    study mode)

10
Transactions Scheduling
  • Minimum
  • Interchange distribution calculator (IDC)
  • System data exchange (SDX) updated (lt15 min of
    outage)
  • E-tag approval/scheduling
  • OASIS
  • Best Practice
  • Automatic update of IDC
  • Identification of full range of mitigation
    options for TLR

11
History Forecasting
  • Minimum
  • Weather data (forecast high risk conditions)
  • Load forecasts (short term next day)
  • Information storage retrieval (ISR)
    (reconstruction of events, proactive inspection
    maintenance of critical assets)
  • Best Practice
  • ISR linked to Asset Management System
    Training Simulator (automatic generation of
    directives on equipment testing and maintenance.
    Scenarios for training)

12
Issues
  • Network measured data maintenance
  • State estimator maintenance
  • IT Operations interactions quality control
  • Data sharing outside of footprint
  • Human factors engineering
  • Training Simulator
Write a Comment