45cm Holes after 30hrs of Drill/Ream. Depth 2450m Straight ( ) Drill Cycle Time 3.5 Days ... Produce a survey in ABSOLUTE co-ordinates (referenced to grid ... – PowerPoint PPT presentation

Number of Views:18
Avg rating:3.0/5.0
Slides: 10
Provided by: anupam4
Category:

less

Transcript and Presenter's Notes

Title: Drill Requirements


1
Drill Requirements
June 19, 2002 NSF / ICDS / RPSC Madison, WI
(Bob Morse)
2
Drill Requirements
  • 45cm Holes after 30hrs of Drill/Ream
  • Depth 2450m Straight ( )
  • Drill Cycle Time 3.5 Days
  • Fuel Usage 8000 10 per hole
  • Computer Controlled

3
0 m
2450 m
4
Drill Requirements
  • Operate in (-30C to 40C)
  • Storage in (-70C)
  • Requires Rodriguez Well 18000 gal/hole
  • Efficient Environmentally sound
  • Target 16 holes/yr without moving the drill
    camp

5
Cable plan -Sequence of Drilling
6
Drilling and Detector Deployment Schedule,
16-Hole Season Spole Station Opens Nov
1 Start Drill Set-up (18-25 days) Nov
4-5 Complete Set-up Nov 23-30 Start Drilling
(rate of 2 holes per week) Nov 26-31 Finish
Drilling and Deployment Jan 26-30 Start Drill
Build-down (7-10 days) Jan
27-31 Complete Drill Build-Down Feb 2
10 Spole Station Close Feb 15.
7
Logging -Telescope Requirements
  • Ability to reconstruct the hole profiles to
    within 1-2m of the holes actual location at
    any depth
  • Produce birds-eye profile curves for any drill
    depth giving the X-Y location as a function of
    depth Z
  • Produce a survey in ABSOLUTE co-ordinates
    (referenced to grid-north-Greenwich)