Title: Modeling and Simulation to Support Development and Operational Testing of Integrated Air and Missile
1Modeling and Simulationto Support Development
and Operational Testing of Integrated Air and
Missile Defense Capability
Presented to the joint session of the Test
Evaluation and System Acquisition and Product
Development forums
- LCDR Paul Ghyzel, USN, JSSEO
- Col Gregory Gross, USAF, DOTE
- Mr. Jim Slaight, UTA
- 20 April 2004
2Issue
- Traditional DoD test evaluation production
representative systems in operationally realistic
conditions - Future acquisitions capabilities manifested in
distributed systems utilizing net-centric
concepts and emphasizing joint interoperability - Future TE that relies solely on production
systems in the field will be cost and
logistically prohibitive
3Integrated Air and Missile Defense
- Today
- Weapon System Engagements Constrained by
Procedural Controls, Target ID and Organic Sensor
Limitations - Joint Defense Capabilities Constrained by
Inadequate Interoperability Among Weapon Systems,
Sensors, and BMC4I
- 2010
- Single Integrated Air Picture
- Integrated Fire Control
- Combat ID
- Automated Battle Management Aids
4 IAMD and IABM
- Integrated Air and Missile Defense (IAMD)
- Joint capability implemented among Service
Partner Programs - Integrated Architecture Behavior Model (IABM)
- Ideal Joint IAMD Battle Management Command and
Control (BMC2) functionality - JSSEO develops in spirals from Capstone
Requirements Documents (CRD) Key Performance
Parameters (KPP) - JSSEO delivers in increments to Partner Programs
- Partner Programs implement in combat systems
5Required Joint Tactical BMC2
Displays
Displays
Joint Tactical BMC2
Joint Tactical BMC2
Weapons
Sensors
Weapons
Sensors
Systemspecific Tactical BMC2
Systemspecific Tactical BMC2
Communication Network (and Enterprise Services)
Displays
Displays
Joint Tactical BMC2
Joint Tactical BMC2
Weapons
Weapons
Sensors
Sensors
Systemspecific Tactical BMC2
Systemspecific Tactical BMC2
6IABM
Machine Translation
Platform Specific Model
Implementation
Testing
Platform Independent Model
Integrated Architecture Repository
A Reference Implementation
Block Engineering Architecture
Targeted to High Level Architecture Run Time
Infrastructure to support distributed development
and test and evaluation
Application
HLA RTI
Operating Systems
Equipment
7Development and OperationalTest and Evaluation
Conformance Tested
Platform Independent Model
Platform Specific Model
Testing
Consistent and conformant built by joint
consortium
Machine (or manual) translation done by System
Program Managers (with help from joint consortium)
Verification and Validation by System Program
Managers Joint Independent Verification and
Validation by JITC
Being developed in collaboration w/ Industry,
FFRDCs Gov. PMs (e.g., Navy Open Architecture
Air Forces E-10A/MC2A)
8IAMD testing continuum
9Capstone Test Evaluation Master Plan
- Establishes rigorous TE approach for IAMD
capability that spans multiple programs of all
Services - Resolve challenges of distributed development
system - Integrate MS, HWIL Live events to most
effectively meet test objectives - Align TE activities of JDEP Technical Framework
to support IABM development and TE - Establish methods tools acceptable to DT, OT
communities to support testing of
Service-specific implementations - Engaging DOTE, Service OTAs, Service programs
- Drafted in collaboration with community
- Comments dispositioned at JSSEO and incorporated
in subsequent revisions
10Verification Validation
- Performed by JITC
- IABM/Platform Independent Model JSSEO
responsibility - MIL-STDs conformance
- JROC-validated requirements verification
- Interoperability assessment
- Combat and C2 Systems PM responsibility
- Developmental Test
- MIL-STDs conformance
- JROC-validated requirements verification
- Operational Test
- IVV of implemented configuration
- Interoperability Certification
11Operational Test Evaluation
- Tests production representative systems
- Operationally realistic conditions
- Used and maintained by operator representative of
those in the field - Last step in sequence of seamless verification
- Contractor testing to development testing to
independent OT to OTE - Results in reduced costs, compressed timelines
- Close coordination required between development
and operational testers - Capstone TEMP provides the roadmap
12Operational Test Legislation
- Before a major acquisition program can go to full
rate production, DOTE must - Certify that test and evaluation was adequate
- Submit a report to Congress and SECDEF as to the
operational effectiveness and suitability of the
system - Operational Test Evaluation
- Conducted by Operational Test Agencies
- May not be based solely on modeling and
simulation - Determine suitability and effectiveness under
realistic operational conditions - Systems maintained and used by members that will
fix/use in combat - All data must be shared with DOTE
13Test Evaluation Objectives
- Developed by stakeholders
- Design for Success provide tools to
developers that enable the system to pass OTE
the first time - Provide certified IABM to Partner Program
Managers - Developmental Test and Evaluation
- Conformance and interoperability testing
- OTE preparations
- Work with DOTE and Service OTAs
- Identify correct Joint Distributed Engineering
Plant (JDEP) Technical Framework shortfalls - Develop roadmap for SIAP OTE
- Improve the JDEP Technical Framework to provide
- Engineering fidelity for Developmental Test
Evaluation - Realistic operational conditions for OTE
preparations
14Joint Distributed Engineering Plant(JDEP)
JDEP Technical Framework
- Assets and processes
- owned by different organizations
- reused in different federations to address
different SoS issues - centrally coordinated to support reuse and
access by multiple users for different purposes - Supports three user communities
- Developers
- engineer interoperability into systems
- Testers
- test and evaluate interoperability among systems
- Operators
- assess operational capabilities of forces
Digital Simulations combat systems system
components (sensor, C2)
Infrastructure common procedures common standards
(HLA) common services (comms, environ) connectivit
y (DISN-LES) IBuilds reusable, interoperable
15JDEP IABM Test Federation
16Summary
- Need is for high fidelity tests in a realistic
environment - Repeatable
- Relatively inexpensive
- Modeling simulation should be able to meet the
need - DOTE, JSSEO and the Services working to improve
the tools - Benefits of successful effort
- Decreased burden on operational forces
- Fielding operational systems quicker cheaper
- MS leave behinds available for future use