High Voltage Equipment Solutions' Design and Manufacturing - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

High Voltage Equipment Solutions' Design and Manufacturing

Description:

... Equipment Solutions. Design and Manufacturing. Patton & Cooke Co. ... Patton & Cooke Co. WYE (Y) Splice Junction Bars. Typical Underground Vault Installations ... – PowerPoint PPT presentation

Number of Views:59
Avg rating:3.0/5.0
Slides: 22
Provided by: karind9
Category:

less

Transcript and Presenter's Notes

Title: High Voltage Equipment Solutions' Design and Manufacturing


1
Patton Cooke Co.Surrey, BC, Canada
High Voltage Equipment Solutions. Design and
Manufacturing
2
Patton Cooke Co. WYE (Y) Splice Junction
Bars Typical Underground Vault Installations
JBY-3A/9B-19
3
Vault Style A
4
200 AmpLive End Cap
200 AmpLoad Break Insert
3 PhaseJBY-3A/9B-19 (15/25 kV)3 x 200 Amp9 x
600 Amp
single phase shown
for clarity
5
3 Phase Junction, 200 Amp Wellw/ Load Break
Insert Live End Cap Installed
6
JBY-3A/9B-19 Installed in Vault Style
AConnecting 600 Amp T Elbows
7
JBY-3A/9B-19 Installed in Vault Style A
8
JBY-3A/9B-19 Installed in Vault Style AGround
System by Removing Live End Cap
9
JBY-3A/9B-19 Installed in Vault Style A Attach
Grounding Elbow to Ground
10
JBY-3A/9B-19 Installed in Vault Style AConnect
Grounding Elbow to Module
11
Vault Style B
12
A 600 Amp IEEE Standard 386 Tapered Bushing can
be easily converted to accept 600 Amp Straight
Receptacles
3 Phase Junction,200 Amp Well w/ Load Break
Insert Live End Cap Installed
Straight Receptacle Adapter
Straight Receptacle Housing
13
3 Phase Junction, 200 Amp Well w/ Load Break
Insert, Live End Cap, Straight Receptacle Adapter
and Housing Installed
14
JBY-3A/9B-19 Installed in Vault Style
B Connecting T Elbows Housing
15
JBY-3A/9B-19 Installed in Vault Style B
16
JBY-3A/9B-19 Installed in Vault Style B Ground
system by removing live end cover and attaching
ground elbow
17
JBY Installation
Installed using 200 Amp load break inserts and
elbows as tap to feed 200 Amp service (may also
be used as isolation point and grounding point
for service work).
18
JBY-9A-19
Y Splice, Three Phase, 15/25 kV 200 AmpUsing 200
Amp straight receptacles (dead break) and 200
Amp load break tap or ground point
19
JBY3-1A/2B-26
Y Splice, Three Phase, 35 kV 3 single phase
modules mounted on common frame (3) 1 x 200 Amp
(3) 1 x 600 Amp
20
JBY3-1A/2J-19
Y Splice, Three Phase, 25 kV, 600 Amp run with
straight receptacle interface cast in place and
tapping or grounding position (200 Amp)
21
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com