Title: ABC Hospitality Corporation Asset Manager CapXProject Management Presentation
1ABC Hospitality CorporationAsset
ManagerCapX-Project ManagementPresentation
- December 15, 2006
- By
- Robert Elliott
2(No Transcript)
3Overview of Todays Presentation
- Evolution of SPATSPM.INFO
- SPATSPM The Back-of-the-House
- The Development Process
- Screen Captures
- Live Demo
4www.SPATSPM.info
- SPATSPM Is A Communication Tool For
- Regional Cluster Engineers
- GMs
- Corporate Staff
- Asset Managers
- Contractors
- Manufacturers
- Owners
5What Is SPATSPM.INFO?
- An asset management tool that combines
- Proprietary information,
- Property condition assessments,
- Construction procurement services,
- Contract administration,
- Project management, and
- Warranty management
- Into a unique Internet-based software program
that - Operates in a virtual and near-paperless
environment - Is accessible to multiple concurrent users 24/7
365 days a year
6Evolution of www.SPATSPM.info
- SPATSPM - Designed to meet Marriotts Lodging
Engineering 2005 CAPEX Program - CRST - ?? Billion / annually
- Began from Roof Façade projects
- Increased from 50 to 200 projects in 2005
- Evolved to include LEs corporate program
- HVAC
- Parking Lots
- Fire Alarm
- Roofs
- Facades
- Currently 250 projects on SPATSPM
7SPATSPM Has Unique Functionality
- Automated Functions
- E-mail
- Warranty Expiration
- Staff / Contractors / GMs
- Projected Start Date to Property
- Contractor Upload Bid Proposal
- Contract Writing
- Notice to Bid
- Contractor Schedule
- Property Schedule
- Warranty Calendar/Clock
- User Generated Functions
- Multiple Search Capabilities
- Urgent Issues / Comments
- Limited Read Only Access
- Allows Multiple User Input
8www.SPATSPM.info
- SPATSPM Integrates Manages Information
- Property, Owner Contractor information
- PCA Property Condition Assessment Surveys
- Project type
- Product/Material Submittals
- Material Safety Data Sheets / Problem Resolution
Safety Plans - Pre-Construction / Pre-Bid Meeting Minutes
- Projected start completion dates
- complete
- Warranties / Inspection reports
- Cost accounting
- Certificates of Insurance
- Bid documents
9www.SPATSPM.INFO
- Current Status
- SPATSPM is Marriott Vendor Certified
- Recent Updates
- Project Management Tool
- Schedules/Calendars
- Photo Upload Slide Show
- Email Archive
- Tutorials
- Inspection Reports
- As-Built Drawings
10SPATSPM.INFO Accessible 24/7Anywhere - Anytime
11www.SPATSPM.info
12Back of the House
13Each user is assigned a unique ID and Password
along with a user type role. This restricts the
user to view and/or edit specific types of data.
14SPATSPM can export data to Users in multiple
formats Excel, PDF, HTML, XML, Flash Paper,
Flash Files The web application dynamically
generates the content requested by the User. The
User can not access the database directly. Access
is defined by login and Users role.
Data Flow
Multiple Content Formats
15SPATSPM links various users, tables, views,
procedures and information within a relational
database utilizing reusable object-oriented
code. SPATSPM is scalable, robust designed
for optimal user performance.
16Firewalls
Firewalls
17Software Development The Early Years
- Early days of development focused on
hardware-oriented management Cost - Thorough analysis and design preceded any build
- Software typically was an afterthought
- Procedures developed to manage change
- www.HITIS.org Hospitality IT Standards
- Programmers learned by Trial Error
- The software world was undisciplined and
surrounded by mystique
18Two Decades Later Clients Are Asking?
- Why does it take so long to finish software
programs? - Why are costs so high?
- Why cant we find errors before the product is
given to the customer? - Why do we have difficulty measuring progress as
software is being developed?
19Software Engineering
- Modeling business system requirements and then
directly implementing those models into units of
working code - Object-oriented design develops reusable blocks
of code through - Analysis
- Design
- Coding
- Implementation
20Development Model Types
- Waterfall Cascade
- RAD (Rapid Application Development)
- Iterative
21The Iterative Process
- A practical approach for providing modeling
procedures and contract deliverables. - Utilizes a discovery process for understanding
requirements, services, devices and system
software. - Easily maps back and forth from analysis to
design. - Previous work is always added to or refined as
the results of that work being used in the next
stage of development.
22Iterative Life Cycle
23Project Management
- Good project management requires focused
deliverables and a recommended sequence of
activities.
24Completing the Cycle
- Business Case Modeling
- Writing a Tight Specification Document
- Scope Creep
- Change Order
- Maintenance
- Training
25QUESTIONS?
- Can we customize an interface? Yes
- How long to implement? lt30 days
- How much? Depends on whether you need an
accounting interface and your customized business
requirements
26Can we build one for you?
- CapX Software LLC
- President/CEO
- Robert Elliott relliott_at_capxsoftware.com
- Vice President Product Development
- Julian Lewis jlewis_at_capxsoftware.com
- Director of Technology
- John Petit jpetit_at_capxsoftware.com
- Director Business Development
- Lynn Miller lmiller_at_capxsoftware
- Privacy Advocate/CIO
- Jane Virga, J.D. jvirga_at_capxsoftware.com