Improving Flexibility with Program Management Design Standards, Guideline Criteria and Implementatio - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Improving Flexibility with Program Management Design Standards, Guideline Criteria and Implementatio

Description:

Allows Army/owner to maintain control with highly leveraged core staff. ... Speed All organizations sharing documents much quicker, shortening cycle times. ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 20
Provided by: mikecul3
Category:

less

Transcript and Presenter's Notes

Title: Improving Flexibility with Program Management Design Standards, Guideline Criteria and Implementatio


1
Improving Flexibility with Program Management -
Design Standards, Guideline Criteria and
Implementation
  • Harold Chappell, P.E.
  • CH2M Hill - 1 Program Management Firm for 2004
  • And 1 Construction Management for-Fee-Firm
  • June 14, 2004 Engineering News-Record (ENR)

2
Program Management Tools Get the Job Done
  • Matches the needs of the Owners project with the
    right tools staff to get the job done.
  • Expertly applied tools manage change improve
    cost, schedule quality of constructed project.

3
PM Can Help Owner/Army Manage Their Projects
4
PM Approach Benefits Owner
  • Expert Staff
  • Experienced PM Staff work only when required.
  • Allows Army/owner to maintain control with highly
    leveraged core staff.
  • PM staff work closely with experts from
    specialized disciplines within the firm.

5
PM Approach Benefits Owner
  • Proven Project Delivery Systems
  • Reliable systems, processes tools which take
    advantage of current information technology and
    construction material advances.
  • Construction expertise finds savings in cost
    time.
  • Proven systems combine design technologies with
    construction expertise.

6
PM Approach Benefits Owner
  • Program Manager
  • Single point of contact for all project issues
    (similar to DB).
  • As owners agent, PM acts in Armys best
    interest.
  • PM is independent of biases of A/E Contractor.

7
Design Standards and Guideline Criteria provide
Link for PM Efficiencies
  • By implementing tools from the PM Tool Box in
    conjunction with clearly established standard
    designs, PM can reduce the cost and time of the
    project.
  • More than ever, time is money and reductions in
    delivery time benefits Army and industry.

8
Services Provided with an Completely Integrated
PM Approach
  • Five Groups of Services
  • Construction Management
  • Resident Engineering Inspection
  • Management Support
  • Other Engineering Services
  • Oversight of Design/Build General Contracting

9
Enterprise Program Management
10
Collaboration
Speed All organizations sharing documents much
quicker, shortening cycle times. Accountability
Project teams instantly know where the bottleneck
is located. Standardization Everyone is on the
same page regarding critical information.
11
Continuous Information Updates
  • Provides an
  • Executive Dashboard an
    at-a-glance status of project information
  • Avoids costly re-dos
  • Avoids inaction due to access issues

11
12
When to Use PM Services
Conceptual Planning
H I G H LOW
Design
Procurement
Construction
Start Up
START
TIME
Finish
13
When to Use PM Services
  • The Earlier the Better
  • Reduce cost schedule by optimizing delivery
    options and procurement execution.
  • Design standards and guidelines speed procurement
    planning and execution.

14
When to Use PM Services
  • Before Design Starts
  • Review Contract Documents
  • Proposal Negotiation Support
  • Constructability Review
  • Estimating
  • Scheduling
  • Project Controls

15
When to Use PM Services
  • During Design
  • Continued Constructability Reviews
  • Project Controls - budget control
  • Estimating - trending of construction costs for
    Design-to-Cost contracts.
  • Scheduling - design and construction

16
When to Use PM Services
  • During Construction
  • Bid Award
  • Contract Administration
  • Construction Management
  • Inspection
  • Facility Start-up
  • Close-out

17
PM Services Grouped into Delivery Options
  • Staff Augmentation
  • Traditional Services During Construction
  • 3rd Party Construction Management
  • CM _at_ Risk
  • Multiple Project Management
  • Design/Build
  • DBOOT

18
DBOOT
  • Design/Build/Own/Operate/Transfer
  • We are Design/Builder
  • The interim Owner
  • The Initial Operator
  • Transfers facility to Owner when appropriate

19
PM Services vice Temporary Modular Construction
  • Summary
  • Source of highly skilled individuals with current
    market technology.
  • Can provide permanent construction delivery at
    accelerated rate.
  • The delivery of facility not tied to specific
    construction technique.
  • Standard designs will increase production rates.
Write a Comment
User Comments (0)
About PowerShow.com