1Improving Flexibility with Program Management -
Design Standards, Guideline Criteria and
Implementation
- Harold Chappell, P.E.
- CH2M Hill - 1 Program Management Firm for 2004
- And 1 Construction Management for-Fee-Firm
- June 14, 2004 Engineering News-Record (ENR)
2Program Management Tools Get the Job Done
- Matches the needs of the Owners project with the
right tools staff to get the job done. - Expertly applied tools manage change improve
cost, schedule quality of constructed project.
3PM Can Help Owner/Army Manage Their Projects
4PM Approach Benefits Owner
- Expert Staff
- Experienced PM Staff work only when required.
- Allows Army/owner to maintain control with highly
leveraged core staff. - PM staff work closely with experts from
specialized disciplines within the firm.
5PM Approach Benefits Owner
- Proven Project Delivery Systems
- Reliable systems, processes tools which take
advantage of current information technology and
construction material advances. - Construction expertise finds savings in cost
time. - Proven systems combine design technologies with
construction expertise.
6PM Approach Benefits Owner
- Program Manager
- Single point of contact for all project issues
(similar to DB). - As owners agent, PM acts in Armys best
interest. - PM is independent of biases of A/E Contractor.
7Design Standards and Guideline Criteria provide
Link for PM Efficiencies
- By implementing tools from the PM Tool Box in
conjunction with clearly established standard
designs, PM can reduce the cost and time of the
project. - More than ever, time is money and reductions in
delivery time benefits Army and industry.
8Services Provided with an Completely Integrated
PM Approach
- Five Groups of Services
- Construction Management
- Resident Engineering Inspection
- Management Support
- Other Engineering Services
- Oversight of Design/Build General Contracting
9 Enterprise Program Management
10 Collaboration
Speed All organizations sharing documents much
quicker, shortening cycle times. Accountability
Project teams instantly know where the bottleneck
is located. Standardization Everyone is on the
same page regarding critical information.
11 Continuous Information Updates
- Provides an
- Executive Dashboard an
at-a-glance status of project information - Avoids costly re-dos
- Avoids inaction due to access issues
11
12When to Use PM Services
Conceptual Planning
H I G H LOW
Design
Procurement
Construction
Start Up
START
TIME
Finish
13When to Use PM Services
- The Earlier the Better
- Reduce cost schedule by optimizing delivery
options and procurement execution. - Design standards and guidelines speed procurement
planning and execution.
14When to Use PM Services
- Before Design Starts
- Review Contract Documents
- Proposal Negotiation Support
- Constructability Review
- Estimating
- Scheduling
- Project Controls
15When to Use PM Services
- During Design
- Continued Constructability Reviews
- Project Controls - budget control
- Estimating - trending of construction costs for
Design-to-Cost contracts. - Scheduling - design and construction
16When to Use PM Services
- During Construction
- Bid Award
- Contract Administration
- Construction Management
- Inspection
- Facility Start-up
- Close-out
17PM Services Grouped into Delivery Options
- Staff Augmentation
- Traditional Services During Construction
- 3rd Party Construction Management
- CM _at_ Risk
- Multiple Project Management
- Design/Build
- DBOOT
18DBOOT
- Design/Build/Own/Operate/Transfer
- We are Design/Builder
- The interim Owner
- The Initial Operator
- Transfers facility to Owner when appropriate
19PM Services vice Temporary Modular Construction
- Summary
- Source of highly skilled individuals with current
market technology. - Can provide permanent construction delivery at
accelerated rate. - The delivery of facility not tied to specific
construction technique. - Standard designs will increase production rates.