Title:

2010 FIFA WORLD CUP

Description:

SARF 59th ANNUAL GENERAL MEETING AND SEMINAR. Presented by Wonder ... Wits West Campus, Southgate Mall, Bez Valley, Coca Cola Dome. 4 hrs before match kick-off ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 23
Provided by: stu7200
Category:
Tags: cup | fifa | world | coca

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: 2010 FIFA WORLD CUP


1
2010 FIFA WORLD CUP
  • OPERATIONAL PLAN

5th November 2009 SARF 59th ANNUAL GENERAL
MEETING AND SEMINAR Presented by Wonder Matshiga
2
Contents
  • Background
  • Capital Projects
  • Visitor Groups
  • Accommodation in Johannesburg
  • Serving Strategy
  • BRT
  • Rail
  • PnR
  • Inter City Movements
  • Parallel Events
  • Workforce
  • Conclusion

3
CRITICAL REMINDER WHERE WE NEED TO GET TO!
Compliance The things we must do to fulfill our
contractual obligations
Fan Experience The things we must do to make
this the best fan experience ever
  • Integrated Impact
  • Each Fifa project should also add
  • to the fan experience and
  • create a legacy for the citizens

Legacy The things we must do leave a Positive
legacy for the citizens of the city
4
Background
  • Detail on event staging areas
  • Stadia ( Soccer City Ellis Park)
  • Parallel Events
  • Football for Hope
  • Launch of the 2010 WC
  • Fan Parks
  • Public Viewing Sites
  • IBC

5
Background Continued
  • 63 Matches , 21 Matches in Gauteng and15 Matches
    in Johannesburg
  • Two Stadia Soccer City and Ellis Park
  • 10 during the week at 20h30
  • 5 during the weekend
  • Fan Parks and PVAs to operate for 30 days during
    match and non-match days
  • IBC operations start 2 weeks before the start of
    the WC
  • Broadcasters expecting a 24hr service

6
Capital projects for 2010 WC
  • BRT Infrastructure
  • Nasrec Public Transport Hub 95 Complete
  • Pedestrian Promenade 100 Complete
  • Ellis Park precinct 100 complete
  • Nasrec Railway Station Dec 09
  • Doornfontein Station 100 Complete
  • Orlando Train Station 100 Complete

7
Visitor Groups
8
Accommodation in Johannesburg
Summary of City of Johannesburg 2010
Accommodation
9
Places of Interest
  • Two match venues Soccer City Ellis Park
  • 4 training Venues Ruimsig, Dobsonville, Orlando
    and Rand Stadium
  • 2 Fan Parks
  • 1 PVA and 8 Township Tvs

10
Serving Strategy
  • Rail as a mass mover
  • BRT Event Service
  • Existing Public Transport Operations
  • Park and Ride overlay service

11
Serving Strategy
12
Serving Strategy
13
TRANSPORT BRT - Phase 1A Network
14
Phase 1A for June 2010
  • 25,5 kms of trunk infrastructure 20 stations
  • 143 BRT buses (41 articulated 102
    complementary)
  • One new BRT Bus Operating company
  • Estimated 575 taxis to be subsumed
  • A shared BRT control centre at JRA Head Office

15
Rail
  • Rail Network in the CoJ
  • 10 Dedicated Train Sets
  • Normal Commuter Service
  • Rail Capacity- 30-40
  • Station Upgrades
  • Nasrec Station
  • Doornfontein Station
  • Orlando Station
  • Park Station Main Hub

16
Park and Ride locations
17
Park and Rides continued
  • Overlay service supporting BRT and Rail
  • Wits West Campus, Southgate Mall, Bez Valley,
    Coca Cola Dome
  • 4 hrs before match kick-off
  • 4 hrs after kick-off
  • Routes pre-designed by the City with options AB
  • Shuttle services to be done by both Bus and Taxi
    Operators

18
Inter City Movements
19
Inter City Movements
20
Parallel Events
  • Football for Hope
  • Festival duration 27 June - 12 July
  • Public part of the festival 4 - 10 July
  • Location No. 3 square in Alexandra,
    Johannesburg
  • Free of charge
  • Facts on the Fifa Kick-Off Concert
  • Festival date 10th June 2010
  • Start at 2000 to 2300 and gates open at 15h00
  • Estimated number of spectators 20 000 30 000
    spectators
  • Cost of tickets - R300 R2000

21
Workforce Recruitment
  • High level personnel including drivers
  • All workforce to be security vetted by the NIA
  • Workforce training to begin early 2010
  • Workforce to be in uniforms
  • Volunteer programme closed in August 2009 and
    interviews will be conducted in January 2010.

22
Conclusion
  • THANK YOU