FRPA Quiz Show - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

FRPA Quiz Show

Description:

The practice requirements in FPPR can be changed through an approved: ... Manager have to approve or disapprove a licensee's declaration that a road is deactivated? ... – PowerPoint PPT presentation

Number of Views:22
Avg rating:3.0/5.0
Slides: 26
Provided by: lmcqu
Category:
Tags: frpa | disapprove | quiz | show

less

Transcript and Presenter's Notes

Title: FRPA Quiz Show


1
FRPA Quiz Show
  • Harvesting Roads Module
  • FRPA Training Program
  • February 2004

2
Practice Requirements
  • The practice requirements in FPPR can be changed
    through an approved
  • a) Exemption to some practice requirements
  • b) Alternative in FSP to default results and
    strategies in FPPR
  • c) Both a and b
  • d) a only

3
Practice Requirements
  • Answer C a and b
  • The practice requirements in FPPR can be changed
    through an approved
  • a) Exemption to some practice requirements
  • b) Alternative in FSP to default results and
    strategies in FPPR

4
Transition to FRPA
  • Harvesting under a cutting permit issued for
    areas under an approved FDP can continue once
    FRPA is in effect.
  • True
  • False

5
Transition to FRPA
  • Answer True in this case, harvesting follows
    the requirements of the FPC
  • Harvesting under a cutting permit issued for
    areas under an approved FDP can continue once
    FRPA is in effect.

6
Notify Government
  • Licensees must notify government before
  • a) Starting timber harvesting
  • b) Starting construction of roads that are
    permanent access structures
  • c) Starting layout of cutblocks and roads
  • d) All of the above
  • e) a and b

7
Notify Government
  • Answer E a and b
  • Licensees must notify government before
  • a) Starting timber harvesting
  • b) Starting construction of roads that are
    permanent access structures

8
Maximum Cutblock Size
  • An alternative result or strategy to the maximum
    cutblock size of 40 ha and 60 ha can be proposed
    in the FSP.
  • True
  • False

9
Maximum Cutblock Size
  • Answer True
  • An alternative result or strategy to the maximum
    cutblock size of 40 ha and 60 ha can be proposed
    in the FSP.

10
Green-up
  • An exemption to the requirement for harvesting
    adjacent to another cutblock can be obtained from
    the Minister of Forests.
  • True
  • False

11
Green-up
  • Answer False an alternative result and/or
    strategy can be proposed in the FSP but not an
    exemption.
  • An exemption to the requirement for harvesting
    adjacent to another cutblock cannot be obtained
    from the Minister of Forests.

12
Wildlife Trees Retention Areas
  • An alternative result or strategy to the
    restriction on harvesting in a wildlife tree
    retention area can be proposed in the FSP.
  • True
  • False

13
Wildlife Trees Retention Areas
  • Answer True -- an exemption can also be
    requested from the Minister of Forests.
  • An alternative result or strategy to the
    restriction on harvesting in a wildlife tree
    retention area can be proposed in the FSP.

14
Course Woody Debris
  • Course woody debris requirements include
    retaining at least 4 logs per hectare on a
    cutblock.
  • True
  • False

15
Course Woody Debris
  • Answer True
  • Course woody debris requirements include
    retaining at least 4 logs per hectare on a
    cutblock.

16
Defences under FRPA
  • Defences under FRPA are
  • a) Due Diligence
  • b) Mistake of Fact
  • c) Officially Induced Error
  • d) Consistency with objectives
  • e) a, b and c only
  • f) All of the above

17
Defences under FRPA
  • Answer E a, b and c
  • Defences under FRPA are
  • a) Due Diligence
  • b) Mistake of Fact
  • c) Officially Induced Error

18
Annual Report
  • One of the items to report in the Annual Report
    is the location of wildlife habitat features in
    or contiguous to a cutblock/road that has not
    previously been reported (and required to be
    reported).
  • True
  • False

19
Annual Report
  • Answer True
  • One of the items to report in the Annual Report
    is the location of wildlife habitat features in
    or contiguous to a cutblock/road that has not
    previously been reported (and required to be
    reported).

20
Road Layout and Design
  • RLAD plans are required but not approved under
    FRPA .
  • True
  • False

21
Road Layout and Design
  • Answer False -- FRPA requires roads and
    structures to be constructed such that they are
    structurally sound and safe and to engineering
    requirements were established.
  • RLAD are not referred to, nor required, nor
    approved under FRPA.

22
Road Deactivation
  • Under FRPA , how long does a District Manager
    have to approve or disapprove a licensees
    declaration that a road is deactivated?
  • a) 60 days
  • b) 15 months
  • c) 15 years
  • d) Length specified by licensee in declaration

23
Road Deactivation
  • Answer B
  • Under FRPA , how long does a District Manager
    have to approve or disapprove a licensees
    declaration that a road is deactivated?
  • b) 15 months

24
Responsibilities
  • When harvesting and constructing roads under FRPA
    , licensees are responsible for
  • a) Delivery of results and strategies in an
    approved FSP
  • b) Delivery of government objectives
  • c) Meeting practice requirements in regulation
  • d) All of the above
  • e) a and c

25
Responsibilities
  • Answer E a and c
  • When harvesting and constructing roads under FRPA
    , licensees are responsible for
  • a) Delivery of results and strategies in an
    approved FSP
  • c) Meeting practice requirements in regulation