Determining Watershed Parameters for Water Rights in theCypress River Basin - PowerPoint PPT Presentation

About This Presentation
Title:

Determining Watershed Parameters for Water Rights in theCypress River Basin

Description:

Determining Watershed Parameters for Water Rights in the Cypress River Basin. By: Hema Gopalan ... Exciting Cypress !!! The Mess. Control points. Stream network ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 16
Provided by: nram9
Category:

less

Transcript and Presenter's Notes

Title: Determining Watershed Parameters for Water Rights in theCypress River Basin


1
Determining Watershed Parameters for Water Rights
in the Cypress River Basin
By Hema Gopalan GIS in Water Resources (C E
394K) Fall 2001
2
Background
  • Development of Water Availability Model (WAM)
    by TNRCC

2. The model should determine
?
?
  • Whether sufficient water is available
  • Amount of water for each water right
  • Percent of time it is available

?
3
WRAP model
  • TNRCC provides location of water rights, CRWR
    determines
  • Watershed parameters for those water rights
    and the contractor
  • uses the parameters to provide water
    availability data.
  • Wrap1117 project developed in ArcView 3.2 to
    establish
  • watershed parameters for water rights.
  • 19 out of the 22 basins completed.

4
Parameters
  • Upstream area of each control point

2. Average upstream precipitation
3. Average upstream Curve Number
4. Connectivity of water rights
5. Flow length to outlet
5
Exciting Cypress !!!
6
The Mess
Control points
Stream network
7
Buffer zone and surrounding streams
  • The basin outline is buffered
  • by a 10 Km zone
  • This is to ensure all appropriate
  • areas are captured
  • All streams must drain
  • off the DEM for proper
  • grid processing

8
Grids Grids Grids!!!
DEM grid
Burn Grid
Flow Accumulation grid
Flow Direction grid
Fill grid
9
More grids
Average precipitation
Average CN
10
DEM stream network
64
32
128
Original stream network
1
16
8
2
4
DEM stream network
11
Snapped control points to DEM stream
Snapped control points
Original control points
12
Watershed Delineation
Network created to determine connectivity between
control points
Watershed boundaries are delineated for each
control point
13
Results
Comparison of results with USGS data
Percent difference should be less than 3
HUC area for Gage 7346000 is 893Mi2
14
Acknowledgements
Dr. Maidment
Melissa Figurski
Research group at CRWR
15
Q U E S T I O N S ????
Write a Comment
User Comments (0)
About PowerShow.com