DN Operation - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

DN Operation

Description:

Obligation For 1 In 20 Capacity. DNCC Operates Networks Under ... Xmas period 2005; 5 degree error within day. Rebalance DN Supply to Meet Demand Changes ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 17
Provided by: bd995
Category:
Tags: operation | xmas

less

Transcript and Presenter's Notes

Title: DN Operation


1
DN Operation
  • Iain Ward
  • DNCC Manager

2
Responsibilities
  • Licence Holder
  • Obligation For 1 In 20 Capacity
  • DNCC Operates Networks Under Direction of The DN
  • Winter / Summer Operating Strategy
  • Booked Capacities
  • Short Term Variations
  • DN Specific Issues
  • DNCC Makes Within-Day Decisions Regarding
  • Supply Demand Balancing
  • Control of Unbilled Energy
  • Plant Outage
  • Planned
  • Unplanned (faults)

3
Daily Operations Key Stages
  • Forecast Demand
  • Define Diurnal Profile
  • Programme Intakes
  • Manage Demand Changes
  • Respond to NTS Change Requests

4
  • Manage LDZ Take, Demand and Stock

5
Forecast Demand
  • LDZ Level
  • Weather Data (NDM)
  • VLDMC OPNs (DM)
  • Approx 5 Demand Change per 1 deg C

6
Demands and Temperature Relationship
7
Define Diurnal Profile
  • Diurnal Swing in the Range 12 15
  • Significance of Minimum Stock Time
  • Storage Deficit in most DNs
  • Storage Utilisation in Defined Order
  • DN Linepack
  • DN LP Storage
  • DN Bullets
  • NTS Flow Variation

8
Diurnal Profiles
Demand Profile
Empty Holders Linepack,
B
A
A
C
Supply Rate
Storage Requirement A B - C
Fill Holders Linepack
1200
1800
2400
0600
0600
9
  • Manage LDZ Take, Demand and Stock

10
Programme Intakes
  • Remote Control of Offtake Utilisation
  • Notifications to NTS via OPN Process
  • Day Ahead and Within Day Considerations
  • Meet Sub-LDZ Flow Requirements
  • Pressure vs Volumetric Control
  • Shrinkage Considerations
  • Plant Outage
  • Reflective of OCS Where Possible
  • Request Additional Flow Flex via OPN Where
    Necessary

11
CV Management
St Fergus / Teesside Gas (39.2 - 41.5 MJ/m3)
St Fergus Gas (40 - 41.5 MJ/m3)
Easington/ Rough Gas (38.1 - 38.7 MJ/m3)
St Fergus / Barrow Gas (38.4 - 41.5 MJ/m3)
Theddlethorpe Gas (38.2 - 38.7 MJ - m3)
Bacton Gas (38.2 - 38.6 MJ/m3)
12
Manage Demand Changes
  • Forecast Updated 8 Times Daily (UNC timings) plus
    up to 5 ad-hoc.
  • Respond to Revised Weather Data
  • Xmas period 2005 5 degree error within day.
  • Rebalance DN Supply to Meet Demand Changes
  • Revised Offtake Rates
  • Impact on storage requirement
  • Allocation to Volumetric Offtakes balance effect
    of pressure control?

13
Respond to NTS Change Requests
  • NTS To Anticipate Supply Rate Changes,
    Commercially and Physically Driven
  • NTS Outages
  • Planned e.g. On-Line Inspection
  • Un-Planned e.g. Faults
  • NTS VLDMC renominations

14
DNCC Offtake Performance
  • Booked Flat Capacity Limits Observed at DN Level
  • Booked Flow Flex Limits Exceeded at LDZ Level
  • Some Offtakes on Some Days
  • Pressure Controlled Flows Defined by Consumers
  • Within-day demand changes flow through into
    FlowFlex calculation.

15
LDZ 1
16
LDZ 2
Write a Comment
User Comments (0)