Urban public transport modes - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Urban public transport modes

Description:

Travel time between stops. Lost time accelerating. Boarding and ... Mixed traffic, cheap, no flexibility, affected by power failures. Vehicle Capacity: 100-200 ... – PowerPoint PPT presentation

Number of Views:404
Avg rating:3.0/5.0
Slides: 16
Provided by: wendyb7
Category:

less

Transcript and Presenter's Notes

Title: Urban public transport modes


1
Urban public transport modes
  • Operations
  • Right-of-way
  • Criteria for selection
  • Modes
  • Para-transit
  • Bus
  • Light Rail Transit
  • Suburban rail
  • Rapid rail

2
Public transport operations (1)
  • Begins and ends with walking
  • Private transport walking is short
  • Public transport trip
  • Depends on location of route
  • More than one vehicle or mode
  • Longer walk
  • Transfers
  • Feeder
  • Line haul
  • Distributor
  • Public transport focused on the CBD and
    corridors one-mode trips accounting for the
    majority of public transport trips
  • Low volume vehicles
  • Low density areas
  • Penetration
  • High volume vehicles
  • High density activity areas
  • Economies of scale

3
Public transport operations (2)
  • Travel time between stops
  • Lost time accelerating
  • Boarding and alighting passengers
  • Lost time decelerating
  • Distance / cruising speed

Speed
Time
Distance
4
Public transport operations (3)
  • Round trip time
  • One-way travel time 2
  • Turn-around time
  • Schedule

5
Rights-of-way
  • Category b
  • Longitudinally separated, priority at crossings
    pedestrians and vehicles allowed to cross
  • Category c
  • In mixed traffic maybe preferential treatment at
    signals
  • Strips of land used by public transport vehicles
    defined by degree of segregation
  • Category a
  • Totally segregated
  • Crossings if any do not affect operations

6
Criteria for assessment (1)
  • Ability to cope with demand
  • Cost
  • Total cost/pass.km
  • Affordability of capital cost
  • Capital cost/operating cost ratio
  • Sensitivity to cost overruns and patronage
    overestimates
  • Percentage cost recovery (fare evasion)
  • Environmental
  • Safety
  • Savings in journey time/speed
  • Reliability
  • Other
  • Comfort
  • Convenience
  • Interchanges
  • Flexibility
  • Sophistication
  • Difficulty to implement

7
Criteria for assessment (2)
  • For 20km

8
Para-transit
  • Many shapes in SA the minibus
  • Popular, filled the gap left by organised
    services when settlement expanded
  • Service varies
  • Operators choose vehicle, route, frequency, time
    of operation
  • Regulation?
  • Flexibility of service
  • Profitable, not subsidised
  • Vehicle Capacity few to 18
  • Way capacity 10 800pass/hr
  • Journey speed 35 km/hr
  • Capital cost/veh R110 000
  • R0,22/pass km

9
The Recap minibus ?
10
Bus transport (1)
  • Motorised
  • Prevalent correct level of technology ???
  • Operate on specified routes according to a
    schedule
  • Vehicle Capacity
  • Midibus 35
  • Standard bus 65-90
  • Articulated bus 105-275
  • Way capacity 17 500 - 27 000 pass/hr
  • Journey speed 24km/h
  • Midibus R230 000
  • Bus R600 000
  • R0,20/pass-km
  • Electric trolley buses

11
Bus transport (2)
12
Light rail transit (1)
  • Features
  • Board from road or low platform
  • Single vehicles or small trains
  • B or C rights-of-way
  • Types
  • Tramway
  • LRT
  • LRT Metro
  • Tramway
  • Mixed traffic, cheap, no flexibility, affected by
    power failures
  • Vehicle Capacity 100-200
  • Way capacity 6000 -12000 pass/hr
  • Journey speed 12 km/hr

13
Light rail transit (2)
  • LRT
  • Operates along the side of the street or in
    separate rights-of-way
  • Grade separated crossings or priority
  • Boarding from low platforms
  • Trains of 2-3 coaches
  • Vehicle Capacity 250-900
  • Way capacity 20000 -36000 pass/hr
  • Journey speed 15 - 25 km/hr
  • Cost -R12m/car
  • R1,3 /pass-km??
  • LRT METRO (as for metro)

14
Suburban rail
  • Shares tracks with inter-city passenger and
    freight trains
  • Tracks and vehicles are old require
    rehabilitation and refurbishing
  • 10, 12 and 14 coach sets
  • Vehicle Capacity 2750/12-coach
  • Way capacity 55 000 pass/hr
  • Journey speed 29 km/hr depends on station
    spacing and priority given to passengers
  • Cost R65m /train
  • Cost R 0,16/pass-km
  • Cost R13m/km of track
  • Cost R4,5m/station

15
Rail rapid transit
  • Exclusive right-of-way
  • Sophisticated operations and maintenance
  • High platforms, walk on directly
  • Difficult to change routes
  • Re-routing of bus services to augment passenger
    numbers
  • Reliable
  • Way capacity 80 000 pass/hr
  • Journey speed 30-35 km/hr
  • Cost
  • US 40-120 m/km of track
  • Operating US0,10 - 0,15 US pass.km ???
  • Total 15 - 25 US cents/pass.km??
Write a Comment
User Comments (0)
About PowerShow.com