Central Africa Power Pool (CAPP) - PowerPoint PPT Presentation

About This Presentation
Title:

Central Africa Power Pool (CAPP)

Description:

DR Congo, Congo, Gabon, Equat. Guinea, Cameroon, Nigeria. Inga ... Electrification of Kye-Ossi (Cameroon), Ebebiyin (Equatorial Guinea) and Meyo-Kye (Gabon) ... – PowerPoint PPT presentation

Number of Views:1451
Avg rating:3.0/5.0
Slides: 6
Provided by: icaf8
Learn more at: https://www.icafrica.org
Category:
Tags: capp | africa | arabia | central | gabon | pool | power | saudi

less

Transcript and Presenter's Notes

Title: Central Africa Power Pool (CAPP)


1
Central Africa Power Pool (CAPP)
SESSION 3OVERVIEW
2
CAPP Members
  • COUNTRIES
  • Angola
  • Burundi
  • Cameroon
  • CAR
  • Congo
  • Congo (R.D.)
  • Gabon
  • Equat. Guinea
  • Rwanda(1)
  • Sao Tomé and Principe
  • Chad

COMPANIES Ene-ep Edel Regideso Aes
Sonel Enerca SNE Snel Seeg Segesa Electrogaz(1) Em
ae Stee
(1) Membership not yet effective
3
CAPP Overview
  • CAPP was set up in April 2003
  • Main Objective Organize and manage an electric
    power market to satisfy all power demands in
    Central Africa through an interconnected electric
    network
  • Key activities undertaken so far
  • Administrative and physical installation of CAPP
    and preparation of additional legal management
    texts
  • Preparation of final report of preliminary study
    on master plan for establishment of an electric
    power market in Central Africa by 2025
  • Identification of priority integrating projects
    (PIP) and projects of the Pilot Cross-border
    Electrification Programme (PPET) preparation of
    data sheets and terms of reference for studies on
    the said projects
  • Production of communication documents and the
    Action Plan 2006-2010
  • Activities for CAPP capacity building
  • Next key activities planned
  • Preparation of feasibility studies on 2 PIP
    projects and 4 PPET projects
  • Adoption of technical, legal, commercial and
    regulatory instruments
  • for the regional electric power market
  • Organization of a Power Forum on projects to
    establish a regional electric power market

4
Upcoming Key Projects in CAPP Area (I)
Type(1)
Country (ies)
Project Name
Est. Cost (M)
Est. Readiness
Nr.
REHAB HYD GEN
DR Congo
Development of Inga Site
Studies 20,0 Implementation - Rehab 600.0 -
Hyd Gen 3 500 18 000
Studies 14.0 M available in ADB Studies on
Inga 3 ongoing (Westcor project) Pref. on Grnd
Inga conducted
1
TRANS
DR Congo, Congo, Gabon, Equat. Guinea, Cameroon,
Nigeria
Inga Calabar Interconnection
Studies 3.0 Implementation 1 770.0
Draft TOR of studies ready Draft Legal Memoranda
of Understanding ready
2
TRANS
DR Congo, Angola, Congo
Inga - Cabinda - Pointe Noire Interconnection
Studies 1.0 Implementation 97.3
TOR for studies available Legal Memoranda of
Understanding signed
3
TRANS
Chad, Cameroon
Chad Cameroon Interconnection
Studies 0.3 Implementation
Prefeasibility study already conducted
4
(1) Key REHAB rehabilitation and expansion
project HYD GEN hydropower plant GAS GEN
gas-fired generation project DIV GEN
other type of power plant TRANS transmission
project DIST distribution project OTHER
other type
5
Upcoming Key Projects in CAPP Area (II)
Type
Country (ies)
Project Name
Est. Cost (M)
Est. Readiness
Nr.
HYD GEN OTHER
DR Congo, Central African Republic
Cross-border electrification of Zongo (DRC) from
Bangui (CAR)
Studies 0.13 Implementation 28.0
Prefeasibility conducted TOR studies and project
information sheets ready Legal Memorandum of
Understanding signed Finan. promise BADEA
5
OTHER
DR Congo, Central African Republic
Cross-border electrification of 7 villages (CAR)
from Mobaye (DRC)
Studies 0.39 Implementation 13.8
TOR of studies and project information sheets
ready Promise of financing of works by BADEA
6
OTHER
Chad, Cameroon
Electrification of Léré, Para, Ribao, Momboré,
Mamboroua and Binder (Chad) from Guider
(Cameroon)
Studies 0.26 Implementation 9.8
Prefeasibility conducted TOR of studies and
project information sheets ready Promise of
finan. of works BADEA
7
OTHER
Cameroon, Equatorial Guinea, Gabon
Electrification of Kye-Ossi (Cameroon), Ebebiyin
(Equatorial Guinea) and Meyo-Kye (Gabon)
Studies 0.26 Implementation 7.5
Prefeasibility conducted TOR of studies and
project information sheets ready
8
(1) Key REHAB rehabilitation and expansion
project HYD GEN hydropower plant GAS GEN
gas-fired generation project DIV GEN
other type of power plant TRANS transmission
project DIST distribution project OTHER
other type