BASIC COAL FIRED BOILER ATTENDANCE TRAINING COURSE - PowerPoint PPT Presentation

1 / 23
About This Presentation
Title:

BASIC COAL FIRED BOILER ATTENDANCE TRAINING COURSE

Description:

BASIC COAL FIRED BOILER ATTENDANCE TRAINING COURSE COURSE OPTIONS BASIC BOILER OPERATORS COURSE Written Report issued to the Department on each student COURSE OPTIONS ... – PowerPoint PPT presentation

Number of Views:403
Avg rating:3.0/5.0
Slides: 24
Provided by: boilersfo
Category:

less

Transcript and Presenter's Notes

Title: BASIC COAL FIRED BOILER ATTENDANCE TRAINING COURSE


1
BASIC COAL FIRED BOILER ATTENDANCE TRAINING COURSE
2
TO TRAIN BOILER OPERATORS TO GENERATE STEAM
SAFELY, EFFICIENTLY AND COST EFFECTIVELY
OBJECTIVE
3
Minimum trainee requirements
  • Good eye sight.
  • Good hearing.
  • Physically fit and mentally alert.
  • A sober disposition.
  • Ability to work and move around in confined
    spaces.
  • A tolerance to heat, loud noises and heights.
  • Literate

4

Dryden Combustion Present BOILER OPERATOR
TRAINING COURSE
5
BASIC SUBJECTS COVERED DURING THE TRAINING
PROGRAMME
  • Example of some items covered during the
    Training Course which contribute to the
    efficient use and correct operation
    of your boiler

6
  • Identifying the component parts by name and
    knowing their function and how to test them.
  • Gauge Glasses
  • Undergrate Dampers
  • Mobreys
  • Different Valves
  • Boiler
  • Sootblowers
  • Water treatment
  • Coal Handling Equipment
  • Plus more .

7
2. Preliminary checks undertaken by the
operator before lighting up the boiler and
raising steam pressure
8
PRELIMINARY CHECKS-
  • Water level
  • Coal
  • Ash removal trolley
  • Water softener
  • Chemicals
  • Grit removal trolley
  • Valve positions

9
3. The CORRECT way to light a fire and raise
steam pressure-
  • Guillotine door height
  • Length of coal bed
  • Where to place the wood fire
  • All other relevant steps up to raising steam
    pressure

10
4. Maintaining steam pressure safely and
efficiently-
  • Understanding correct air fuel ratios
  • Ash removal
  • Blowdown Procedure
  • and more

cost impact saving approximately 10 of your
current coal costs
11
Banking the fire correctly-
  • Correct tools to complete the task
  • Proper personal protection equipment for the
    tasks
  • Advantages-

- Not to make a fire from start up again
- Raise steam pressure without causing stress
to the boiler.
12
Starting up from a banked fire-
  • Procedure on how to re-ignite correctly
  • Valve Positions
  • Damper Settings

13
Emergency procedures-
  • Power failure
  • Safety valve blow off
  • Shear pin failure
  • Broken gauge glass
  • Blowdown valve jams in the open position

14
Shutdown and standby procedure-
  • Correct shutting down of a boiler for more than
    18 hours.
  • Short standby (30 mins or less)

15
Problems and remedies-
  • Identification of problem
  • Diagnosis of problem and apply correct remedies.
  • Protecting the boiler
  • Do not waste time and coal

16
(No Transcript)
17
COURSE OPTIONS
18
BASIC BOILER OPERATORS COURSE
  • Preliminary Exam Written to Evaluate each
    Trainees Capability
  • Course conducted in English by a multi-lingual
    SETA registered Facilitator
  • Theory conducted in a classroom together with
    DVD presentations
  • Practical training conducted in the boiler
    house
  • Final Exam
  • Examinations evaluated by a SETA registered
    Assessor
  • Issuing of Certificate
  • Boiler Operator Cap to successful students
  • Written Report issued to the Department on each
    student

19

20
COURSE OPTIONS
  • Individual on site training course to be run
    at your factory on your boiler

or
  • Purchase DVD Training Course. Course to be owned
    and run by the client, in their own time. Future
    training / refresher courses will then be at no
    additional costs to the Company

or
  • On site training of operators backed up by the
    DVD Training Course which shall remain on site
    for constant refresher courses for the operators
    at no additional cost

21
DURATION OF EACH COURSE
  • Each Course will take 5 days (40 hours)
  • Traveling to and from site will be additional

22
REQUIREMENTS
  • 1. Classroom complete with tables and chairs,
    white board and markers

2. Availability of fully operational stand-by
boiler for start / stop operation during
practical training
3. Recommendation of a maximum of 8
students per class

23