Lower Level Girls' Locker Room: Concrete benches poured Thursday. Lower Level Boys' Locker Room: Concrete Benches. Lower Level - Painting ... – PowerPoint PPT presentation

Number of Views:75
Avg rating:3.0/5.0
Slides: 62
Provided by: rcps4
Category:

less

Transcript and Presenter's Notes

Title: Administration Reception and Hallway


1
Administration Reception and Hallway
2
Administration Principals Office
3
Administration Media Addition A-Hall to the
East
4
Administration Media Addition
5
Administration Media Addition
6
Administration Media Addition
7
Administration Media Addition
8
Administration Media Addition
9
Administration Media Addition
10
Administration Media Addition
11
A-Hall
12
A-Hall
13
A-Hall
14
A-Hall Restrooms
15
A-Hall Restrooms
16
B-Hall classroom freshly waxed floor
17
B-Hall
18
B-Hall Locker installation begins
19
C-Hall
20
C-Hall
21
C-Hall HM Frames at Media Center
22
C-Hall English Resource Room
23
C-Hall Restrooms Flooring in progress
24
C-Hall Typical Classroom
25
D-Hall
26
D-Hall
27
D-Hall Math Resource Room
28
D-Hall Glue prior to VCT installation
29
D-Hall - Restrooms
30
E-Hall (Back Hallway) Typical Classroom
31
E-Hall Terrazzo floor installation in progress
at East end
32
Back Hallway at Media Courtyard
33
Home Economics Classroom
34
Cafeteria
35
Cafeteria Expansion Friday morning
36
Cafeteria Friday morning
37
Cafeteria Friday at Noon
38
Outdoor Dining
39
Cafeteria on left - Outdoor Dining Area between
building
40
Loading dock outside of the Kitchen
41
Kitchen Floor as seen Thursday with clear coat
42
Kitchen Floor as seen Friday morning
43
Lower Level Girls Locker Room Concrete
benches poured Thursday
44
Lower Level Boys Locker Room Concrete Benches
45
Lower Level - Painting
46
Lower Level Hanging wire for drop ceiling
Friday morning
47
Mechanical Room - Pumps for Geothermal system
48
Mechanical Room - Pumps and piping for Geothermal
system
49
Science Addition Exterior Ceiling
50
Gym Roof top equipment placement - Friday
51
Site work - Sidewalk
52
Site work - Sidewalk
53
Site work - Sidewalk
54
Site work - Curbing
55
Site work - Curbing
56
Site work Front overview
57
Site work Bus Parking
58
Site work Lot G Topsoil Stripping
59
Site work Lot G Topsoil Stripping
60
Site work
61
Site work Storm drain installation on West side
of E-Wing