Title: MineMAX Resource Optimization Technologies provides integrated planning and scheduling solutions for
1 2- MineMAX Resource Optimization Technologies
provides integrated planning and scheduling
solutions for the mining industry. - From pit optimization to long and short term
scheduling for both open pit and underground
operations, MineMAX handles the complexities of
mine optimization, planning and scheduling. - Solutions for
- Pit Optimization
- Long term Scheduling
- Short term Scheduling
- Open Pit Scheduling
- Underground Scheduling
3MineMAX Scheduler - Strategic Mine Schedule
Optimization iGantt - Production Scheduling
short term MineMAX Planner - Pit Optimization
4- It uses leading-edge optimization technology to
optimize the NPV of mines. - It is unique in its ability to handle blending
constraint and manage Intermediate stockpile
while optimising NPV. - Scheduler able to plan strategically for the
future, yet quickly respond to the day to day
changes of a competitive business environment.
5Planner brings together the technologies of
optimization and 3-D interactive visualization to
provide a mining engineer with a user-friendly,
fast tool for determining optimal pits and
performing strategic analysis
6- iGantt is a tool for open-pit and underground
production scheduling that integrates Gantt
chart, 3D visualization and spreadsheet views of
a production schedule. - iGantt can be used for scheduling a single
operation or multiple operations across an
enterprise.
7Report Window
8iGantt Interfaces
9iGantt Geometry Imports
- Solids
- Vulcan (.00t), Surpac (.dtm), Datamine (.dm)
- DXF (.dxf)
- Strings
- Vulcan (.dgd), Surpac (.str), Datamine (.dm),
Micromine - DXF (.dxf)
- Block Models
- Vulcan (.bmf), Surpac (.mdl), Datamine (.dm)
10Scheduling Methods
- Visually from 3D view in context of assigning
digging equipment - Gantt chart based scheduling
- Automatically generate activities from production
schedule with precedences - Related batter work development scheduling
11- Activity-based or resource-based scheduling
- 3-D point and click scheduling
- Create activities from
- Numerical Model ODBC Database or File import
- Geometric Model strings or wireframes
12Features 2
- Definable Attributes and Activity Types
- Assign precedences between Activities with
optional allocation of lag - Definable Reports
- Define View by Attributes (Mine, Pit, Bench,
Blast, Block) - Calculable attributes (a1 f(a2,a3))
13Scheduling Methods
- Graphical / Visual Scheduling with Gantt chart
based scheduling - Automatically generate activities from
production schedule with precedences
14- Interactive Gantt Chart-based Scheduling
15(No Transcript)
16Stockpiling Module
- Automatically compute stockpile runs
- Splits out defined products
- View composition of stockpile as you schedule
mining production
17- Combination of equipment scheduling with
stockpile - run management
- Match stockpile completions to production
requirements
Stockpiles are grouped according to type, each of
which is linked to an individual quantity
attribute and Capacity.
18Conclusion
- Easy to use visual scheduling
- Open cut or Underground
- Integrate long-term with short-term
- Two way integration with GMP
- Integration with corporate databases
- Powerful scripting capabilities
19COSTS vs BENEFITS
Annual Costs
Leading Edge -worlds best practice.
Annual Benefits
Maintenance Support
- Reduced Production Costs
- Efficient mine scheduling - resource definition,
optimal pit design, optimal schedule (short
medium long term ) - Increase productivity through integration
- Increase responsiveness to unplanned events by
re-scheduling
Technology Transfer
Training
iGantt Software License
- Increased Capital Efficiency/ Reduced Costs
- Equipment utilisation
- Resource scheduling based on project calendar
Hardware
(Initial investment )
Payback Less than 1 Year