Experience from the maintenance phase in
international projects
  • Dragan Bojic
  • University of Belgrade

2
General Projects Characteristics
  • Both for software market and for known customer
    (outsourcing)
  • Geographically distributed development/testing/dep
    loyment
  • Most communication via Internet (emails, ftp,...)
  • Offline integration (no web VCS)
  • Iterative development
  • Alpha release (Prototype)
  • Beta release
  • Production release 1.0
  • Production release 1.0.1 (patch for user XY)
  • Production release 1.1 (new functionality)
  • ...
  • maintenance moving from one release to another

3
Supporting processes for the maintenance phase
  • Configuration management
  • Change Request Management
  • Purpose control change to, and maintain
    integrity of, project artifacts (Rational
    Unified Process)
  • Artifact intermediate or final work products
    produced and used during a project
  • Models
  • Documents
  • Source code
  • ...

4
Configuration Management
  • Process organization at RistanCASE, GmbH
  • About 30 team members
  • Telejob working environment
  • Offline integration

5
CM with offline integration team member actions
baseline
1 Store baseline
DAC_5_0_A100
from delivery
Local CM
media to local
baseline
repository with
repository
DAC_5_0_A100
tailoring
2 Checkout to
Team
branch
local workspace
Member
A100NN1
NN
delta file
3 Verify resolve
integration conflicts
4 Make some
5 Checkin to
6 Send delta for
changes
repository
integration
NN's
Workspace
FTP server
6
CM with offline integration
2 Store deltas to
local repository
1 Send
integration notice
FTP server
3 Checkout to
baseline
workspace
DAC_5_0_A100
Integrator
branch
4 Merge NN1
A100NN1
changes
delta file
branch
5 Merge XY4
A100XY4
changes
Integration
delta file
Workspace
6 Resolve
7 Checkin new
baseline
Local CM
integration conflicts
baseline
repository
DAC_5_0_A101
8 Create
distribution
7
Configuration Management- Access Control
  • A Workspace defines access rights to individual
    artifacts (not accessible at all, read only,
    read-write).
  • Associated with groups of team members
  • wDEV developers workspace (source code files,
    models, etc)
  • wDEV_SubsystemX part od wDEV assoc with a
    particular subsystem (component)
  • wTST test team member workspace (test specs,
    test cases, etc)
  • wDOC user documentation workspace
  • wMGR manager workspace (plans, reports, etc)
  • .access file for mapping project directories and
    individual artifacts to workspaces
  • di\adg\di\cadg\lib wDEV wDEV_ADG
  • di\adg\di\cadg\mdl\configuration.cat wDEV_ADG
  • .workspace file for mapping workspaces to team
    members
  • DB wMNG wDEV wDEV_SA wDEV_MTR wDOC
  • DG wDEV wDEV_PM wDEV_UDA wDEV_SUP wDEV_SC
  • Chmod like tool for integrator to manage access
    rigths

8
Configuration Management- Baseline and branch
identification
  • DAC_5_0_A001NN2
  • Project Name (DAC)
  • Mayor release (5)
  • Minor release (0)
  • Promotion level (explained below) (A)
  • Baseline identifier (001)
  • For branches, initials of team member and branch
    number (NN2)
  • Promotion level
  • an attribute of the baseline
  • Indicates its quality or stability
  • A alpha (internal integration, instable working
    baseline)
  • B beta (distributed to selected outside users)
  • R release candidate (released after testing and
    decision of product team)

9
Change Management
  • Change Request submitted request for new
    features, enhancements, defect elimination,...
  • Submitted by customers (via support), developers,
    testers, managers,...
  • Several hundred change requests between two mayor
    releases
  • Need to formalize and systematically process each

10
Change M. - Assesment
CR Submitter
Project Manager
Product Team
Assigns id NNNN,
Sends RCLS mail -
opens topic
topic 50CRALL
36CRNNNN
Forms 1 and 2
Status Open
need
Assesment
more info
PT
Form 1-3
decides
Status PT to
Study CR
Sends request via
decide
topic 36CRNNNN
Submitter replies
deferred
forms 1 i 2
Status Open
rejected
accepted
rejected
Decision
deferred
Fills in form 3,
Fills in form 3,
status Dissaproved
status Deffered
Status Approved,
accepted
fills in form 3
Sends notice via
topic 36CRNNNN
Planning the
realization
11
Chg M. - Realization
CR Submitter
Project Manager
Implementer
Verifier
Updates plans
Inititates implementation
via 36CRNNNN/DEV
(form 4)
Status Assigned
Assesment, then
implementation
Completion report
(succeed fail) via
more activities needed
36CRNNNN/DEV
form 4
Status Assesment
Success
Status Completed
Failure
form 5 u
36CRNNNN/SQA
Sends report (Form 4)
Verification
via 36CRNNNN
Status Rejected
Completion report
(succed, fail) via
36CRNNNN/SQA
(form 2)
Status assesment
Verif. failed
Sends Report
Verification Passed
(form 4) via
36CRNNNN/
Send report (Form 4)
DEV
via 36CRNNNN
Status Verification
Status Closed
Failed
12
Chg M. Change Request States
13
Form 1 for CR Submitter
14
Form 2 for Verifier
15
Form 3 for Managers
16
Form 4 for Implementer