PCWS, PCWP, ACWP tracking (same as construction project) Inputs from ... Support for CPU intensive jobs. Shielding calculations. Trigger studies. PCAP Review ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 35
Provided by: DZE14
Category:

less

Transcript and Presenter's Notes

Title: U.S. ATLAS Physics and Computing Project Status


1
U.S. ATLAS Physics and Computing Project Status
  • John Huth
  • Harvard University

2
Outline
  • Project Management Plan
  • Organization
  • Scope
  • Facilities
  • Software
  • Milestones
  • Budget

3
U.S. ATLAS Organization
4
Projectization
  • Access/MS Project Database
  • Reporting/tracking function
  • Reporting Scheme
  • Formal reports quarterly
  • Written reports monthly
  • PCWS, PCWP, ACWP tracking (same as construction
    project)
  • Inputs from all Level 2 managers

5
PMP Overview
  • Description of ATLAS
  • CSG etc
  • Description of U.S. Organization
  • Job descriptions
  • Policies
  • Reporting and oversight
  • Working appendices
  • Budget
  • WBS
  • Deliverable list
  • Major Milestones

6
Functional Overview Cost/Schedule Control System
Baseline
Report Generator
ACCESS Database
  • WBS
  • WBS Dictionary
  • Estimate
  • - Labor
  • - Material
  • - Travel
  • Rates
  • Contingency
  • Cost Books
  • MOUs
  • Project/NSF/Base/
  • Infrastructure
  • Funding Source

Reports
1
2
3
Projections Procedure
Terminal
FY Funding by Institution
4
5
6
7
Update Procedure
MS Project 98 Baseline (Resource Loaded Schedules)
Schedules
8
9
Escalation Procedure
DOE
MS Project 98 Statused (Resource Loaded Schedules)
Escalation Rates
11
BCWS/BCWP
Status Data
S/S Mgr.
10
Status Sheets
CSSR at WBS Level 3 WBS Level 5
Cost Reporting (WBS Level 5)
12
13
14
Institutions
Monthly Cost Reports
Cumulative Cost
16
15
17
18
7
Cost Categories
  • Advanced Information Technology Professional
  • Information Technology Professional I
  • Information Technology Professional II
  • Information Technology Technician
  • Student
  • Travel
  • Stores
  • Space
  • Power
  • Low value materials
  • High value materials
  • Licenses
  • Maintenance
  • Consulting
  • Technical services
  • Administrative service

8
Change Control
9
Project Office
  • Information in ACCESS DB
  • Tracking functions automated
  • Use of project office for procurements
  • Major procurements
  • 10 Mock Data Challenge (03)
  • 40 Facilities ramp (end of 04)
  • 100 Facilities ramp (05)

10
Coordination with Intl. ATLAS
  • Common WBS, schedule
  • Working to same milestones
  • Trying to ramp up presence at CERN
  • Multiple Tutorials given on control/framework
  • Software Agreements in progress
    (control/framework is prototype agreement)

11
Contingency
  • Major issue
  • Funding profiles very tight
  • Uncertainties large for a fixed set of
    deliverables
  • Factors of 2 or more in some cases
  • Adopt this model
  • Build to cost drop requirements as needed to
    meet deliverables
  • Add 10 project reserve to help put deal with
    crises year by year allocation
  • Agreement with CMS

12
Major U.S. Project Components
  • Regional Center at Brookhaven
  • User support facility
  • Software
  • Core software
  • Control/framework
  • Data management
  • Detector Specific reconstruction
  • Support, training
  • Physics
  • Event generators, physics objects
  • Computational grids
  • Tier 2 facilities

13
Regional Center
  • Goals
  • Support U.S. Physicists in analysis
  • Support ATLAS Collaboration
  • Hub of U.S. ATLAS Grid
  • Status
  • Support hires
  • Center running, providing support
  • Planning for ATLAS, Grid activities
  • Acquisition of more Linux boxes
  • Support for CPU intensive jobs
  • Shielding calculations
  • Trigger studies

14
Muon Level 2 Trigger

Radius of curvature map for muons.
15
Neutron Background Studies
Total neutron flux
KHz/cm2

16
(No Transcript)
17
Software
  • U.S. Responsibilities
  • Control/framework
  • Data management
  • Major detector reconstruction
  • Liquid Argon Calorimeter
  • Tile Calorimeter
  • Muons
  • Status
  • Major milestones passed in creation of
    control/framework
  • 7 FTE software professionals working
  • Preparation for software agreements with ATLAS

18
Grid Computing
  • Petabyte scale virtual data grid
  • Hierarchy of centers (Tier 0 CERN, Tier 1 BNL,
    Tier 2 Universities)
  • Grid middleware linkages
  • Resource allocation and discovery
  • Security
  • Automation
  • Status
  • U.S. ATLAS testbed planning
  • Participation in GriPhyN, PPDG projects

19
U.S. ATLAS Testbed
Boston University
Esnet, Mren
UC Berkeley LBNL-NERSC
NPACI, Abilene
Argonne National Laboratory
Calren Esnet, Abilene, Nton
Brookhaven National Laboratory
Esnet
Abilene
Indiana University
HPSS sites
20
GriPhyN
21
Challenges in Project Planning
  • Projectizing
  • Accounting and tracking systems (DONE)
  • Revision to Project Management Plan (DONE)
  • Preparations for Lehman review (NOW)
  • Integration with International ATLAS
  • Need more support functions at CERN (In Progress)
  • LHC Computing review (in progress)
  • Concerns about CERN IT division
  • Coping with funding profiles (5M short integral)
  • Poor match particularly in software
  • Seeking relief in FY 02-04

22
Major Milestones
23
Milestones
24
(No Transcript)
25
(No Transcript)
26
Request
27
Software
28
Facility Profile
29
Guidance - Request
30
Profile Effects
  • Substantial delay in services at Regional Center
  • Mass Storage System support delayed until FY 04.
  • Impacts ability to perform 03 Mock data
    challenge
  • Software development cant work with this profile
  • Need flatter profile (FY 02-04)
  • Still, integral eliminates all detector specific
    tasks (mainly impacts universities)

31
Fallbacks
  • Overall scale back on requirements
  • Software
  • Degree of grid automation
  • Overall requirements
  • (e.g. carrying two vs. one DB product)
  • Shifting personnel
  • (e.g. CERN location of SW pros)
  • Hardware
  • Reduction of scope of RC
  • Delay of purchases Moores law
  • Alternative data-analysis strategies
  • Comment user part of facilities is conservative

32
Overall Budget
33
Budget Breakout
34
Summary
  • Functional Organization
  • Software effort backbone of Intl. ATLAS
  • International ATLAS starting to coalesce
  • Grid tasks beginning
  • Funding profile must be addressed
  • PMP (minus WBS, budget) available for comment
  • Steps to projectization
Write a Comment
User Comments (0)
About PowerShow.com