Title: Amendment of the COM Proposal on the list of priority substances including the identification of pri
1Internationale Tagung Wroclaw, 26 February 2003
Die Rolle der IKSOgV bei der Umsetzung der WRRL
2Outline
- Introduction to the Water Framework Directive
- EU Common Implementation Strategy
- International Commission for the protection of
the Odra against pollution - Role of the IKSOgV in the implementation of the
WFD
3Part 1
WFD and CIS
4Key elements
- protecting all waters, surface and ground waters
in a holistic way - good quality (good status) to be achieved by
2015 - integrated water management based on river basins
- combined approach of emission controls and water
quality standards, plus phasing out of
particularly hazardous substances - economic instruments economic analysis, and
getting the prices right - to promote prudent
use of water - getting citizens and stakeholders involved
public participation
5Concept
Measures under Water Framework Directive
Coordination of all other measures
urban waste water
nitrates
IPPC other industry discharges
chemicals pesticides biocides
landfills sewage sludge
- drinking water
- bathing water
6Implementation timetable
- 2003 - Transposition into national legislation
- 2003 - Identification of River Basin District
- 2004 - Analysis of pressures, impacts, use
- 2006 - Monitoring programmes operational
- 2006 - Start Consultation with public
- 2009 - River Basin Management Plan
- 2010 - Pricing policies
- 2012 - Programme of measures operational
- 2015 - Environmental objectives
7Odra
River basins in Europe
8Shared challenges
- Ambitious objectives and demanding timetable
- Risks of wrong application because of complexity
of the technical requirements - Large shared river basins (Danube, Rhine, Elbe,
Odra) - Capacity of administrations
- New implementation strategy required
9Activities
- Information exchange and raising awareness
(2002-ongoing) - Developing guidance documents (2002)
- Geographical information systems (2002/2003)
- Testing in pilot river basins (2003/2004)
- Manual for integrated river basin management
(2004/2005)
10State-of-play
- Progress after completion of Phase 1 - end 2002
- Finalisation of nine guidance documents and four
technical reports (gt1200 pages) - Setting up of pilot river basin network
currently 14 pilots in 17 countries - Establishment of extensive expert network
- Increasing awareness through numerous activities
11Guidance Documents
- Identification of water bodies
- Water and Economics (WG 2.6)
- Analysis of pressure and impacts (WG 2.1)
- Heavily modified and artificial water bodies (WG
2.2) - Coastal and Transitional Waters - Ecological
Assessment (WG 2.4) - Intercalibration - site selection and process (WG
2.5) - Monitoring (WG 2.7)
- Geographic Information Systems - GIS (WG 3.1)
- Public Participation (WG 2.9-WP 3)
12Technical Reports
- Report on statistical tools for the assessment of
groundwater (WG 2.8) - Identification of river basin districts (WG
2.9-WP 1) - Identification and Designation of HMWB (WG 2.2)
- Synthesis report on 33 Case Studies
- Tool Box
13Ongoing work
- In addition, three more guidance documents are
under preparation and will be finalised during
the first half of 2003 - Rivers and Lakes - Ecological Assessment (WG
2.3) - Planning Process (WG 2.9-WP 2)
- Wetlands (new drafting group)
14Pilot River Basins
- B, F, NL (Scheldt),
- D, F, Lux (Moselle-Sarre)
- France (Marne)
- Ireland (Shannon)
- Denmark (Odense)
- Finland (Oulujoki)
- Norway
- Portugal (Guadiana)
- Spain (Júcar)
- Greece (Pinios)
- Italy (Tevere, Cecina)
- HU/ROM (Somos)
- PL, CZ, D (Neisse)
15New organisation 2003/2004
Water Directors Steering of implementation
process Chair Presidency, Co-chair Commission
Expert Advisory Forum 1) Priority Substances 2)
Groundwater (mid-2003) Chair Commission
Art. 21 Committee
Strategic Co-ordination group Co-ordination of
work programme Chair Commission
Working Group 2.A Ecological Status Lead/Co-lea
d D, JRC, UK
Working Group 2.B Integrated River Basin
Management Lead/Co-lead F, SP (JRC)
Working Group 2.C Groundwater (after end of EAF
GW) Lead A (tbc)
Working Group 2.D Reporting Lead Commission
Stakeholders, NGOs, Researchers, Experts, etc.
16Part 2
IKSOgV and WFD
17Geschichte der IKSOgV (1)
11.04.1996 - Unterzeichnung des Vertrages über
die Internationale Kommission zum Schutz der Oder
gegen Verunreinigungen (IKSOgV) Gründung der
Vorläufigen Kommission zum Schutz der Oder gegen
Verunreinigungen Einrichtung des Sekretariats
und der drei Arbeitsgruppen 01.09.1997 - 1.
Außerordentliche Sitzung der Vorläufigen
Kommission nach dem Hochwasser im Juli 1997 und
Einrichtung der AG 4 Hochwasser 15.03.1999 - 3.
Tagung der Vorläufigen Kommission und Einrichtung
der AG 5 Ökologie 26.04.1999 - Inkrafttreten des
Vertrages über die IKSOgV
18Geschichte der IKSOgV (2)
02.12.1999 - 1. Tagung der Kommission und
Ministerkonferenz der Vertragsparteien 01.02.2000
- Umwandlung des Vorläufigen Sekretariats in das
reguläre Sekretariat der IKSOgV 05.03.2001 - 3.
Tagung der Kommission und Einrichtung der AG 6
Implementierung der EU-Wasserrahmenrichtlinie 08.0
5.2002 - Beauftragung der IKSOgV durch die
Vertragsparteien zur Übernahme der Koordination
bei der Umsetzung der EU-Wasserrahmenrichtlinie
im Odereinzugsgebiet 13.12.2002 - 5. Tagung der
IKSOgV, Beschluss über eine Strukturanpassung der
IKSOgV an neue Aufgaben, die mit der Koordination
der WRRL-Umsetzung verbunden sind
19Organisation der IKSOgV
Gültig ab 1.1.2003
20International River Basins
- Member States fully responsible for its portion
of the IRB, clear relation to (non-) MS - establishment of international co-operation
between countries mandatory, but form flexible - one river basin management plan for IRB
- safety net in case the int. co-operation fails
or is too slow - organisation of public participation in the IRB
21Rolle der IKSOgV
- Verantwortung für die Umsetzung liegt
ausschliesslich bei den Mitgliedsstaaten, aber
IKSOgV soll Aktivitäten zur Umsetzung der WRRL
koordinieren! Hauptaufgaben sind - Koordinierung und Abstimmung
- Harmonisierung über das gesamte Einzugsgebiet
- Koordinierung der Berichterstattung an die EU
- Kooperationsplatform
- Informationsaustausch
22Mandat der Gruppe A
- Erarbeitung und Umsetzung eines Arbeitsplanes
- Erarbeitung eines koordinierten Teiles des
Flussgebietsplanes und Bericht an EU - Koordinierung der Beitrage aus anderen Gruppen
- Querschnittsaufgaben (z.B. Öffentlichkeitsbeteili
gung)
23Erste Ergebnisse
- Rahmenarbeitsplan 2002-2004
- Abgrenzung der Bearbeitungsgebiete
- Mandate für Unterarbeitsgruppen
- Pilotflussgebiet Lausitzer Neisse
24Nächste Schritte
- Unterarbeitsgruppen arbeitsfähig machen
- Auswertung der Ergebnisse der EU Leitfäden und
Übertragung auf die Oder - Erstellung von ersten Karten
- Vorbereitung des ersten Berichtes für 2004
(Flussgebietseinheit)
25More information
On water policy http//www.europa.eu.int/comm/en
vironment/water WFD CIRCA Information Exchange
Platform http//forum.europa.eu.int/Members/irc/
env/wfd/home or for guidance documents
/library Email joachim.deugenio_at_cec.eu.int