Title: LAT ISOC Presentation


1
GLAST Large Area Telescope WBS 4.1.B Instrument
Science Operations Center Managers Face to Face
Meeting 17 March 2005 Rob Cameron rac_at_slac.stanf
ord.edu 650-926-2989
2
ISOC Coordination Activities
  • LAT Project
  • Planning transition from LAT development and
    delivery phase to operations phase
  • Operations Planning
  • Definition of Operations Steering Committee
  • Meetings of ISOC team leads
  • Coordination of Calibration and Analysis Methods
    Science Group with ISOC tasks
  • LAT Configuration Tracking and Control Database
  • Working with Systems Engineering, sub-systems to
    define and implement configuration DB
  • Working group being established
  • Plan keep existing methods in place provide
    glue where necessary

3
Ops Constraints On LAT Diagnostic TLM
  • Summary of results from meeting between ISOC,
    FSW, Erik Andrews on use of LAT Diagnostic TLM
  • TCS
  • Cannot keep TCS diagnostic on, as Alert-initiated
    TDRSS MA link would never close
  • EPU Boot
  • Continuous EPU boot diagnostic data stream _at_3.2
    kbps is a concern
  • concern is overflow of S/C FIFO telemetry buffer,
    which is emptied at 1kbps on TDRSS MA
  • move EPU boot tlm to HSK APID
  • MEM
  • use only during RT comm for monitoring?
  • not a concern for pool space diagnostic small
    dataset
  • LFS
  • File System Status monitor at least daily,
    during RT contact (but only a small response)
  • Directory or Root Listing used infrequently,
    only during RT contact?
  • File Dump use only during RT contact, and/or use
    via science stream
  • MSG, LIM
  • TBD impact
  • ISOC should plan to dump and clear MSG log at
    least daily, during RT contact
  • ITC, command response

4
Non-ITAR ITOS?
  • Met with Greg Greer on possibility of non-ITAR
    ITOS. Two solutions proposed
  • Create a package that would be limited to
    receiving and processing telemetry, creating a
    monitor only system.
  • Remove all commanding-related components from
    ITOS, and potentially modify the STOL engine to
    eliminate commanding-related directives. This
    option must be usable for operational real-time
    monitoring of the LAT, and hence receiving
    real-time telemetry (LAT spacecraft) from the
    GLAST MOC. It would not be usable for
    command-sequence generation and PROC testing with
    the LAT Testbed.
  • Create a package capable of formulating and
    transmitting CCSDS commands, but only at the
    CCSDS packet level.
  • Remove all ITOS components and functions related
    to transfer-frame encapsulation of command
    packets, as well as any other functionality
    associated with the CCSDS COP-1 commanding
    protocol. Would be suitable for command-sequence
    / PROC validation, provided that the command
    packets produced by this restricted package are
    identical to those generated by the complete ITOS
    system at the MOC. The planned VSC interface
    between ITOS and the LAT or LAT simulation
    operates with CCSDS packets, so this option must
    be and should be suitable for LAT
    command-sequence and PROC development, test and
    validation at SLAC.
  • Next step work with GLAST Project at NASA to see
    if either option can be made non-ITAR restricted

5
Interface Testing with GSSC
  • ISOC will support first formal interface test
    with GSSC on 18 March. Test of data transfers of
    sample mission planning products between GSSC and
    ISOC using FastCopy. Specific steps involving
    ISOC are
  • ISOC sends GSSC a dummy memory load packaged per
    the Operations Data Products ICD
  • ISOC sends GSSC a dummy PROC request packaged per
    the ICD
  • GSSC sends ISOC a preliminary timeline file
    packaged per the ICD
  • GSSC and ISOC will examine delivered files to
    confirm that they are what was expected. A
    conference call has been set up to allow
    participants to coordinate during the test.
  • A retest is scheduled for 5 April if any problems
    occur.
  • The full description of test is available at
    http//glast.gsfc.nasa.gov/ssc/dev/gssc_testing/pl
    ans/GST2-ST5-plan.txt.

6
Issues and Concerns
  • Project milestones
  • MOR is now very early relative to launch, Jan
    2006, and should be delayed
  • ISOC staffing
  • ISOC software development under threat because of
    delayed availability of developers
  • VSC availability for ISOC testing