Construction Conference Los Alamos National Laboratory Mike Clemmons PE Project Engineering Group Le - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Construction Conference Los Alamos National Laboratory Mike Clemmons PE Project Engineering Group Le

Description:

Construction Conference Los Alamos National Laboratory Mike Clemmons PE Project Engineering Group Le – PowerPoint PPT presentation

Number of Views:205
Avg rating:3.0/5.0
Slides: 18
Provided by: IM11
Category:

less

Transcript and Presenter's Notes

Title: Construction Conference Los Alamos National Laboratory Mike Clemmons PE Project Engineering Group Le


1
Construction ConferenceLos Alamos National
Laboratory Mike Clemmons PEProject Engineering
Group Leader
  • April 13th, 2009

2
PRESENTER
  • Mike Clemmons P.E. QCxP
  • PROJECT ENGINEERING GROUP LEADER
  • DESIGN ENGINEERING MANAGEMENT AND PROJECT
    ENGINEERING
  • CONTACT INFO
  • MCLEMMONS_at_LANL.GOV OR 505-667-8102

Slide 1
3
PURPOSE
  • TO PRESENT AN OVERVIEW OF THE ENGINEERING PROCESS
    AT LANL
  • DESCRIBE THE CONTROLLING DOCUMENTS USED FOR
    ENGINEERING EXECUTION AT LANL
  • ADDRESS ISSUES WHICH MIGHT IMPROVE THE OVERALL
    UNDERSTANDING OF LANL ENGINEERING REQUESTS FOR
    SERVICES

Slide 2
4
AGENDA
  • Engineering at LANL
  • How is Engineering at LANL Accomplished
  • LANL Engineering Standards
  • LANL Engineering Processes
  • Engineering Deliverables
  • Engineering Execution
  • How to work for LANL
  • LANL Contracts and Documents
  • Open Discussion

5
ENGINEERING AT LANL
  • LANL ENGNEERING ACTIVITIES
  • DESIGNS FOR CONSTRUCTION, OPERATIONS AND
    MAINTENANCE
  • MAIN TYPES
  • FACILITIES
  • PROGRAMMATIC
  • ENVIRONMENTAL
  • NUCLEAR
  • NON-NUCLEAR
  • HOW IT GETS DONE
  • LANL DIRECT ENGINEERING STAFF
  • CONTRACT ENGINEERING SUPPORT (TASK ORDERS)
  • ARCHITECTURAL AND ENGINEERING COMPANIES

6
HOW IS ENGINEERING ACCOMPLISHED AT LANL?
  • LANL ENGINEERING IS EXECUTED BASED ON SPECIFIC
    REGULAORY REQUIREMENTS, PROCESSES AND PROCEDURES
  • DOE REGULATORY REQUIREMENTS
  • INDUSTRY CONSENSUS STANDARDS, CODES AND
    REGULATIONS (IBC,NEC,NFPA)
  • STATE OF NEW MEXICO CODES AND REGULATIONS
  • LANL CONDUCT OF ENGINEERING PROCESSES AND
    PROCEDURES
  • LANL ENGINEERING STANDARDS MANUAL
  • LANL DESIGN DRAFTING MANUAL
  • LANL STANDARD SPECIFICATIONS

7
LANL ENGINEERING STANDARDS-ESM
  • ENGINEERING STANDARDS MANUAL (ESM)

PROVIDES LANL SPECIFIC REQUIREMENTS AND
GUIDELINES FOR ALL ENGINEERING DISCIPLINES
ARCHITECUTURAL CIVIL STRUCTURAL MECHANICAL ELECTRI
CAL INSTRUMENTATION AND AUTOMATION ENVIRONMENTAL
WELDING SUSTAINABILITY FIRE PROTECTION NUCLEAR HAZ
ARDOUS PROCESSES COMMISSIONING
IDENTIFIES SPECIFIC INDUSTRY CONSENSUS STANDARDS
WHICH APPLY TO THE DISCIPLINES
8
LANL ENGINEERING STANDARDS-EDM
  • ENGINEERING DRAFTING MANUAL (EDM)
  • PROVIDES LANL SPECIFIC REQUIREMENTS AND
    GUIDELINES FOR THE DEVELOPMENT AND PRODUCTION OF
    ENGINEERNG DRAWINGS
  • DRAWING SIZES
  • TYPICAL CONTENT
  • FORMATS
  • LAYOUTS
  • LINE WEIGHTS
  • FONT SIZE AND TYPES
  • LAYERING CONVENTIONS
  • STANDARD DISCIPLINE SYMBOLS
  • REVIEW AND CHECKING PROCEDURES
  • USE OF THE EDM PROVIDES CONSISTENCY IN THE
    ENGINEERING DRAWING PACKAGES AND MINIMIZES REWORK

Slide 7
9
LANL ENGINEERING STANDARDS- SPECS.
  • ENGINEERING STANDARD SPECIFICATIONS
  • PROVIDES LANL SPECIFIC REQUIREMENTS AND
    GUIDELINES FOR THE PROCUREMENT AND INSTALLATION
    OF ENGINEERNG DESIGNS
  • SPECIFICATION ARE BASED ON INDUSTRY STANDARD
    SPECIFICATIONS
  • UTILIZE THE CSI SPECIFICATION FORMAT AND
    NUMBERING SYSTEMS
  • SPECIFICATIONS HAVE BEEN MODIFIED TO INCORPORATE
    LANL ESM REQUIREMENTS
  • THE SPECIFICATIONS REQUIRE MODIFICATION TO MEET
    THE PROJECT SPECIFIC REQUIREMENTS.
  • THEY ARE AVAILABLE ON-LINE FOR USE BY LANL
    APPROVED CONTRACTORS
  • PROVIDES CONSISTENCY IN MEETING LANLS
    REQUIREMENTS FOR DESIGN AND CONSTRUCTION PROJECTS

Slide 8
10
LANL ENGINEERING PROCESSES- CoE
  • LANL CONDUCT OF ENGINEERING
  • PROVIDES DOCUMENTED SYSTEMATIC PROCESSES AND
    PROCEDURES FOR THE EXECUTION OF LANL ENGINEERING
    ACTIVITIES
  • PROCESSES TO DEFINE PROJECT AND ENGINEERING
    REQUIREMENTS
  • PROCEDURES FOR EXECUTING DESIGN ACTIVITIES
  • DESIGNS WILL BE DEVELOPED, DOCUMENTED MODIFIED,
    REVIEWED AND APPROVED FOR USE
  • LANL BUILDING OFFICIAL
  • CONDUCT OF ENGINEERING PROCEDURES MAY APPLY TO
    ENGINEERING CONTRACTOR

Slide 9
11
ENGINEERING DELIVERABLES
  • TYPICAL ENGINEERNG DELIVERABLES
  • ENGINEERING CALCULATONS
  • DRAWINGS
  • ARCHITECTURAL
  • CIVIL/STRUCTURAL
  • MECHANICAL
  • ELECTRICAL
  • PROCESS/PIPING/FIRE PROTECTION/SECURITY/IC
  • PROCUREMENT SPECIFICATIONS
  • CONSTRUCTION SPECIFICATIONS
  • TEST AND ACCEPTANCE PLANS
  • CONSTRUCTION SCHEDULES

12
ENGINEERING EXECUTION
  • DOE DEFINES PROJECTS IN FOUR PHASES
  • TITLE I CONCEPTUAL AND PRELIMINARY DESIGN WHEN
    ENGINEERING CONCEPTS ARE ESTABLISHED AND
    DOCUMENTED (DRAWINGS,SPECS CALCS)
  • TITLE II - DETAILED DESIGN PHASE OF A PROJECT.
    ENGINEERING IS COMPLETED, VERIFIED, REVIEWED AND
    APPROVED FOR ISSUE TO CONSTRUCTION
  • TITLE III - CONSTRUCTION PHASE OF THE PROJECT
    WHERE EQUIPMENT IS ORDERED, INSTALLED AND TESTED
    ACCORDING TO THE FINAL DESIGN
  • TITLE IV IS HANDOVER TO THE OWNERS AND CLOSE
    OUT OF THE PROJECT FINAL DOCUMENTATION

13
HOW TO DO ENGINEERING WORK FOR LANL
  • LANL WORKS WITH QUALIFIED ENGINEERING FIRMS,
    VENDORS AND SUPPLIERS.
  • THE LANL BUSINESS GROUP WILL BE ABLE TO ASSIST IN
    PROVIDING THE PROPER DOCUMENTATION TO GET ON THE
    QUALIFIED VENDORS LIST

14
LANL CONTRACTS AND DOCUMENTS
  • PROCUREMENT PACKAGES CAN BE VERY INTIMIDATING
  • LARGE VOLUME OF DOCUMENTS
  • VERY DETAILED AND SPECIFIC
  • REFER TO MANY DOE AND NATIONAL STANDARDS
  • LOTS OF BOILER PLATE
  • KEY ENGINEERING DOCUMENT IS EXHIBIT D IT
    DEFINES THE SCOPE OF THE JOB THAT ENGINEERNG
    SERVICES ARE BEING REQUESTED
  • PAY ATTENTION TO - SUBMITTAL REQUIREMENTS,
    DOCUMENT REVIEW REQUIREMENTS AND CONFORMNACE TO
    SAFETY AND SECURITY REQUIREMENTS

15
AGENDA - What we Covered
  • Engineering at LANL
  • How is Engineering at LANL Accomplished
  • LANL Engineering Standards
  • LANL Engineering Processes
  • Engineering Deliverables
  • Engineering Execution
  • How to work for LANL
  • LANL Contracts and Documents
  • Open Discussion

Slide 14
16
OPEN DISCUSSION QUESTIONS?
  • OPEN FOR QUESTIONS?
  • ARE ENGINEERING REQUIREMENTS UNDERSTOOD IN
    PROPOSALS?
  • ARE CODES AND STANDARDS FULLY UNDERSTOOD DURING
    BID PROCESS?
  • DO TECHNOLOGY ISSUES PREVENT RESPONDING TO
    PROPOSALS?
  • WHAT WOULD INCREASE YOUR RESPONSE TO ENGINEERING
    SERVICES REQUESTS?

17
CONCLUSION
  • IF FURTHER QUESTIONS
  • CONTACT
  • MIKE CLEMMONS P.E. QCxP
  • MCLEMMONS_at_LANL.GOV, 505-667-8102