WG3 Presentation to SC4 Closing Plenary
  • Gerald Radack, Convener
  • Vico Equense, Italy
  • 2006-03-10
  • Revision 1 2006-03-10

2
Plenaries in Toulouse
  • Monday 1030-1200
  • Thursday 1530-1700

3
WG3 Teams
  • T01 Shape Representation
  • Goult, Ray J LEADER
  • T04 Materials
  • Moreno, Anna LEADER
  • Swindells, Norman DEPUTY
  • T08 Product Life Cycle
  • King, Timothy LEADER
  • URen, Jim DEPUTY
  • T09 Engineering Analysis
  • Hunten, Keith LEADER
  • T10 Electrical/Electronics
  • Klein, Lothar LEADER
  • Thurman, Thomas R DEPUTY
  • T19 Mechanical Products
  • Ungerer, Max LEADER
  • T22 Building and Construction
  • Haas, Wolfgang LEADER
  • Terai, Tatsuo DEPUTY
  • Kim, Inhan DEPUTY
  • T23 Ships
  • Barter, Mike LEADER
  • Mays, James L LEADER
  • T24 Manufacturing
  • Hardwick, Martin LEADER
  • Sakamoto, Chiaki DEPUTY
  • T25 Oil, Gas, Process and Power
  • Sandsmark, Nils LEADER
  • van Exel, Paul DEPUTY

4
T01 Shape Representation
  • Accomplishments in Vico Equense
  • Joint meeting with T25 and Parametrics
  • 15926-3
  • Reviewed and approved ballot comment responses
  • Reviewed new draft document
  • Developed plan for TS publication
  • 10303-59 PDQ Shape
  • Reviewed new draft
  • Plan for CD 2006-07

5
T01 Shape Representation
  • Plans for Toulouse
  • 15926-3 final internal review

6
T04 Materials
  • Accomplishments in Vico Equense
  • 10303-235 Materials information
  • Reviewed ballot comments and agreed responses
  • Agreed completion strategy for the DIS (2006-09)
  • 10303-45
  • Presented NWI to Change Management
  • Discussed maths value requirements with WG12
  • Materials modules
  • Agreed module for composition
  • Reviewed proposals for material property modules

7
T04 Materials
  • Plans between now and next meeting
  • 10303-235 Materials information
  • Progress DIS document
  • 10303-45
  • Produce CD document
  • Reference dictionary (Mil-Hdbk 5H)
  • Expand current prototype to more test methods and
    properties

8
T04 Materials
  • Plans for Toulouse
  • Progress the development of 10303-235 DIS
  • Progress the development of reference dictionary
  • Review materials modules

9
T08 Product Life Cycle
  • Progress in Vico Equense
  • AP 233
  • Confirmed ISO delivery dates
  • Reviewed progress towards WD2 2006-04-06
  • Reviewed Function based behaviour progress
  • Reviewed State based behaviour progress
  • Reviewed approved general model parameter
    module
  • Identified need for general scripting capability
    for Behaviour modules
  • Received status report from PLCS on improvements
    DEXlib

10
T08 Product Life Cycle
  • Progress in Vico Equense
  • AP 233
  • Attended joint WG3/WG12 Meeting
  • Agreed to reference data documentation approach
  • Reviewed Engineering Analysis Concept Model and
    proposed updates for analysis modules
  • Reviewed AP233 AAM to implementation modules
    analysis
  • Agreed on approach for completing type extends
    for WD2
  • Identified need for Decision support module
    containing Trade study and VV modules (will also
    include analysis modules)
  • Reviewed Observation module as basis for Issue
    module

11
T08 Product Life Cycle
  • Plans for Toulouse
  • Resolve WD3 comments
  • Issue CD
  • Provide Overview to SC4
  • Plans for Joint INCOSE/T8 Orlando meeting
  • Initiate industry review of CD document

12
T09 Engineering Analysis
  • Attended EXPRESS Binary Data Project
  • Developed fundamental concepts and assumptions
    for Part 53
  • Checked out the new STEPMod version
  • Updated the AP 209 e2 planning diagram
  • Met jointly with AP 233
  • Finalized the Analysis modules shared between AP
    233 and AP 209 e2
  • AP 210 e2 has also expressed interest
  • Reviewed and completed the Parameter module
  • Developed a constrained parameter relationship

13
T10 Electrical/Electronics
  • Accomplishments in Vico Equense
  • Resolved issues with modules for AP 210

14
T10 Electrical/Electronics
  • Plans between now and Toulouse
  • Begin AP 210 DIS ballot

15
T25 Oil, Gas, Process and Power
  • Accomplishments in Vico Equense
  • Participated in the ad-hoc work group on MA for
    reference data
  • Reviewed study on ISO 15926-7, Gellish Tables,
    AEX methodology, XMpLant, and NE 100
  • Resolved ballot comments issues for ISO 10303-221
  • Resolved CD/TS ballot comments issues for
  • ISO 15926-3 Ontology for geometry and topology
    (Joint with T1 and WG12)
  • ISO 15926-4 Initial reference data
  • Reviewed WD of ISO 15926-6 Scope and methodology
    for developing additional reference data
  • Reviewed and planned progress on
  • ISO15926-7 CD/TS
  • NWI ISO PAS Gellish Table
  • PWI for Process Monitoring Data
  • OWL representation of ISO 15926

16
T25 Oil, Gas, Process and Power
  • Plans between now and Toulouse (1)
  • Prepare AP 221 for IS publication
  • Prepare 15926-3 TS with ballot comment
    resolutions included
  • Resolve remaining ballot issues for ISO 15926-4
  • Prepare 15926-6 NWI-CD-TS for convener review
  • Resolve ballot comments on 15926-7 CD-TS,
    including a ballot comments resolution workshop

17
T25 Oil, Gas, Process and Power
  • Plans between now and Toulouse (2)
  • Complete first phase of study on 15926-7, Gellish
    Tables, AEX methodology, XMpLant, and NE 100
  • Develop worked example for 15926-4 for ad-hoc
    work group on MA
  • Prepare NW for CM review
  • Gellish Table
  • Process Monitoring Data
  • OWL representation of ISO 15926-2

18
T25 Oil, Gas, Process and Power
  • Plan for Toulouse
  • Draft annex for 15926-4 to ad hoc group on MA
  • Review study on ISO 15926-7, Gellish Tables, AEX
    methodology, XMpLant, and NE 100
  • Finalise TS for convener review
  • Part 3 (Joint with T1 and WG12)
  • Part 4
  • Resolve ballot issues for 15926-7 TS
  • Review progress and plan further work on
  • 15926-6
  • Gellish Table
  • Process Monitoring Data
  • OWL representation of 15926
Write a Comment