Safety Alert
No. 03 Jan 99

Committed to Safety
Crane Lifting Hazards
Background A serious near miss incident happened
recently at the front entrance of the Saih Al
Maleh building (new MAF office). A mobile crane
was observed lifting two sections of the board
room table from the balcony on the 3rd floor
without the necessary barriers and warning signs
in place. It was also reported that people were
entering and leaving the building unhindered
whilst the table sections were being prepared for
lifting on the edge of the balcony. No one
stopped the hazardous work.
  • Causes of the incident
  • The Job Safety Plan covered the hazards related
    to the lifting operation itself, however, the
    Contractor failed to identify and put in place
    all the necessary controls (physical
    barriers, warning signs) for the surrounding
    environment prior to and during the lifting
    operation.
  • Actions to Prevent Recurrence
  • In order to prevent recurrence of the above type
    of incident, the following actions shall be
  • undertaken for each lifting operation
  • Job Safety Plan to include the hazards and
    associated controls related to handling
    activities, as per Worksite Hazard
    Information Management System (WHIMS).
  • Relevant toolbox talks shall be held by each
    work team at individual work sites before
    commencement of the days activities. These shall
    concentrate on the risks of the work to be
    undertaken including the precautions necessary to
    contain the possible hazards specifically
    towards others not involved in the operation.
  • Empowerment to stop unsafe work has to be
    explained, developed and tested among PDO and
    Contractors labor force to ensure each employee
    is committed to STOP UNSAFE WORK.
  • __________________
Write a Comment
User Comments (0)
About PowerShow.com