Mike Hachey Director, Power Marketing TransCanada Power Marketing Ltd. Interrelationship Between Gas and Electricity Markets in New England - PowerPoint PPT Presentation

About This Presentation
Title:

Mike Hachey Director, Power Marketing TransCanada Power Marketing Ltd. Interrelationship Between Gas and Electricity Markets in New England

Description:

Title: Generic title Author: Jennifer_Varey Description: v.9Beta Last modified by: Peter Wortsman Created Date: 7/29/2003 3:46:20 PM Document presentation format – PowerPoint PPT presentation

Number of Views:60
Avg rating:3.0/5.0
Slides: 10
Provided by: Jennife1159
Category:

less

Transcript and Presenter's Notes

Title: Mike Hachey Director, Power Marketing TransCanada Power Marketing Ltd. Interrelationship Between Gas and Electricity Markets in New England


1
Mike HacheyDirector, Power MarketingTransCanada
Power Marketing Ltd.Interrelationship Between
Gas and Electricity Markets inNew England A
Generators PerspectiveRestructuring
RoundtableMay 21, 2004
2
Power Generation Assets
TransCanada Power, L.P.7 plants 328 MW
TransCanada 20 plants 4,700 MW (including LP and
plants in development)
3
Natural Gas Transmission Assets
Alberta System
Trans Québec Maritimes
Canadian Mainline
Foothills
BC System
Portland
Great Lakes
Iroquois
Northern Border
Tuscarora
24,000 miles of wholly owned pipeline 12 Bcf/day
4
Issues List
  • Available Information
  • Pipeline Nomination Schedule vs. NEPOOL Market
    Schedule
  • (Straw proposal 1)
  • Intraday Market
  • (Straw proposal 2)
  • Fuel Switching and Regional Energy Policy

5
Available Information
  • Numerous Gas Fired Generators Not Scheduled in
    DAM
  • ISO Morning Reports of 1/14-1/16 Showed Surplus,
    No OP4
  • OP4 on 1/14 Posted 5PM, 2 HR Duration, 108 MW
    Relief
  • Gas Market Signals Strong Tenn Z6 Mid 19/50/20
    /MMBTU
  • Now we know
  • DAM understated due to bid load, virtual
    generation
  • Severe electric scheduling uncertainty at ISO

6
Pipe Nominations vs. NEPOOL Mkt Schedule
  • Today, gas pipeline nominations due 1230,
    electric DAM schedule issued 1600, physical
    dispatch schedule issued
  • 2200
  • Straw Proposal 1
  • Extreme days only
  • Provide firm electric schedule before pipeline
    nominations are due

7
Intraday Market
  • On extremely cold days, intraday gas difficult to
    impossible to find
  • Straw Proposal 2
  • On extreme days, ISO to assume gas-fired units
    not scheduled by 1200 unavailable unless told
    otherwise
  • Levitan, Jan 02 ISO-NE should not rely upon
    gas-fired merchant power plants to provide
    operating reserves during OFOs

8
Fuel Switching and Regional Energy Policy
  • Substantial amount of gas-fired capacity in
    NEPOOL cannot switch to light oil unless no gas
    available
  • Expensive to maintain oil burn capability for
    once in a blue moon
  • Limited oil burn during extreme cold relieves
    price pressure on gas and electric markets,
    improves reliability
  • 90s vintage plants burning low S 2 cleaner
    than 60s and 70s vintage plants burning 6 oil

9
  • Thank you!