AFPC Policy - PowerPoint PPT Presentation

About This Presentation
Title:

AFPC Policy

Description:

AFPC Policy Protect its personnel, contractors,3rd parties and the environment against the hazards of exposure to ionizing radiation due to AFPC activities. – PowerPoint PPT presentation

Number of Views:50
Avg rating:3.0/5.0
Slides: 22
Provided by: Sale64
Category:

less

Transcript and Presenter's Notes

Title: AFPC Policy


1
AFPC Policy
  • Protect its personnel, contractors,3rd parties
    and the environment against the hazards of
    exposure to ionizing radiation due to AFPC
    activities.
  • Avoid uncontrolled releases of radioactive
    contaminated substances and to minimize the
    effects of past deposits
  • apply the principles of ICRP 60 for radiation
    protection ( justification of a practice,
    optimization of protection and dose risk
    limitation)
  • avoid the need for classified radiological
    workers wherever reasonably practicable

2
Clean up of NORM contaminated areas
  • Radiological surveys have identified AFPC areas
    which have become contaminated with NORM.
  • AFPC procedure is applicable to all AFPC
    activities to decontaminate NORM affected areas.
  • define standards and ensure availability of
    resources for decontamination.

3
Clean up of NORM contamination areas
  • Typical clean up activities shall be controlled
    by a defined work methodology
  • A detailed execution plan
  • Proposed clean up criteria
  • Special measures

4
NORM in Oil and Gas Industry
  • Releases of radioactivity with produced water
  • Radioactive surface contamination on production
    equipment
  • Radioactive sludges
  • Radioactive scales
  • Radioactive surface contamination on disused
    equipment

5
(No Transcript)
6
NORM Remediation Programme
  • All NORM contaminated areas have been extensively
    investigated by SAEC.
  • As the Syrian regulatory body, SAEC stated the
    preferred options for the permanent management of
    NORM contaminated waste
  • The final option has been supported by the
    external consultants AEA technology.

7
Main Concept
  • to have all NORM Remediation projects integrated
    into a larger Programme of environmental
    remediation.
  • The AFPC Programme is designed to meet regulatory
    requirements and International Standards to
    acceptable levels at reasonable cost.

8
Syrian Clean-up and Disposal Criteria for NORM
contaminated soils
  • At 0.15 Bq/g of Ra226 or less no treatment
    required.
  • More than 5.2 Bq/g of Ra226 must be treated as
    radioactive waste.
  • Between 0.15Bq/g and 5.2 Bq/g of Ra226 need a
    special treatment on site to reduce exposure to a
    value 0.1 mSv/y.

9
The final option
  • following recommendations by SAEC and
  • AEA Technology, AFPC preferred route for
  • three NORM contaminated areas is
  • engineered disposal mounds, while disposal
  • the fourth is by stabilization in a landfill.

10
Requirements for engineered mound disposal
facilities
  • Provide isolation of the waste from the
    surrounding environment
  • Inhibit surface water infiltration into the waste
  • Inhibit erosion of the cover over the waste
  • Maintain a separation between the waste and the
    ground water
  • Promote the drainage of water that infiltrates
    the wast out of the waste

11
Requirements for engineered mound disposal
facilities
  • inhibit human and animal intrusion through the
    cover into the waste
  • Maintain stability under foreseen subsurface and
    geologic condition
  • the site for a dedicated facility should above
    flood - plain levels

12
(No Transcript)
13
(No Transcript)
14
Requirements for engineered mound disposal
facilities
  • The facility should be able to cope with major
    events(flood,earthquake,and fire) on a time-scale
    of gt 200 years.
  • Performance requirements during construction use
    of reasonably available materials and machinery
  • Optimization of waste movement and keeping
    radiation dose to workers ALARA

15
Engineered Disposal Pits
  • All contaminated materials excavated and removed
    to disposal pit
  • Co-disposal of sludge encapsulation
  • Lined pits

16
Thayyem channel / sludge materials removed to
disposal pit
17
(No Transcript)
18
El-Ward lagoon materials removed to disposal pit
NW of plant
19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com