Status of the LHC Computing Project

Description:

Title: D-Grid Day 031001 Subject: DESY partners Author: Matthias Kasemann Last modified by: Matthias Kasemann Document presentation format: Bildschirmpr sentation – PowerPoint PPT presentation

Number of Views:2
Avg rating:3.0/5.0
Date added: 8 January 2020
Slides: 57
Provided by: Matthi61
Learn more at: http://www.desy.de
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: Status of the LHC Computing Project


1
Status of the LHC Computing Project
  • DESY
  • 26.1.2004
  • Matthias Kasemann / DESY

Seminar Datenverarbeitung in der
Hochenergiephysik
2
Outline
  • Introduction
  • LCG Overview
  • Reosurces
  • The CERN LCG computing fabric
  • Grid RD and deployment
  • Deploying the LHC computing environment
  • New projects EGEE
  • The LCG Applications
  • Status of sub-projects
  • And Germany

3
The Large Hadron Collider Project 4 detectors
CMS
ATLAS
Requirements for world-wide data
analysis Storage Raw recording rate 0.1 1
GBytes/sec Accumulating at 5-8
PetaBytes/year 10 PetaBytes of
disk Processing 100,000 of todays fastest
PCs
LHCb
4
LHC Computing Hierarchy
Emerging Vision A Richly Structured, Global
Dynamic System
5
LCG - Goals
  • The goal of the LCG project is to prototype and
    deploy the computing environment for the LHC
    experiments
  • Two phases
  • Phase 1 2002 2005
  • Build a service prototype, based on existing grid
    middleware
  • Gain experience in running a production grid
    service
  • Produce the TDR for the final system
  • Phase 2 2006 2008
  • Build and commission the initial LHC computing
    environment
  • LCG is not a development project it relies on
    other grid projects for grid middleware
    development and support

6
LHC Computing Grid Project
  • The LCG Project is a collaboration of
  • The LHC experiments
  • The Regional Computing Centres
  • Physics institutes
  • .. working together to prepare and deploy the
    computing environment that will be used by the
    experiments to analyse the LHC data
  • This includes support for applications
  • provision of common tools, frameworks,
    environment, data persistency
  • .. and the development and operation of a
    computing service
  • exploiting the resources available to LHC
    experiments in computing centres, physics
    institutes and universities around the world
  • presenting this as a reliable, coherent
    environment for the experiments
  • the goal is to enable the physicist to
    concentrate on science, unaware of the details
    and complexity of the environment they are
    exploiting

7
Requirements setting RTAG status
  • RTAG1     Persistency Framework
    completed RTAG2     Managing LCG Software
    completed RTAG3     Math Library Review
    completed RTAG4     GRID Use Cases
    completed RTAG5     Mass Storage completed
    RTAG6     Regional Centres completed
    RTAG7     Detector geometry materials
    description completed RTAG8     LCG
    blueprint completed RTAG9     Monte Carlo
    Generators completed RTAG10   Detector
    Simulation completed RTAG11  Architectural
    Roadmap towards Distributed
    Analysis completed
  • Reports of the Grid Applications Group
  • HEPCAL I (LCG-SC2-20-2002) Common Use Cases for a
    Common Application Layer
  • HEPCAL II (LCG-SC2-2003-032) Common Use Cases
    for a Common Application Layer for Analysis

8
Human Resources used to October 2003 CERN
apps. at other institutes
9
Includes resources at CERN and at Other Institutes
10
Includes all staff for LHC services at CERN Does
NOT include EDG middleware
11
  • Personnel resources
  • Includes
  • all staff for LHC services at CERN (inc.
    networking)
  • Staff at other institutes in applications area

without Regional Centres, EDG middleware
12
Phase 12 Human Resources at CERN
13
Today 1000 Si2k/box In 2007 8000 Si2k/box
14
Storage (II)
  • CASTOR
  • CERN development of a Hierarchical Storage
    Management system (HSM) for LHC
  • Two teams are working in this area
    Developer (3.8 FTE) and Support (3 FTE)
  • Support to other institutes currently
    under negotiation (LCG, HEPCCC)
  • Usage 1.7 PB of data with 13 million
    files,
  • 250 TB disk layer and
    10 PB tape storage
  • Central Data Recording
    and data processing
  • NA48 0.5 PB COMPASS
    0.6 PB LHC Exp. 0.4 PB
  • Current CASTOR implementation needs
    improvements ? New CASTOR stager
  • A pluggable framework for intelligent and
    policy controlled file access scheduling
  • Evolvable storage resource sharing facility
    framework rather than a total solution
  • detailed workplan and architecture available,
    presented to the user community in summer
  • Carefully watching the tape technology
    developments (not really commodity)
  • in depth knowledge and understanding is
    key

15
Storage (II)
  • CASTOR
  • CERN development of a Hierarchical Storage
    Management system (HSM) for LHC
  • Two teams are working in this area
    Developer (3.8 FTE) and Support (3 FTE)
  • Support to other institutes currently
    under negotiation (LCG, HEPCCC)
  • Usage 1.7 PB of data with 13 million
    files,
  • 250 TB disk layer and
    10 PB tape storage
  • Central Data Recording
    and data processing
  • NA48 0.5 PB COMPASS
    0.6 PB LHC Exp. 0.4 PB
  • Current CASTOR implementation needs
    improvements ? New CASTOR stager
  • A pluggable framework for intelligent and
    policy controlled file access scheduling
  • Evolvable storage resource sharing facility
    framework rather than a total solution
  • detailed workplan and architecture available,
    presented to the user community in summer
  • Carefully watching the tape technology
    developments (not really commodity)
  • in depth knowledge and understanding is
    key

16
Network
  • Network infrastructure based on ethernet
    technology
  • Need for 2008 a completely new (performance)
    backbone in the
  • centre based on 10 Gbit technology.
    Today very few vendors
  • offer this multiport, non-blocking, 10
    Gbit router.
  • We have an Enterasys product already under
    test (openlab, prototype)
  • Timescale is tight
  • Q1 2004 market survey
  • Q2 2004 install 2-3 different boxes, start
    thorough testing
  • ?
  • prepare new purchasing
    procedures, finance committee
  • vendor selection, large order
  • ?
  • Q3 2005 installlation of 25 of new backbone
  • Q3 2006 upgrade to 50
  • Q3 2007 100 new backbone

17
Wide Area Network
  • Currently 4 lines 21 Mbit/s, 622 Mbits/s ,
    2.5 Gbits/s (GEANT),
  • dedicated 10 Gbit/s line (starlight
    chicago, DATATAG),
  • next year full 10 Gbit/s production line
  • Needed for import and export of data, Data
    Challenges,
  • todays data rate is 10 15 MB/s
  • Tests of mass storage coupling starting
    (Fermilab and CERN)
  • Next year more production like tests with the
    LHC experiments
  • CMS-IT data streaming project inside the
    LCG framework
  • tests on several layers
    bookkeeping/production scheme, mass storage
  • coupling, transfer protocols (gridftp,
    etc.), TCP/IP optimization
  • 2008
  • multiple 10 Gbit/s lines will be availble
    with the move to 40 Gbit/s connections
  • CMS and LHCb will export the second copy of
    the raw data to the T1 center ,
  • ALICE and ATLAS want to keep the second
    copy at CERN (still ongoing discussion)

18
Comparison
2008 prediction
2003 status
  • Hierarchical Ethernet network 280 GB/s
    2 GB/s
  • 8000 mirrored disks ( 4 PB)
    2000 mirrored disk 0.25 PB
  • 3000 dual CPU nodes (20 MSI2000)
    2000 nodes 1.2 MSI2000
  • 170 tape drives (4 GB/s)
    50 drives 0.8 GB/s
  • 25 PB tape storage

    10 PB

?The CMS HLT will consist of about 1000 nodes
with 10 million SI2000 !!
19
External Fabric relations
Collaboration with India -- filesystems --
Quality of Service
LCG -- Hardware resources -- Manpower resources
Collaboration with Industry openlab HP, INTEL,
IBM, Enterasys, Oracle -- 10 Gbit networking --
new CPU technology -- possibly , new storage
technology
  • CERN IT
  • Main Fabric provider

GDB working groups -- Site coordination --
Common fabric issues
Collaboration with CASPUR --harware and software
benchmarks and tests, storage and network
External network -- DataTag, Grande -- Data
Streaming project with Fermilab
LINUX -- Via HEPIX RedHat license
coordination inside HEP (SLAC, Fermilab)
certification and security
CASTOR -- SRM definition and implementation
(Berkeley, Fermi, etc.) -- mass storage coupling
tests (Fermi) -- scheduler integration (Maui,
LSF) -- support issues (LCG, HEPCCC)
EDG, WP4 -- Installation -- Configuration --
Monitoring -- Fault tolerance
GRID Technology and deployment -- Common fabric
infrastructure -- Fabric ?? GRID
interdependencies
Online-Offline boundaries -- workshop and
discussion with Experiments -- Data
Challenges
20
FA Timeline
Power and cooling 0.8 MW
Power and cooling 2.5 MW
Power and cooling 1.6 MW
preparations, benchmarks, data challenges architec
ture verification evaluations computing models
Phase 2 installations tape,cpu,disk 30
Phase 2 installations tape,cpu,disk 60
LCG Computing TDR
2008
2007
2004
2005
2006
LHC start
25 of network backbone
50 of network backbone
100 of network backbone
Decision on batch scheduler
Decision on storage solution
21
(No Transcript)
22
LHC Computing Grid Service
  • Initial sites deploying now
  • Ready in next 6-12 months

Other Centres Academica Sinica (Taipei) Barcelona
Caltech GSI Darmstadt Italian Tier 2s(Torino,
Milano, Legnaro) Manno (Switzerland) Moscow State
University NIKHEF Amsterdam Ohio Supercomputing
Centre Sweden (NorduGrid) Tata Institute
(India) Triumf (Canada) UCSD UK Tier
2s University of Florida Gainesville University
of Prague
  • Tier 0
  • CERN
  • Tier 1 Centres
  • Brookhaven National Lab
  • CNAF Bologna
  • Fermilab
  • FZK Karlsruhe
  • IN2P3 Lyon
  • Rutherford Appleton Lab (UK)
  • University of Tokyo
  • CERN

23
Elements of a Production LCG Service
  • Middleware
  • Testing and certification
  • Packaging, configuration, distribution and site
    validation
  • Support problem determination and resolution
    feedback to middleware developers
  • Operations
  • Grid infrastructure services
  • Site fabrics run as production services
  • Operations centres trouble and performance
    monitoring, problem resolution 24x7 globally
  • RAL is leading sub-project on developing
    operations services
  • Initial prototype
  • Basic monitoring tools
  • Mail lists and rapid communications/coordination
    for problem resolution
  • Support
  • Experiment integration ensure optimal use of
    system
  • User support call centres/helpdesk global
    coverage documentation training
  • FZK leading sub-project to develop user support
    services
  • Initial prototype
  • Web portal for problem reporting
  • Expectation that initially experiments will
    triage problems and experts will submit LCG
    problems to the support service

24
Timeline for the LCG services
Agree LCG-1 Spec
Computing model TDRs
LCG-1 service opens
LCG-2 with upgraded m/w, management etc.
TDR for Phase 2
LCG-3 full multi-tier prototype batchinteractive
service
LCG-1
LCG-2
LCG-3
2003
2006
2005
2004
Stabilize, expand, develop
Evaluation 2nd generation middleware
Event simulation productions
Service for Data Challenges, batch analysis,
simulation
Validation of computing models
Acquisition, installation, testing of Phase 2
service
Phase 2 service in production
25
Deployment Activities Human Resources
Activity CERN/LCG External
Integration Certification 6 External tb sites
Debugging/development/mw support 3
Testing 3 2 VDT testers group
Experiment Integration Support 5
Deployment Infrastructure Support 5.5 RC system managers
Security/VO Management 2 Security Task Force
Operations Centres RAL GOC Task Force
Grid User Support FZK US Task Force
Management 1
Totals 25.5
In collaboration
Team of 3 Russians have 1 at CERN at a given time
(3 months)
Refer to Security talk
Refer to Operations Centre talk
  • The GDA team has been very understaffed only
    now has this improved with 7 new fellows
  • There are many opportunities for more
    collaborative involvement in operational and
    infrastructure activities

26
2003 Milestones
  • Project Level 1 Deployment milestones for 2003
  • July Introduce the initial publicly available
    LCG-1 global grid service
  • With 10 Tier 1 centres in 3 continents
  • November Expanded LCG-1 service with resources
    and functionality sufficient for the 2004
    Computing Data Challenges
  • Additional Tier 1 centres, several Tier 2 centres
    more countries
  • Expanded resources at Tier 1s
  • Agreed performance and reliability targets
  • The idea was
  • Deploy a service in July
  • Several months to gain experience (operations,
    experiments)
  • By November
  • Meet performance targets (30 days running)
    experiment verification
  • Expand resources regional centres and compute
    resources
  • Upgrade functionality

27
Milestone Status
  • July milestone was 3 months late
  • Late middleware, slow takeup in regional centres
  • November milestone will be partially met
  • LCG-2 will be a service for the Data Challenges
  • Regional Centres added to the level anticipated
    (23), including several Tier 2 (Italy, Spain, UK)
  • But
  • lack of operational experience
  • Experiments have only just begun serious testing
  • LCG-2 will be deployed in December
  • Functionality required for DCs
  • Meet verification part of milestone with LCG-2
    early next year
  • Experiments must drive addition of resources into
    the service
  • Address operational and functional issues in
    parallel with operations
  • Stability, adding resources
  • This will be a service for the Data Challenges

28
Sites in LCG-1 21 Nov
  • FNAL
  • FZK
  • Krakow
  • Moscow
  • Prague
  • RAL
  • Imperial C.
  • Cavendish
  • Taipei
  • Tokyo
  • PIC-Barcelona
  • IFIC Valencia
  • Ciemat Madrid
  • UAM Madrid
  • USC Santiago de Compostela
  • UB Barcelona
  • IFCA Santander
  • BNL
  • Budapest
  • CERN
  • CNAF
  • Torino
  • Milano

Sites to enter soon CSCS Switzerland, Lyon,
NIKHEF More tier2 centres in Italy, UK Sites
preparing to join Pakistan, Sofia
29
Achievements 2003
  • Put in place the Integration and Certification
    process
  • Essential to prepare m/w for deployment the key
    tool in trying to build a stable environment
  • Used seriously since January for LCG-0,1,2 also
    provided crucial input to EDG
  • LCG is more stable than earlier systems
  • Set up the deployment process
  • Tiered deployment and support system is working
  • Currently support load on small team is high,
    must devolve to GOC
  • Support experiment deployment on LCG-0,1
  • User support load high must move into support
    infrastructure (FZK)
  • CMS use of LCG-0 in production
  • Produced a comprehensive User Guide
  • Put in place security policies and agreements
  • Particularly important agreements on registration
    requirements
  • Basic Operations Centre and Call Centre
    frameworks in place
  • Expect to be ready for the 2004 DCs
  • Essential infrastructures are ready, but have not
    yet been production tested
  • And, improvements will happen in parallel with
    operating the system

30
Issues
  • Middleware is not yet production quality
  • Although a lot has been improved, still unstable,
    unreliable
  • Some essential functionality was not delivered
    LCG had to address
  • Deployment tools not adequate for many sites
  • Hard to integrate into existing computing
    infrastructures
  • Too complex, hard to maintain and use
  • Middleware limits a sites ability to participate
    in multiple grids
  • Something that is now required for many large
    sites supporting many experiments, and other
    applications
  • We are only now beginning to try and run LCG as a
    service
  • Beginning to understand and address missing
    tools, etc for operation
  • Delays have meant that we could not yet address
    these fundamental issues as we had hoped to this
    year

31
Expected Developments in 2004
  • General
  • LCG-2 will be the service run in 2004 aim to
    evolve incrementally
  • Goal is to run a stable service
  • Some functional improvements
  • Extend access to MSS tape systems, and managed
    disk pools
  • Distributed replica catalogs with Oracle
    back-ends
  • To avoid reliance on single service instances
  • Operational improvements
  • Monitoring systems move towards proactive
    problem finding, ability to take sites on/offline
  • Continual effort to improve reliability and
    robustness
  • Develop accounting and reporting
  • Address integration issues
  • With large clusters, with storage systems
  • Ensure that large clusters can be accessed via
    LCG
  • Issue of integrating with other experiments and
    apps

32
Services in 2004 EGEE
  • LCG-2 will be the production service during 2004
  • Will also form basis of EGEE initial production
    service
  • EGEE will take over operations during 2004 but
    same teams
  • Will be maintained as a stable service
  • Peering with other grid infrastructures
  • Will continue to be developed
  • Expect in parallel a development service Q204
  • Based on EGEE middleware prototypes
  • Run as a service on a subset of EGEE/LCG
    production sites
  • Demonstrate new architecture and functionality to
    applications
  • Additional resources to achieve this come from
    EGEE
  • Development service must demonstrate superiority
  • All aspects functionality, operational,
    maintainability, etc.
  • End 2004 hope that development service becomes
    the production service

33
Deployment Summary
  • LCG-1 is deployed to 23 sites
  • Despite the complexities and problems
  • The LCG-2 functionality
  • Will support production activities for the Data
    Challenges
  • Will allow basic tests of analysis activities
  • And the infrastructure is there to provide all
    aspects of support
  • Staffing situation at CERN is now better
  • Most of what was done so far was with limited
    staffing
  • Need to clarify situation in the regional centres
  • We are now in a position to address the
    complexities

34
EGEE-LCG Relationship
  • Enabling Grids for e-Science in Europe EGEE
  • EU project approved to provide partial funding
    for operation of a general e-Science grid in
    Europe, including the supply of suitable
    middleware
  • EGEE provides funding for 70 partners, large
    majority of which have strong HEP ties
  • Agreement between LCG and EGEE management on very
    close integration
  • OPERATIONS
  • LCG operates the EGEE infrastructure as a service
    to EGEE - ensures compatibility between the
    LCG and EGEE grids
  • In practice the EGEE grid will grow out of LCG
  • The LCG Grid Deployment Manager (Ian Bird) serves
    also as the EGEE Operations Manager

35
EGEE-LCG Relationship (ii)
  • MIDDLEWARE
  • The EGEE middleware activity provides a
    middleware package
  • satisfying requirements agreed with LCG
    (..HEPCAL, ARDA, ..)
  • and equivalent requirements from other sciences
  • Middleware - the tools that provide functions
  • that are of general application ..
  • . not HEP-special or experiment-special
  • and that we can reasonably expect to come in the
    long term from public or commercial sources (cf
    internet protocols, unix, html)
  • Very tight delivery timescale dictated by LCG
    requirements
  • Start with LCG-2 middleware
  • Rapid prototyping of a new round of middleware.
    First production version in service by end 2004
  • The EGEE Middleware Manager (Frédéric Hemmer)
    serves also as the LCG Middleware Manager

36
A seamless international Grid infrastructure to
provide researchers in academia and industry with
a distributed computing facility
PARTNERS 70 partners organized in nine regional
federations Coordinating and Lead Partner
CERN CENTRAL EUROPE FRANCE - GERMANY
SWITZERLAND ITALY - IRELAND UK - NORTHERN
EUROPE - SOUTH-EAST EUROPE - SOUTH-WEST EUROPE
RUSSIA - USA
  • STRATEGY
  • Leverage current and planned national and
    regional Grid programmes
  • Build on existing investments in Grid
    Technology by EU and US
  • Exploit the international dimensions of the
    HEP-LCG programme
  • Make the most of planned collaboration with NSF
    CyberInfrastructure initiative
  • ACTIVITY AREAS
  • SERVICES
  • Deliver production level grid services
    (manageable, robust, resilient to failure)
  • Ensure security and scalability
  • MIDDLEWARE
  • Professional Grid middleware re-engineering
    activity in support of the production services
  • NETWORKING
  • Proactively market Grid services to new research
    communities in academia and industry
  • Provide necessary education

37
EGEE partner federations
  • Integrate regional grid efforts
  • Represent leading grid activities in Europe

9 regional federations covering 70 partners in 26
countries
38
EGEE Proposal
  • Proposal submitted to EU IST 6th framework call
    on 6th May 2003
  • Executive summary (exec summary 10 pages full
    proposal 276 pages)
  • http//agenda.cern.ch/askArchive.php?baseagendac
    atega03816ida03816s52Fdocuments2FEGEE-executi
    ve-summary.pdf
  • Activities
  • Deployment of Grid Infrastructure
  • Provide a grid service for science research
  • Initial service will be based on LCG-1
  • Aim to deploy re-engineered middleware at the end
    of year 1
  • Re-Engineering of grid middleware
  • OGSA environment well defined services,
    interfaces, protocols
  • In collaboration with US and Asia-Pacific
    developments
  • Using LCG and HEP experiments to drive US-EU
    interoperability and common solutions
  • A common design activity should start now
  • Dissemination, Training and Applications
  • Initially HEP Bio

39
EGEE timeline
  • May 2003
  • proposal submitted
  • July 2003
  • positive EU reaction
  • September 2003
  • started negotiation
  • approx 32 M over 2 years
  • December 2003
  • sign EU contract
  • April 2004
  • start project

40
(No Transcript)
41
(No Transcript)
42
(No Transcript)
43
HENP Distributed Analysis
  • Authentication
  • Authorization
  • Metadata catalog
  • Group Level Analysis in an HENP experiment
  • User specifies job information including
  • Selection criteria
  • Metadata Dataset (input)
  • Information about s/w (library) and configuration
    versions
  • Output AOD and/or TAG Dataset (typical)
  • Program to be run
  • User submits job
  • Program is run
  • Selection Criteria are used for a query on the
    Metadata Dataset
  • Event ID satisfying the selection criteria and
    Logical Dataset Name of corresponding Datasets
    are retrieved
  • Input Datasets are accessed
  • Events are read
  • Algorithm (program) is applied to the events
  • Output Datasets are uploaded
  • Experiment Metadata is updated
  • Report summarizing the output of the jobs is
    prepared for the group (eg. how many evts to
    which stream, ...) extracting the information
    from the application and GridMW
  • Workload management
  • Package manager
  • Compute element
  • Metadata catalog
  • File catalog
  • Data management
  • Storage Element
  • File catalog
  • Data management
  • Storage Element
  • Metadata catalog
  • Job provenance
  • Auditing

44
Proposed Key Services for HEP Distributed
Analysis
  • LHC Computing Grid
  • A Roadmap towards Distributed Analysis
  • based on review of experiments needs
  • input to EGEE Middleware re-engineering

Job
Auditing
Provenance
Information
Service
1
2
Authentication
3
Authorization
User
Interface
API
6
4
Accounting
Metadata
DB Proxy
Catalogue
14
Grid
5
Monitoring
13
12
File
7
Catalogue
Workload
Management
10
9
Package
Data
Manager
8
Management
11
Computing
15
Element
Job
Monitor
Storage
Element
45
(No Transcript)
46
(No Transcript)
47
ARDA, EGEE LCG Middleware possible evolution
EGEE Release Candidate
EGEE Starts
ARDA Starts
ARDA Prototype
LCG2
LCG2
LCG2
12/2003
12/2004
48
Applications Area Organisation
2 meetings/mo Public minutes
Now developing a more collaborative ROOT
relationship than user/provider
Architects forum AA manager (chair), experiment
architects, project leaders, ROOT leader
Applications manager
decisions strategy
ROOT
User - provider
Applications area meeting
Simulation project
PI project
SEAL project
POOL project
SPI project
consultation
3 meetings/mo Open to all 25-50 attendees
Projects organized into work packages
49
Apps Area Projects and their Relationships
LHC Experiments
LCG Applications Area
Persistency (POOL)
Physicist Interface (PI)
Simulation
Other LCG Areas
Software Process Infrastructure (SPI)

Core Libraries Services (SEAL)
50
Applications Domain Decomposition
Products mentioned are examples not a
comprehensive list
Project activity in all expected areas except
grid services (coming with ARDA)
51
Level 1 and Highlighted Level 2 milestones
  • Jan 03 SEAL, PI workplans approved
  • Mar 03 Simulation workplan approved
  • Apr 03 SEAL V1 (Priority POOL needs)
  • May 03 SPI software library fully deployed
  • Jun 03 General release of POOL (LHCC Level 1)
  • Functionality requested by experiments for
    production usage
  • Jul 03 SEAL framework services released
    (experiment directed)
  • Jul 03 CMS POOL/SEAL integration
  • Sep 03 ATLAS POOL/SEAL integration
  • Oct 03 CMS POOL/SEAL validation (1M
    events/week written)
  • Dec 03 LHCb POOL/SEAL integration
  • Jan 04 ATLAS POOL/SEAL validation (50TB DC1 POOL
    store)
  • May 04 Generator event database beta in
    production
  • Oct 04 Generic simulation framework production
    release
  • Dec 04 Physics validation document
  • Mar 05 Full function release of POOL (LHCC Level
    1)

See supplemental slide for current milestone
performance
52
L1L2 milestone counts by quarter
  • 2004 milestones will be fleshed out by
  • the workplan updates due this quarter
  • the finalization of the slate of 10 L2
    milestones for the next quarter (2 per project)
    that we do before each quarterly report
  • New milestones will be added in ARDA planning

53
Applications Area Personnel Resources
  • LCG applications area hires complete
  • 21 working target in Sep 2001 LCG proposal was
    23
  • Contributions from UK, Spain, Switzerland,
    Germany, Sweden, Israel, Portugal, US, India, and
    Russia
  • Similar contribution levels from CERN, experiments

See supplemental slide for detail on personnel
sources
In FTEs. Experiment number includes CERN people
working on experiments
54
Personnel Distribution
Effort levels match need anticipated in blueprint
RTAG
55
And in Germany...
  • We have GridKa and GSI and DESY
  • And we are starting to increase the HEP Grid
    footprint
  • Feb. 11 meeting of the German HEP Groups to
  • to establish more flags on the German Grid map.

56
Computing for Particle Physics DESY
  • At DESY HEP computing is part of the physics
    programme.
  • DESY operates Tier 0 and Tier 1 centres for H1,
    ZEUS, Hermes, HeraB, LC and computing for
    theory.
  • Services Development (highlights)
  • Distributed Monte Carlo production since 1993
  • Data handling on the Grid dCache
  • OO simulation Geant4
  • Large computing clusters and data storage