Discussion Topics - PowerPoint PPT Presentation

Loading...

PPT – Discussion Topics PowerPoint presentation | free to download - id: 6caba1-YjE1M



Loading


The Adobe Flash plugin is needed to view this content

Get the plugin now

View by Category
About This Presentation
Title:

Discussion Topics

Description:

... SUN/UNIX/Oracle/3 Par SAN Volumes Windows Servers/BlueArc NAS Clients ... WIP: Migrate IDEAS Test Data Manufacturing Item Beta Test DesignItem Future: ... – PowerPoint PPT presentation

Number of Views:4
Avg rating:3.0/5.0
Slides: 39
Provided by: metz150
Learn more at: http://www-css.fnal.gov
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: Discussion Topics


1
(No Transcript)
2
Discussion Topics
What is Teamcenter? Teamcenter Features CAD at
Fermilab Teamcenter at Fermilab Who is
Involved Architecture Licensing Implementation
Status Obstacles and Opportunities Computing
Divisions Role Questions, Comments and Next
Steps
3
What is Teamcenter?
Teamcenter Features Data Management for
Engineering Documents CAD Models, Drawing,
Assemblies Engineering Calculations Safety
Documents Manufacturing Documents Revisioning Rele
ase Status Bill of Materials Change
Management Visualization Workflow
4
What is Teamcenter?
Teamcenter Features
5
What is Teamcenter?
CAD/CAM/CAE at Fermilab Mechanical
Analysis ANSYS 12 Mechanical Licenses 1
Multiphysics Licence 3 Design Modeler NASTRAN 8
NX NASTRAN Licenses Mechanical Design/Drafting IDE
AS 65 Drafting Licenses 30 Modeling Licenses 23
Assembly Licenses Manufacturing NX 5
Manufacturing Licenses
6
What is Teamcenter?
CAD/CAM/CAE at Fermilab FESS AutoCAD - 40
Licenses (15 Used at one time) Electrical AutoCAD
- Few Licenses for power line drawings OrCAD
19 Licenses Mentor Graphics 15 Licenses Altium
6 Licenses Other Systems Solid Edge 6 Licenses
(ADMS) Solid Works 5 Licenses (TD) 1 License
(ADMS)
7
Teamcenter at Fermilab
Who is Involved Tony Metz CAD Manager Tony
Parker ADMS Design/Drafting Supervisor John
Rauch PPD Design/Drafting Supervisor Don
Mitchell TD Design/Drafting Supervisor Paula
Lambertz ADCS Lead Designer Rich Stanek
Directorate Julie Trumbo CD TC
Infrastructure Arkadiy Klebaner Cryogenic
Safety Subcommittee Michael Geynisman Cryogenic
Safety Subcommittee Tom Page Mechanical Safety
Subcommittee Nancy Grossman ESH
8
Teamcenter at Fermilab
Architecture Database Management System Team
Data Management (TDM) 5 unique databases FERMI
Common TDM TD, PPD, ADCS, ADMS -
Departments 200K items 150K Unique 75K
external DCS items (IDEAS dwg, ACAD, text) 100K
Scanned TIFF Files 375K Total (DCS document
control system)
9
Current Situation
CAD/CAM/CAE at Fermilab Picture of Lab
architecture
10
Current Situation
CAD/CAM/CAE at Fermilab Picture of Lab
architecture
11
Teamcenter at Fermilab
CAD/CAM/CAE at Fermilab
12
Teamcenter at Fermilab
Architecture Existing 2 tier Architecture Databa
se Servers SUN/UNIX/Oracle/3 Par SAN Volumes
Windows Servers/BlueArc NAS Clients Windows
Based (Rich Client) Future 4 Tier Collaborate
with other labs and vendors Web Tier Thin
Client MS Office Integration ETS Server Update
from Engineering to Unified
13
Current Situation

14
Current Situation

15
Teamcenter at Fermilab
Architecture Software Teamcenter Engineering
2007 a1 Rich Client WIP Web Tier (WebDAV for MS
Office Integration) Future Engineering to
Unified ETS Server Thin Client Customization for
migration of Legacy Data
16
Teamcenter at Fermilab
Architecture Configuration People, Users,
Groups, Roles, Volumes General Engineering
Documents Safety Item ESH Engineering
Documents Job Request Projects Design Item
17
Teamcenter at Fermilab
Architecture WIP Migrate IDEAS Test
Data Manufacturing Item Beta Test
DesignItem Future Analysis Item Quality
Item Maintenance Item Requirements Item
18
Teamcenter at Fermilab
Licensing Author Read and Write Consumer
Read with Approve and Release Community
SharePoint plug-in to TC Originally - 101
Author Licenses Team Stanek, Metz, Parker,
Andree, Borowski, Bruce, Koncelik, Kaletka Costs
Orig. 1.3M for 500 seats Costs Now 425K
for 1200 Author, 600 Consumer, 300 Community
19
Teamcenter at Fermilab
Licensing
20
Teamcenter at Fermilab
Implementation Status - Match Teamcenter with
Engineering Process
21
Teamcenter at Fermilab
Implementation Status One Lab Wide Data
Vault One set of workflows Revisioning Release
Status 100 milestones
22
Teamcenter at Fermilab
SafetyItem ESH Documents FMEA Hazard Analysis
23
Teamcenter at Fermilab
JobRequest Design Authorization
24
Teamcenter at Fermilab
DesignItem CAD Model CAD Drawing CAD Assembly
25
Teamcenter at Fermilab
DesignItem CAD Model CAD Drawing CAD Assembly
26
Teamcenter at Fermilab
MfgItem CAM Model (Wave Linked CAD Model) Tool
Paths Tool Lists Tool Setup MG Codes
27
Teamcenter at Fermilab
Items to be Developed Requirements
Item Requirements Specifications Analysis
Item ANSYS Results Reports Engineering
Calculations Technical Specifications Posters
28
Teamcenter at Fermilab
Items to be Developed Quality Item Travelers
Inspection Data Testing Procedures Assembly
Procedures Material Specifications Maintenance
Item Operating Procedures Operating
Manuals Maintenance Records
29
Obstacles and Opportunities
Obstacles Directorate Support Division
Resources Consulting Money
30
Obstacles and Opportunities
Obstacles Directorate Support Require push from
top to move culture
31
Obstacles and Opportunities
Obstacles Division Resources Need subject
matter experts from each division to Remove
unneeded data Clean old data Help in migration
process Agree on common workflow processes
32
Obstacles and Opportunities
Obstacles Consulting Money Timely
implementation will require consulting
services Second set of eyes to make sure we are
implementing correctly
33
Obstacles and Opportunities
Obstacles - Consulting Evaluate current
configuration and Items prior to
production DesignItem Evaluation Legacy
pseudo-folder in Item Master ETS Installation JT
Released Models CGM Released Drawings PDF
Released Drawings (2D Drawings, 3D
Models) IGES/STEP Released Models
(Future) Migration Strategy IDEAS/DCS 2 tier to
4 tier upgrade Engineering to Unified upgrade
34
Obstacles and Opportunities
Obstacles - Consulting Legacy Data Folder
35
Obstacles and Opportunities
Obstacles Consulting Expectations Experiences
in Teamcenter IDEAS Integration NX Schedule
Flexibility Local Offices Implementation
Experiences ETS Custom Programming 2 Tier to 4
Tier Engineering to Unified Part of Licensing
Deal 80-120 hours of Siemens consulting
36
Obstacles and Opportunities
Opportunities New Look at Hardware SharePoint
Interface Client Performance (Workstation speed,
LAN,) 4-Tier WAN Performance Record EDMS LDAP
37
Computing Division Role
CDs Role Purchased licensing - Kaletka Site
wide software (100 vs 1000 licenses) Expand
team Revisit existing plan and make
adjustments Policy statement
38
Questions, Comments, Next Steps
Questions/Comments Next Steps CD Intro.
Meeting Other Tony Updating Implementation
Plan Policy Statement Beta Test for
DesignItem Update Experimental system to
Unified Rich Meet with Vicky
About PowerShow.com