Technology of Acoustic Influence for Production Optimization of Oil, Gas and Water Wells. - PowerPoint PPT Presentation

About This Presentation
Title:

Technology of Acoustic Influence for Production Optimization of Oil, Gas and Water Wells.

Description:

Title: 1 Last modified by: Svetlana Created Date: 9/4/2006 1:55:55 PM Document presentation format: Other titles: Tahoma Arial Calibri Arial ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 19
Provided by: atua
Category:

less

Transcript and Presenter's Notes

Title: Technology of Acoustic Influence for Production Optimization of Oil, Gas and Water Wells.


1
Technology of Acoustic Influence for
Production Optimization of Oil, Gas and Water
Wells.
  • Optimizing the effectiveness of oil, gas and
    water wells on different stages of their
    exploitation is one of the directions in water,
    oil and gas production, that show considerable
    promise. For that reason, active work in this
    field has always been conducted by research of
    scientific and engineering centres. The result of
    this work is rather big quantity of various
    methods that are now used in different corners of
    the world.

2
DFM Technology
  • The most progressive method - the acoustic
    one - has been used by us to create the
    DFM-technology i.e. technology of acoustic
    influence on the productive strata. The
    technology uses the ultrasound, which is
    irradiated by specially developed piezoceramics.
  • The DFM-technology allows to increase
    production in several times (30-300 percent) for
    oil, gas and water wells. It is made through
    breaking up the clogged strata zones and the ones
    with poor permeability. The DFM is based on using
    the MF ultrasound pulses. It is covered by
    patents of Russia and Ukraine and is
    characterized by absolute ecological safety, high
    effectiveness and low power inputs.
  • An important asset of the DFM-technology is
    that the extraction is stopped only for a short
    time exploitation of a developed well. Effect
    increases for a long time, depending on the
    geological and production characteristics of
    strata.

3
WELL
Downhole module
Perforation
Production string
4
(No Transcript)
5
DFM Technology
For more than 5 years, we has been using the DFM
-technology at various oil, gas and water fields
both in Ukraine and abroad. Within this period,
we have managed to achieve serious success in
terms of development of the technique and
equipment.
6
COMPARISON OF TECHNOLOGIES
advantages DFMultrasound Chemical Hydraulic
method     Hydraulic
Condition of oil production while execution of well cleanup works stopped only for a short time stoppage of oil production, work of well stoppage of oil production, work of well
Increase of oil production 30-300 15-50 up to 50
Well cleanup works duration 2-3 days Up to 1 month 5-7 days
Environmental safety safe harmful harmful
Guarantee and effectiveness hIgh medium low
Works safety level high medium low
Manpower resources 2 persons 2-3 persons 3-4 persons
Energy consumption low low high
Influence upon the equipment, structure of layers does not influence causes the corrosion of the equipment causes crevice appearance in the equipment, deformation of layers
7
Advantages
  • Increased acoustic power
  • Simplified service maintenance of the generator
  • The generator is overvoltage and temperature
    resistant
  • No vacuum in a zone of enhancement
  • Guaranteed increase of production resource of the
    radiator
  • Smaller dimensions
  • Lower electricity consumption.

8
Technical Specification
  • 1. ACOUSTIC RADIATOR
  • diameter 44 mm (1 3/4" 1.75 ")
  • length up to 1.5 m (5 feet)
  • weight up to 10 kg (22 pounds)
  • It is made of corrosion resistant material
  • 2. ELECTRIC CABLE with three phases conductors
    lines
  • 3. GENERATOR
  • dimensions 45?30?45 sm
  • weight lt25 kg (55 pounds)

9
Tatarstan Russia

Poltavagazvidobuvanya Ukraina
10
Ukrgasvidobuvanya Ukraina
11
Ommdurman water well Khartoum State Water Corp.
12
Economic Effectiveness of Applying DFM -technology
  • According to the recommendations on
    al-around effectiveness evaluation, economic
    effect from the carrying out the work pursuant to
    DFM technology is determined by showing the
    economic effect.
  • Calculation of the effectiveness is based
    on index of a daily oil (gas) production before
    and after DFM -technology was used during a
    certain period of time.

13
Calculation of Economic Effectiveness of Applying
DFM at Oil Wells
  • Assuming
  • ?d 6 30 180
    (days).
  • Qo 30 t/d.
  • Q?? 50 t/d.
  • P 430 /t. ( 68
    /bar. )
  • Then
  • We define additional production DQ 20 t/d .(
    65 )
  • Cost Estimation Ce 204301801 580 000 .
  • The economic analysis is evidence of high
    profitability and payback of DFM -technology used
    on oil-wells.

14
Required Preliminary Information on Wells
  • Well depth
  • The level of static (the level of liquid in the
    well) and dynamic pressures
  • Wellbottom zone temperature
  • Perforation intervals
  • Tubing running depth
  • Tubing pipes diameter (is natural flow free)
  • Project site information (name and date of the
    formation in the perforation zone)
  • Well commissioning date and initial well
    production rate
  • History and dates of the bottom-hole formation
    treatment activities (acidizing, surfactant
    treatment, etc.)
  • Dates of the latest well-logging measurements
  • Current well production rate (before ultrasound
    application)
  • Presence of any oil-water contact in the
    perforation zone (if yes, its location is to be
    specified).
  • Hydrocarbon-type composition of the oil. Note
    more important factors from these specifications
    are Density, gas factor, content of the water
    (per cent)

15
Requirements to Wells Being Enhanced
  • Accessways are required to reach the platform for
    equipment installation (jacking log-processing
    station, portable log-processing laboratory and
    jacking lubricator installation).
  • Calibering is required before the start of the
    works in order to provide free access of
    geophysical equipment and ultrasonic transducer
    to the perforation zone.
  • Well treatment zone should not be blanked off by
    tubing string pipes. The treated wells may be the
    ones that are
  • - currently exploited
  • - under major overhaul.
  • The treatment zone is to contain liquid medium.
    The level of liquid in the treatment zone should
    exceed the treatment zone.

16
  • Our technology allows to use the old well
    and maximally exploitation of their primary
    opportunities. This examples prove high and rapid
    economic effectiveness of applying DFM-technology
    on oil and gas wells, even in case of
    comparatively insignificant increase of
    production and minimal period of treatment.

17
  • The DFM-technology has been successfully
    tested on gas condensate and oil fields of
    Ukraine and Russia. Considerable well and
    hydrocarbons production increase (from 30 up to
    300 percent) has been achieved, which is
    supported by the certificates of intake capacity
    tests of KHARKOVGAZDOBYCHA, UKRNIIGAZ and
    TATNIPINEFT and many others.
  • Out of an experimental method, the DFM has
    become an industrial highly effective and
    developed technology. For the present, our
    organization is the leader in the field of
    acoustic influence technologies in Ukraine.

18
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com