Title: Technology of Acoustic Influence for Production Optimization of Oil, Gas and Water Wells.
1Technology of Acoustic Influence for
Production Optimization of Oil, Gas and Water
Wells.
- Optimizing the effectiveness of oil, gas and
water wells on different stages of their
exploitation is one of the directions in water,
oil and gas production, that show considerable
promise. For that reason, active work in this
field has always been conducted by research of
scientific and engineering centres. The result of
this work is rather big quantity of various
methods that are now used in different corners of
the world.
2DFM Technology
- The most progressive method - the acoustic
one - has been used by us to create the
DFM-technology i.e. technology of acoustic
influence on the productive strata. The
technology uses the ultrasound, which is
irradiated by specially developed piezoceramics.
- The DFM-technology allows to increase
production in several times (30-300 percent) for
oil, gas and water wells. It is made through
breaking up the clogged strata zones and the ones
with poor permeability. The DFM is based on using
the MF ultrasound pulses. It is covered by
patents of Russia and Ukraine and is
characterized by absolute ecological safety, high
effectiveness and low power inputs. -
- An important asset of the DFM-technology is
that the extraction is stopped only for a short
time exploitation of a developed well. Effect
increases for a long time, depending on the
geological and production characteristics of
strata.
3WELL
Downhole module
Perforation
Production string
4(No Transcript)
5 DFM Technology
For more than 5 years, we has been using the DFM
-technology at various oil, gas and water fields
both in Ukraine and abroad. Within this period,
we have managed to achieve serious success in
terms of development of the technique and
equipment.
6COMPARISON OF TECHNOLOGIES
advantages DFMultrasound Chemical Hydraulic
method Hydraulic
Condition of oil production while execution of well cleanup works stopped only for a short time stoppage of oil production, work of well stoppage of oil production, work of well
Increase of oil production 30-300 15-50 up to 50
Well cleanup works duration 2-3 days Up to 1 month 5-7 days
Environmental safety safe harmful harmful
Guarantee and effectiveness hIgh medium low
Works safety level high medium low
Manpower resources 2 persons 2-3 persons 3-4 persons
Energy consumption low low high
Influence upon the equipment, structure of layers does not influence causes the corrosion of the equipment causes crevice appearance in the equipment, deformation of layers
7Advantages
- Increased acoustic power
- Simplified service maintenance of the generator
- The generator is overvoltage and temperature
resistant - No vacuum in a zone of enhancement
- Guaranteed increase of production resource of the
radiator - Smaller dimensions
- Lower electricity consumption.
8Technical Specification
-
- 1. ACOUSTIC RADIATOR
- diameter 44 mm (1 3/4" 1.75 ")
- length up to 1.5 m (5 feet)
- weight up to 10 kg (22 pounds)
- It is made of corrosion resistant material
- 2. ELECTRIC CABLE with three phases conductors
lines - 3. GENERATOR
- dimensions 45?30?45 sm
- weight lt25 kg (55 pounds)
9Tatarstan Russia
Poltavagazvidobuvanya Ukraina
10Ukrgasvidobuvanya Ukraina
11Ommdurman water well Khartoum State Water Corp.
12Economic Effectiveness of Applying DFM -technology
-
- According to the recommendations on
al-around effectiveness evaluation, economic
effect from the carrying out the work pursuant to
DFM technology is determined by showing the
economic effect. -
- Calculation of the effectiveness is based
on index of a daily oil (gas) production before
and after DFM -technology was used during a
certain period of time.
13Calculation of Economic Effectiveness of Applying
DFM at Oil Wells
-
- Assuming
- ?d 6 30 180
(days). - Qo 30 t/d.
- Q?? 50 t/d.
- P 430 /t. ( 68
/bar. ) - Then
- We define additional production DQ 20 t/d .(
65 ) - Cost Estimation Ce 204301801 580 000 .
- The economic analysis is evidence of high
profitability and payback of DFM -technology used
on oil-wells.
14Required Preliminary Information on Wells
-
- Well depth
- The level of static (the level of liquid in the
well) and dynamic pressures - Wellbottom zone temperature
- Perforation intervals
- Tubing running depth
- Tubing pipes diameter (is natural flow free)
- Project site information (name and date of the
formation in the perforation zone) - Well commissioning date and initial well
production rate - History and dates of the bottom-hole formation
treatment activities (acidizing, surfactant
treatment, etc.) - Dates of the latest well-logging measurements
- Current well production rate (before ultrasound
application) - Presence of any oil-water contact in the
perforation zone (if yes, its location is to be
specified). - Hydrocarbon-type composition of the oil. Note
more important factors from these specifications
are Density, gas factor, content of the water
(per cent) -
15Requirements to Wells Being Enhanced
-
- Accessways are required to reach the platform for
equipment installation (jacking log-processing
station, portable log-processing laboratory and
jacking lubricator installation). - Calibering is required before the start of the
works in order to provide free access of
geophysical equipment and ultrasonic transducer
to the perforation zone. - Well treatment zone should not be blanked off by
tubing string pipes. The treated wells may be the
ones that are - - currently exploited
- - under major overhaul.
- The treatment zone is to contain liquid medium.
The level of liquid in the treatment zone should
exceed the treatment zone.
16-
-
-
- Our technology allows to use the old well
and maximally exploitation of their primary
opportunities. This examples prove high and rapid
economic effectiveness of applying DFM-technology
on oil and gas wells, even in case of
comparatively insignificant increase of
production and minimal period of treatment. -
17- The DFM-technology has been successfully
tested on gas condensate and oil fields of
Ukraine and Russia. Considerable well and
hydrocarbons production increase (from 30 up to
300 percent) has been achieved, which is
supported by the certificates of intake capacity
tests of KHARKOVGAZDOBYCHA, UKRNIIGAZ and
TATNIPINEFT and many others. - Out of an experimental method, the DFM has
become an industrial highly effective and
developed technology. For the present, our
organization is the leader in the field of
acoustic influence technologies in Ukraine.
18(No Transcript)