Title: CENTCOM Operational Contract Support (OCS) Planning Initiatives


1
CENTCOM CAPT Brian Mallady, J4-Contracting
Division Chief
  • CENTCOM Operational Contract Support (OCS)
    Planning Initiatives
  • Projects
  • CSIP CMP template
  • Afghanistan
  • Theater Contract ManagementJoint Theater Support
    Contracting Command (JTSCC)
  • Best Practices
  • Planning templatesfacilitates integration of
    contracting
  • Theater Business Clearance (TBC)
  • Joint Logistics Procurement Support Board
    (JLPSB)our Joint Contracting Support Board
  • Lessons Learned
  • SPOT implementation
  • Joint contracting construct
  • Planned Project Initiatives (12-18 months)
  • Central and South Asia (CASA) Assessment
  • JTSCC concept to implementationif approved
  • OCS synchronization in CENTCOM plans Raise the
    high bar

2
CENTCOM CAPT Brian Mallady, J4-Contracting
Division Chief
OPLAN/CONPLAN Review Status
of Plans of Plans reviewed of Plans updated or considered complete
OPLANS CONPLANS w/TPFDD (Tier 3 4) 6 4 4
CONPLANS (TIER 1 2) 9 2 2
3
BACK UP SLIDES
4
JTSCC Proposed CONOPS
Major Changes
Proposed
  • JCC-I/A becomes Joint Theater Support
    Contracting Command (JTSCC)
  • Moves from a major subordinate command under
    MNF-I to under CENTCOM
  • Contract Authorities Extended to include Kuwait
    and Pakistan
  • Provides Theater Support contract management and
    Theater Business Clearance for Iraq, Kuwait,
    Afghanistan, and Pakistan
  • PARC-I becomes PARC-I/K PARC-A becomes PARC-A/P
  • PARC-I/K and A/P become 1-star billets
  • BPT move HQ (Kuwait, CFH or collocated with
    major customer)
  • BPT assume contracting C2 for other AOR
    countries (expandable)

CENTCOM
JTSCC
Represents 93 of CENTCOM theater support
contracting activities
5
JTSCC Draft Organizational Construct
CENTCOM
COCOM OPCON Support Coordination
CCJ4
USFOR-A/ CJTF-101
MNF-I
CJTF-Log
JTSCC

JTSCC is not a standing enduring organization
DLA
DCMA

USACE
PARC-I/K

SOCOM
PARC-A/P
Reachback
  • - PARC-A/P assumes C2 of Pakistan contracting
    ops ISO OEF
  • PARC-I/K assumes C2 of ACC-K and AFFOR A7K for
    Theater Support contracting in Kuwait
  • PARC-SWA keeps enduring AMC mission in Kuwait

CCDR could designate the JTSCC as a major
subordinate command under CJTF-Log in future
construct
  • PARC-A/P and PARC-I/K upgraded to 1-star billet
  • Staffed from 5 DoD approved additional GO/FO
    billets

5
6
Effectiveness EfficiencyJCC-I/A Examples
  • OIF Consolidated numerous individual and sole
    source Information Operations contracts into a
    single competitive bid annual contract with two
    one-year options. RESULT 9-12M Annual Savings.
  • OEF Replaced numerous Host Nation Trucking BPAs
    with multiple vendors into an ID/IQ contract.
    RESULT Decreased lead-time, reduced CJTF
    man-hours in coordinating HN support, and 10
    overall cost savings (approximately 36M).
  • Building Iraq/Afghan Economies
  • 42 of 5.9B to Iraqi firms
  • 67 of 1.6B to Afghan firms

Volume in Actions 26,994 37,953 41,160
Volume in Dollars 5.7B 5.3B 7.5B
  • Only 249 people
  • Avg of 165 actions and over 30M per KO

Procurement Support Boards
Flexibility moved KOs from IZ to AFG to meet
requirements
Standardized practices
HCA authority in theaterdecision making
Built in legal staff