Title: EDS 1 and 2 Update Early Delivery Systems


1
EDS 1 and 2 UpdateEarly Delivery Systems
  • Standards Workshop
  • September 17, 2007

2
EDS 1 and 2 Early Delivery Systems
  • Agenda
  • Setting the Context
  • EDS Release Overview
  • EDS 1
  • Point-to-Point Status
  • EDS 2
  • Schedule and Activities
  • Telemetry and SE Standards Update
  • SCADA and NOM Issues Management

3
EDS Release Overview
  • EDS 1 Release 1 Alarm Processing
  • EDS 1 Release 2 Point-to-Point Checkout
  • EDS 2 Release 3 State Estimator Network
    Security Analysis
  • EDS 2 Release 4 Network Model Validation
  • EDS 3 Release 5 SCED execution and posting
    LMPs
  • EDS 3 Release 6 Load Frequency Control
  • EDS 3 Release 7 Settlement Statements, CRR
    Allocation Auction
  • EDS 4 Release 8 RT Settlements (no Shadow
    Settlements)
  • EDS 4 Release 9 DAM, RUC, SASM, Full
    Settlements, EDW Extracts

4
EDS 1 Early Delivery Systems
  • EDS 1 Release 2
  • Point to Point Testing

5
EDS 1 Early Delivery Systems
  • Beta Testing Results
  • Testing Completed (Friday April 20th, 2007)
  • 33 or 38 MPs participated
  • A sample of 2200 Zonal points checked
  • 10 errors found (non-quality code related)
  • Market and TPTF Agreed to Perform Full P2P

6
EDS 1 Early Delivery Systems
  • Point-to-Point Status
  • Testing Began Monday June 4, 2007
  • June - CenterPoint Energy and Oncor (TSP)
    verifications
  • July first stage of TSP and QSE verifications
  • August - second stage of QSE and TSP
    verifications
  • September - Remaining verifications
  • Current Status
  • 92 Complete
  • 60,000 of 67,000 Nodal points verified
  • Error rate of approximately 4
  • Scheduled to Complete September 30, 2007
  • Failover Testing will be performed
  • Quality Codes will be re-verified pending EMS fix
  • Failed points will be re-verified

7
EDS 2 Early Delivery Systems
  • EDS 2 Release 3
  • State Estimator and Network Security Analysis

8
EDS 2 - Release 3 Timeline
Nodal Critical Path
Activities Timeline
Deliverables
Inputs
Performance Reports Based on Telemetry and SE
Standards
Nodal
?
TPTF
Protocols
Verified Protocols
Trans Plan
?
Tele
SE
MP Extracts
Standards
EDS 2 Starts
?
Nodal Procedures
Use Cases
?
Completed Metrics
Zonal Procedures
9
EDS 2 Release Overview
  • EDS 2 Activities
  • Release 3
  • Tune State Estimator
  • Minimize calculated points
  • Minimize ERCOT manual replacements
  • Eliminate calculated and replaced net generation
  • Measure Telemetry and State Estimator Performance
  • Provide reporting to MPs based on Telemetry and
    SE Standards
  • Resolve data issues between ERCOT and MPs
  • Verify Network Security Analysis Functions
  • Verify transmission constraint management
  • Verify dynamic ratings
  • Verify special protection schemes (SPS) /
    remedial action plans (RAP)

10
EDS 2 Telemetry and SE Standards Update
  • Nodal Telemetry and SE Standards Update
  • Existing Standards were developed in 2006
  • Standards can be revised each October
  • Nodal EMS functionality will measure / report on
    SCADA and SE performance based on Telemetry and
    State Estimator Standards
  • ERCOT revisions
  • Align standards to conform with NERC standards
    format
  • Reference Nodal Protocols and Operating Guides
  • Evaluate standards measurements, metrics and
    compliance
  • Revisions sent to Market Participants September
    10, 2007
  • Standards Workshop September 17, 2007
  • Standards approval targeted for October 5, 2007

11
EDS 2 Data Issue Management
  • SCADA / NOM Data Issues Management
  • Definition
  • Nodal EMS will provide tools to measure SCADA and
    SE performance
  • Performance measurements are based on Telemetry
    and SE Standards
  • SCADA not performing to standards will be
  • reported using ERCOT Enterprise Data Warehouse
    functionality
  • available to ERCOT and to the responsible MP via
    the MIS portal
  • resolved jointly between ERCOT Operations Support
    and the MPs
  • Conclusion
  • ERCOT Ops Support will utilize a Data Issues
    Management Tool
  • To resolve on-going performance issues

ERCOT
I C C P
p2p
Issue Mgmt
MPs
EMS
EDW
12
EDS 2 Early Delivery Systems