Title: DRAFT DEVELOPMENT PLAN (2007-2012)
1DRAFT DEVELOPMENT PLAN (2007-2012)
- BHADRESWAR MUNICIPALITY
- HOOGHLY DISTRICT
Presentation to KMPC Technical Committee
23rd Feb07
2Structure of the presentation
- Background
- Bhadreswar Municipality An Overview
- Vision
- Key Issues
- Features
- The Process
- Component 1 Sub-component wise projects
- Component 2 Sub-component wise projects
- Component 3 Sub-component wise projects
- Financial plan
3Background
- West Bengal Municipal Act, 1993 in the context of
DDP - BM inspired by Perspective Plan of Kolkata-Vision
2025 - Boost for DDP with assistance from DFID
- Launch workshop for DDP
- Focus on decentralized and participatory Planning
4Bhadreswar Municipality An Overview
- Area 8.28 Sq. Km.
- No. of Wards 20
- Population 1.06 lakhs
- Literacy Rate 89
- CBR 9.26(2005-06)
- CDR 4.14(2005-06)
- IMR 2.63(2005-06)
- No. of Slums 6
- Slum population 53.4
- Male55 Female45
- Total quantity of water supply2.74 MGD
- Total Road Network100618Km
- Capacity of STP 7.6 MLD
5Key Issues
- Provision for 24X7 Water Supply
- Integrated Sanitation Programme (elimination of
Open Defecation) - Shelter Upgradation for slum dwellers
- Improved Road network, Sewerage and Drainage
network and Solid Waste Management System - Improved Health and Education for all
- Strengthening of Income Generation Programme
- Providing Quality Service to the citizens
6Our Vision..
- Bhadreswar Municipality Town will be
economically prosperous, environmentally
sustainable and socially harmonious
7DDP Features
- Vision Comprehensive and Holistic
- Participation from citizens and stakeholders have
been ensured - Prioritized on the basis of needs of the urban
poor - Used specialized skills of experts
- Realistic budget
8DDP Preparation The Process
- DDP Launch and Sensitization Workshop
- Formulation of Municipal vision
- Covering steps of stages 1,2,3 as per guidelines
- Preparation of component wise proposals through
- Problem identification
- Formation of teams/appointments of external
agencies - Situational analysis
- Considering schemes proposed by Ward Committees
and stakeholders - Identification of gaps
- Technical analysis
9Component1
- Infrastructure, Land Use and Environment
Development Plan
10Slum Infrastructure Improvement Plan Features
- Total No. of Slums in Bhadreswar Municipality 6
- Slum Population 53.4 of total population(1.06
lakh app.) - Aims to Improve the quality of life through
providing - Basic services to the urban poor
- Betterment of services likeWater supply,
Sanitation,Drainage system, Road network,Solid
Waste Management - Prioritization of slums follow QSS with some
modifications - Plan Includes
- Improvement in Maintenance of Assets,Capital
Intensive projects and projects related with
community participation - Excluded group will be covered through the above
11Slum Infrastructure Improvement PlanAt a glance
- Project
cost (INR in Lakhs) - Name of slum Capital-intensive projects
OM Projects - Bhadreswar Basti 164.33
31.0 - Sarat Chandra Basti 411.5
44.30 - Mujjafar Ahmed Basti 104.85
24.0 - Sarada Basti 104.95
65.67 - Jwaharlal Nehru Basti 208.95
18.85 - Munsi Premchand Basti 147.90
46.50 -
- Community Participation projects 28.0
- Major fund source KUSP, JNNURM,ULB
- No. of Drop down list of projects11
12Intra Municipal Infrastructure Development Plan
- Improvement in Operations includes
- 6 Projects related to Operation in SWM, Road
Junction development, Construction of rickshaw
stand, Construction of Auto rickshaw stand,
Construction of Jetty, Water supply works with an
estimated investment of Rs. 627.5 Lakhs - Improvement in Maintenance includes
- 21 projects related to improvement of Playground,
Crematorium, Roads, Street Light, Municipal
assets etc. with an investment of Rs. 326.20
Lakhs -
13Continued
- 16 Significant Capital Intensive Projects
include - Augmentation of Water Supply, STP, Construction
and Widening of Roads, Drainage etc. with an
investment of Rs. 8660 Lakhs. - The project Construction of Fly over Approach
Road (cost Rs. 5000.0 lakhs) has been kept in the
Drop down list of projects. - 4 other projects related to Street light
arrangement and construction of Community Halls
and Seva Kendras are also kept in the Drop down
list.
14Trans Municipal Linkages
- Identified projects include
- Renovation of Kumra Khal, Ghungir Khal
Saraswati Khal - Supply of treated Surface water
- Chandannagore ditch DVC canal
- Excavation of rail borrow pit
- Construction of bridge over river Ganga
- Const. of Floating jetty at Babu ghat
15Continued
- Ferry Service Bhadreswar to Babughat(Kolkata-Howr
ah) - Widening of culvert GT road
- Development of Mankundu Mental Hospital
- Development of Nasibpur Road
- Development of J C Khan Road from Mankundu
Delhi Road -
- Total Project Cost11458.0 lakhs with an OM
cost119.20 lakhs. Collaboration will be sought
from KMDA (Govt. of West Bengal) as it is not
reflected in estimated Financial Plan
16Land Use Development Plan
- Identified projects are
- Land Use and Development Monitoring Cell
- Shelter up gradation for Slum Dwellers
- Completion of Remaining portion of Subhas Maidan
Playground - Social Forestry Project
- Electrification through Solar energy
- Provision would be made for projects related with
other sub-component plans
17Environment Management Plan
- Identified projects are
- Procurement of one dead body carrying vehicle
- Environment Monitoring Cell
- Peripheral Drain surrounding the waste disposal
ground - Awareness Generation Programme.
- Collection of waste (excreta) from cattle sheds
18Continued
- Water Testing Laboratory
- Renovation of Polluted Water Bodies.
- Preservation of Heritage Buildings
- Rain Water Harvesting
- Total Project cost 146.2 lakhs
- The project on Water Testing Laboratory will
be merged with Augmentation of Water supply
system of Intra- Municipal infrastructure
project. The project on Disaster Preparedness has
been kept in the Drop Down list
19Component 2
- Social and Livelihood Development Plan
20Livelihoods and Poverty Management Plan
- Vocational Training for enhancement of Skills for
building center related activities - Promotion of Self Help Groups (SHG- 400 Nos),
DWCUA (50 Nos) and handholding support to women - Rickshaw Bank
- Creation of Help Desk for convergence of all
existing government Sponsored Programme through
BSKP cell - Sewing Machine bank
21Continued
- Setting up of Auto mobile service centre and
Motor vehicle related training - UPE Cell Strengthening by providing Capacity
building training - Training for TCG leaders
- Vocational Training for enhancement of Skills
Computer, Sebika, Physiotherapy, beautician,
tailoring, 3 wheeler motor winding. - Setting up of Fishery project including setting
up of hatchery - Awareness facilitation of implementation of
social security programme - Total Project Cost124.29 lakhs
22Local Economic Development Plan
- Development of 4 Municipal Markets (Vegetable
hub) - Mini Cold Storage
- Solid Waste Management involving CDS (Env)
- Dairy development programme Cluster
- Service Centre - Jute Diversified Products
- Silk Screen Printing designing training
23Continued
- Haldia Petrochemical down stream industries
- Umbrella branding and Market linkages strategy to
sell SHG products - Food processing cluster
- Leaf Plate and Thermocol Plate Manufacturing Unit
- Awareness Cleanliness of food vendors
- Supply of cooked food, milk by setting up
facility center - Total Project Cost147.75 lakhs
24Health Care Service Delivery Improvement Plan
- Procurement of six Ambulances
- Up gradation of IPP unit, ESOPD
- Equipment of RDC up gradation USG, Scan, Potable
Xray, Digital Xray - Upgradation of Health Infrastructure for HAU,
preventive services - Municipality IPP Maternity Home strengthening
- All District Level Programme Training
25Continued
- Computerised Register of Birth, Death License
Ankur (Municipality Hospital) computerisation - Central Medical Store
- Electric Crematorium Additional unit
- Symphonic Water Scale
- Dog Pound Sterilisation units
- Total Project Cost 429.0 lakhs
26Primary Education Improvement Plan
- Teaching Aids and Furniture
- IEC on Safety Measures, Health Education, Quality
of education, vocation training opportunity,
Entrepreneurship ability etc. - New School building 7 SSK 15 Pvt Schools
- Construction / completion of Class rooms
- Provision of Girls Toilet and Urinal
27Continued
- Provision of Boys Toilet and Urinal
- Provision of Kitchen Shed
- Water Electricity connection
- Minor repairing of School building
- Provision of Adult Education Centre
- Total Project CostRs. 151.75 lakhs
28Organizational Development Plan
- Development of detailed Role manual Performance
appraisal system of HODs, Councillors various
committees - Purchase of Computers and hand holding Computer
Training - Develop and implement training programmed
- Resource mobilization cell integrated with
collection monitoring cell - Introduction of Financial Manual
- Ward Office strengthening
- Human Resource Cell
- Total Project Cost Rs.82.0 lakhs
29Identification of New OD Proposal (Version II)
- Ascertaining Manpower requirement as per emerging
need for meeting the future operation requirement
(At least 26personnel required in various
categories). - Yearly 26 lakhs (app.) required as salary (Not
included in the financial plan Depends upon 80
Govt. contribution) - To introduce WAN integrating Ward Administration
- Construct 15 Ward Offices
30Process and Systems Improvement Plan
- Decentralized Approach to Service Delivery
- Implement Computerization Programme LAN
connectivity - Introduce Information Systems to improve access
to information - Introduction of Internal Management Audit and
system audit in all departments in once in
quarterly - Total Project Cost 44.5 lakhs
31Citizens Interface Plan
- Introduction of website
- Setting up of Grievance redress Cells at every
Ward office - Awareness creation among all citizens
- Total Project CostRs.18.0lakhs
32Financial Plan
- Revenue Enhancement Initiatives
- Expenditure Management Initiative
- Asset Management Initiatives
33(No Transcript)
34(No Transcript)
35(No Transcript)
36(No Transcript)
37Monitoring and Evaluation Framework
38THANK YOU