DRAFT DEVELOPMENT PLAN (2007-2012) - PowerPoint PPT Presentation

1 / 38
About This Presentation
Title:

DRAFT DEVELOPMENT PLAN (2007-2012)

Description:

DRAFT DEVELOPMENT PLAN (2007-2012) BHADRESWAR MUNICIPALITY HOOGHLY DISTRICT Presentation to KMPC Technical Committee 23rd Feb 07 – PowerPoint PPT presentation

Number of Views:105
Avg rating:3.0/5.0
Slides: 39
Provided by: SUMANTAaf
Category:

less

Transcript and Presenter's Notes

Title: DRAFT DEVELOPMENT PLAN (2007-2012)


1
DRAFT DEVELOPMENT PLAN (2007-2012)
  • BHADRESWAR MUNICIPALITY
  • HOOGHLY DISTRICT

Presentation to KMPC Technical Committee
23rd Feb07
2
Structure of the presentation
  • Background
  • Bhadreswar Municipality An Overview
  • Vision
  • Key Issues
  • Features
  • The Process
  • Component 1 Sub-component wise projects
  • Component 2 Sub-component wise projects
  • Component 3 Sub-component wise projects
  • Financial plan

3
Background
  • West Bengal Municipal Act, 1993 in the context of
    DDP
  • BM inspired by Perspective Plan of Kolkata-Vision
    2025
  • Boost for DDP with assistance from DFID
  • Launch workshop for DDP
  • Focus on decentralized and participatory Planning

4
Bhadreswar Municipality An Overview
  • Area 8.28 Sq. Km.
  • No. of Wards 20
  • Population 1.06 lakhs
  • Literacy Rate 89
  • CBR 9.26(2005-06)
  • CDR 4.14(2005-06)
  • IMR 2.63(2005-06)
  • No. of Slums 6
  • Slum population 53.4
  • Male55 Female45
  • Total quantity of water supply2.74 MGD
  • Total Road Network100618Km
  • Capacity of STP 7.6 MLD

5
Key Issues
  • Provision for 24X7 Water Supply
  • Integrated Sanitation Programme (elimination of
    Open Defecation)
  • Shelter Upgradation for slum dwellers
  • Improved Road network, Sewerage and Drainage
    network and Solid Waste Management System
  • Improved Health and Education for all
  • Strengthening of Income Generation Programme
  • Providing Quality Service to the citizens

6
Our Vision..
  • Bhadreswar Municipality Town will be
    economically prosperous, environmentally
    sustainable and socially harmonious

7
DDP Features
  • Vision Comprehensive and Holistic
  • Participation from citizens and stakeholders have
    been ensured
  • Prioritized on the basis of needs of the urban
    poor
  • Used specialized skills of experts
  • Realistic budget

8
DDP Preparation The Process
  • DDP Launch and Sensitization Workshop
  • Formulation of Municipal vision
  • Covering steps of stages 1,2,3 as per guidelines
  • Preparation of component wise proposals through
  • Problem identification
  • Formation of teams/appointments of external
    agencies
  • Situational analysis
  • Considering schemes proposed by Ward Committees
    and stakeholders
  • Identification of gaps
  • Technical analysis

9
Component1
  • Infrastructure, Land Use and Environment
    Development Plan

10
Slum Infrastructure Improvement Plan Features
  • Total No. of Slums in Bhadreswar Municipality 6
  • Slum Population 53.4 of total population(1.06
    lakh app.)
  • Aims to Improve the quality of life through
    providing
  • Basic services to the urban poor
  • Betterment of services likeWater supply,
    Sanitation,Drainage system, Road network,Solid
    Waste Management
  • Prioritization of slums follow QSS with some
    modifications
  • Plan Includes
  • Improvement in Maintenance of Assets,Capital
    Intensive projects and projects related with
    community participation
  • Excluded group will be covered through the above

11
Slum Infrastructure Improvement PlanAt a glance
  • Project
    cost (INR in Lakhs)
  • Name of slum Capital-intensive projects
    OM Projects
  • Bhadreswar Basti 164.33
    31.0
  • Sarat Chandra Basti 411.5
    44.30
  • Mujjafar Ahmed Basti 104.85
    24.0
  • Sarada Basti 104.95
    65.67
  • Jwaharlal Nehru Basti 208.95
    18.85
  • Munsi Premchand Basti 147.90
    46.50
  • Community Participation projects 28.0
  • Major fund source KUSP, JNNURM,ULB
  • No. of Drop down list of projects11

12
Intra Municipal Infrastructure Development Plan
  • Improvement in Operations includes
  • 6 Projects related to Operation in SWM, Road
    Junction development, Construction of rickshaw
    stand, Construction of Auto rickshaw stand,
    Construction of Jetty, Water supply works with an
    estimated investment of Rs. 627.5 Lakhs
  • Improvement in Maintenance includes
  • 21 projects related to improvement of Playground,
    Crematorium, Roads, Street Light, Municipal
    assets etc. with an investment of Rs. 326.20
    Lakhs

13
Continued
  • 16 Significant Capital Intensive Projects
    include
  • Augmentation of Water Supply, STP, Construction
    and Widening of Roads, Drainage etc. with an
    investment of Rs. 8660 Lakhs.
  • The project Construction of Fly over Approach
    Road (cost Rs. 5000.0 lakhs) has been kept in the
    Drop down list of projects.
  • 4 other projects related to Street light
    arrangement and construction of Community Halls
    and Seva Kendras are also kept in the Drop down
    list.

14
Trans Municipal Linkages
  • Identified projects include
  • Renovation of Kumra Khal, Ghungir Khal
    Saraswati Khal
  • Supply of treated Surface water
  • Chandannagore ditch DVC canal
  • Excavation of rail borrow pit
  • Construction of bridge over river Ganga
  • Const. of Floating jetty at Babu ghat

15
Continued
  • Ferry Service Bhadreswar to Babughat(Kolkata-Howr
    ah)
  • Widening of culvert GT road
  • Development of Mankundu Mental Hospital
  • Development of Nasibpur Road
  • Development of J C Khan Road from Mankundu
    Delhi Road
  • Total Project Cost11458.0 lakhs with an OM
    cost119.20 lakhs. Collaboration will be sought
    from KMDA (Govt. of West Bengal) as it is not
    reflected in estimated Financial Plan

16
Land Use Development Plan
  • Identified projects are
  • Land Use and Development Monitoring Cell
  • Shelter up gradation for Slum Dwellers
  • Completion of Remaining portion of Subhas Maidan
    Playground
  • Social Forestry Project
  • Electrification through Solar energy
  • Provision would be made for projects related with
    other sub-component plans

17
Environment Management Plan
  • Identified projects are
  • Procurement of one dead body carrying vehicle
  • Environment Monitoring Cell
  • Peripheral Drain surrounding the waste disposal
    ground
  • Awareness Generation Programme.
  • Collection of waste (excreta) from cattle sheds

18
Continued
  • Water Testing Laboratory
  • Renovation of Polluted Water Bodies.
  • Preservation of Heritage Buildings
  • Rain Water Harvesting
  • Total Project cost 146.2 lakhs
  • The project on Water Testing Laboratory will
    be merged with Augmentation of Water supply
    system of Intra- Municipal infrastructure
    project. The project on Disaster Preparedness has
    been kept in the Drop Down list

19
Component 2
  • Social and Livelihood Development Plan

20
Livelihoods and Poverty Management Plan
  • Vocational Training for enhancement of Skills for
    building center related activities
  • Promotion of Self Help Groups (SHG- 400 Nos),
    DWCUA (50 Nos) and handholding support to women
  • Rickshaw Bank
  • Creation of Help Desk for convergence of all
    existing government Sponsored Programme through
    BSKP cell
  • Sewing Machine bank

21
Continued
  • Setting up of Auto mobile service centre and
    Motor vehicle related training
  • UPE Cell Strengthening by providing Capacity
    building training
  • Training for TCG leaders
  • Vocational Training for enhancement of Skills
    Computer, Sebika, Physiotherapy, beautician,
    tailoring, 3 wheeler motor winding.
  • Setting up of Fishery project including setting
    up of hatchery
  • Awareness facilitation of implementation of
    social security programme
  • Total Project Cost124.29 lakhs

22
Local Economic Development Plan
  • Development of 4 Municipal Markets (Vegetable
    hub)
  • Mini Cold Storage
  • Solid Waste Management involving CDS (Env)
  • Dairy development programme Cluster
  • Service Centre - Jute Diversified Products
  • Silk Screen Printing designing training

23
Continued
  • Haldia Petrochemical down stream industries
  • Umbrella branding and Market linkages strategy to
    sell SHG products
  • Food processing cluster
  • Leaf Plate and Thermocol Plate Manufacturing Unit
  • Awareness Cleanliness of food vendors
  • Supply of cooked food, milk by setting up
    facility center
  • Total Project Cost147.75 lakhs

24
Health Care Service Delivery Improvement Plan
  • Procurement of six Ambulances
  • Up gradation of IPP unit, ESOPD
  • Equipment of RDC up gradation USG, Scan, Potable
    Xray, Digital Xray
  • Upgradation of Health Infrastructure for HAU,
    preventive services
  • Municipality IPP Maternity Home strengthening
  • All District Level Programme Training

25
Continued
  • Computerised Register of Birth, Death License
    Ankur (Municipality Hospital) computerisation
  • Central Medical Store
  • Electric Crematorium Additional unit
  • Symphonic Water Scale
  • Dog Pound Sterilisation units
  • Total Project Cost 429.0 lakhs

26
Primary Education Improvement Plan
  • Teaching Aids and Furniture
  • IEC on Safety Measures, Health Education, Quality
    of education, vocation training opportunity,
    Entrepreneurship ability etc.
  • New School building 7 SSK 15 Pvt Schools
  • Construction / completion of Class rooms
  • Provision of Girls Toilet and Urinal

27
Continued
  • Provision of Boys Toilet and Urinal
  • Provision of Kitchen Shed
  • Water Electricity connection
  • Minor repairing of School building
  • Provision of Adult Education Centre
  • Total Project CostRs. 151.75 lakhs

28
Organizational Development Plan
  • Development of detailed Role manual Performance
    appraisal system of HODs, Councillors various
    committees
  • Purchase of Computers and hand holding Computer
    Training
  • Develop and implement training programmed
  • Resource mobilization cell integrated with
    collection monitoring cell
  • Introduction of Financial Manual
  • Ward Office strengthening
  • Human Resource Cell
  • Total Project Cost Rs.82.0 lakhs

29
Identification of New OD Proposal (Version II)
  • Ascertaining Manpower requirement as per emerging
    need for meeting the future operation requirement
    (At least 26personnel required in various
    categories).
  • Yearly 26 lakhs (app.) required as salary (Not
    included in the financial plan Depends upon 80
    Govt. contribution)
  • To introduce WAN integrating Ward Administration
  • Construct 15 Ward Offices

30
Process and Systems Improvement Plan
  • Decentralized Approach to Service Delivery
  • Implement Computerization Programme LAN
    connectivity
  • Introduce Information Systems to improve access
    to information
  • Introduction of Internal Management Audit and
    system audit in all departments in once in
    quarterly
  • Total Project Cost 44.5 lakhs

31
Citizens Interface Plan
  • Introduction of website
  • Setting up of Grievance redress Cells at every
    Ward office
  • Awareness creation among all citizens
  • Total Project CostRs.18.0lakhs

32
Financial Plan
  • Revenue Enhancement Initiatives
  • Expenditure Management Initiative
  • Asset Management Initiatives

33
(No Transcript)
34
(No Transcript)
35
(No Transcript)
36
(No Transcript)
37
Monitoring and Evaluation Framework
38
THANK YOU
Write a Comment
User Comments (0)
About PowerShow.com