Title: Standard Test Method for Density (unit weight), Yield, and Air Content (Gravimetric) of Concrete
1 ACI Certification Section 4 ASTM C138
- Introduction
- Standard Test Method for Density (unit weight),
Yield, and Air Content (Gravimetric) of Concrete - Apparatus
- Sample
- Procedure
2 ACI Certification Section 4 ASTM C138
- Apparatus
- Balance
- 0.1 lbs accuracy or within 0.3 of the test load
- Whichever is greater at any point within the
range of use. - Range of use shall be from mass of the measure
empty to measure plus contents _at_160/cft - i.e. air meter bowl - 10s
- concrete_at_160/cft for .25 cft.- 40s
- (Range of use) - 50s
3 ACI Certification Section 4 ASTM C138
- Apparatus
- Tamping Rod
- A round ,Straight Steel Rod, 5/8 inch dia.
- 24 in. in length
- Tamping end rounded to a hemispherical tip 5/8
in.
4 ACI Certification Section 4 ASTM C138
- Apparatus
- Internal Vibrator
- 7000 vibrations per min.or more
- Outside dimension 0.75in and less than 1.50in.
- The length of the shaft shall be at least 24 in.
5 ACI Certification Section 4 ASTM C138
- Apparatus
- Strike-off Plate
- A flat rectangular metal plate at least ¼ in.
thick or a glass or acrylic plate at least ½ in.
thick with a length and width at least 2in.
Greater than the diameter of the measure with
which it is to be used.
6 ACI Certification Section 4 ASTM C138
- Apparatus
- Mallet
- A mallet (with a rubber or rawhide head) having
a mass of 1.250.50lb for use with measures of
0.5 cft or smaller - Mass of 2.250.50lb for greater than 0.5 cft.
7 ACI Certification Section 4 ASTM C138
- Sample
- ASTM C172
- 1 nominal max size aggregate
- 0.2 cft capacity measure
8 ACI Certification Section 4 ASTM C138
- Procedure
- Rod for slumps gt 3
- Rod or vibrate bet.1-3
- Vibrate lt 1
9 ACI Certification Section 4 ASTM C138
- Procedure
- Rod 25 times lt 0.5 cft
- Rod 50 times 1 cft
- Rod 1 per 3sqin. gt 1cft
- Rod bottom layer not touching the bottom of pale
- For two top layers penetrate 1 in. into layer
below
10 ACI Certification Section 4 ASTM C138
- Procedure
- After each layer is rodded, tap the sides 10-15
times - The force should close voids and release air
bubble from mix - Add the final layer so as to avoid overfilling
11 ACI Certification Section 4 ASTM C138
- Procedure
- Fill and vibrate the measure in two approximately
equal layers - Do not allow vibrator to touch or rest on bottom
or sides during bottom layer vibrating - When vibrating final layer, penetrate only 1 inch
into layer below. - No air pockets should be left in mix when
withdrawing vibrator - Continue vibration until proper consolidation is
achieved
12 ACI Certification Section 4 ASTM C138
- Procedure
- Concrete must not contain a substantial excess or
deficiency of concrete - An excess of concrete protruding approx 1/8 in.
above the top of the mold - A small quantity of conc. May be added to correct
the dificiency - If there is an excess, remove with a scoop or
trowel immediately after consolidation but before
struck -off
13 ACI Certification Section 4 ASTM C138
- Procedure
- Strike-off should be pressed on top of surface
about 2/3 of the surface and withdrawing the
plate in a sawing motion to finish area
originally covered - The place the plate on the top of the measure to
cover the original 2/3 of the surface and advance
it with a vertical pressure and sawing motion
until it slides of the edge - Several final strokes with the inclined edge of
the plate will produce a smooth finished surface - After the strike-off, clean all excess concrete
from exterior measure and determine mass