Systems Design: Job-Order costing - PowerPoint PPT Presentation

1 / 53
About This Presentation
Title:

Systems Design: Job-Order costing

Description:

Title: Chapter 1 Author: Jon Booker Last modified by: abc Created Date: 1/28/1999 4:19:41 PM Document presentation format: On-screen Show Company: Jon A. Booker, Ph.D ... – PowerPoint PPT presentation

Number of Views:92
Avg rating:3.0/5.0
Slides: 54
Provided by: JonB166
Category:

less

Transcript and Presenter's Notes

Title: Systems Design: Job-Order costing


1
Systems DesignJob-Order costing
2
Types of Costing Systems Used to Determine
Product Costs
ProcessCosting
Job-orderCosting
Chapter 4
  • Banyak produk berbeda diproduksi masing-masing
    periode.
  • Produk dihasilkan untuk pesanan.
  • Biaya ditelusuri atau dialokasikan ke pekerjaan.
  • Catatan Biaya harus pelihara untuk masing-masing
  • pekerjaan atau produk.

3
Types of Costing Systems Used to Determine
Product Costs
ProcessCosting
Job-orderCosting
  • Aplikasi Biaya pesanan (Job order cost)
  • Barang cetakan (Special-Order printing)
  • Konstruksi Bangunan
  • Juga yang digunakan dalam industri
  • jasa/layanan
  • Rumah sakit
  • Biro Hukum

4
Job-Order Costing
Manufacturingoverhead (OH) Yg diberlakukan ke
pekerjaan menggunakan penentuan dimuka
Directmaterial
Traced directly to each job
Traced directly to each job
Direct labor
5
Urutan Peristiwa dalam Sistem penetapan biaya
pesanan Job-Order Sequence of Events in a
Job-Order Costing System
Beban direct material dan direct labor ke
masing-masing pekerjaan ketika pekerjaan
dilakukan.
Direct Materials
Job No. 1
Direct Labor
Job No. 2
Manufacturing Overhead
Job No. 3
6
Urutan Peristiwa dalam Sistem penetapan biaya
pesanan Job-Order Sequence of Events in a
Job-Order Costing System
Direct Materials
Penggunaan overhead ke masing-masing pekerjaan
dengan menggunakan penentuan dimuka
(predeter-mined rate).
Job No. 1
Direct Labor
Job No. 2
Manufacturing Overhead
Job No. 3
7
Job-Order Cost Accounting
  • Dokumen Utama untuk menelusuri biaya-biaya yg
    digabungkan dengan pekerjaan melalui kartu
    pesanan (job cost sheet).

Lets investigate
8
Job-Order Cost Accounting
9
Job-Order Cost Accounting
10
Materials Requisition Form
Will E. Delite
11
Materials Requisition Form
Cost of material is charged to job A-143.
Type, quantity, and total cost of material
charged to job A-143.
Will E. Delite
12
Job-Order Cost Accounting
13
Job-Order CostingDocument Flow Summary
Materials yang digunakan mungkin juga langsung
atau tidak langsung.
Job Cost Sheets
Direct materials
MaterialsRequisition
Manufacturing Overhead Account
Indirect materials
14
Job-Order Cost Accounting
15
Employee Time Ticket
16
Job-Order Cost Accounting
17
Job-Order CostingDocument Flow Summary
Job Cost Sheets
Direct Labor
Employee Time Ticket
Manufacturing Overhead Account
Indirect Labor
18
Job-Order Cost Accounting
Menetapkan manufacturing overhead ke pekerjaan
dengan menggunakan overhead ditentukan dimuka
sebesar 4 per jam tenaga kerja langsung (DLH).
Lets do it
19
Job-Order Cost Accounting
20
Application of Manufacturing Overhead
  • Tingkat biaya overhead yang ditentukan dimuka
    ( POHR) digunakan untuk menerapkan overhead ke
    pekerjaan yang ditentukan sebelum periode mulai

Idealnya, dasar alokasi adalah suatu pengarah
biaya (cost driver) bagi overhead
21
Application of Manufacturing Overhead
Perkiraan yg didasarkan pada dan ditentukan
sebelum periode dimulai.
Jumlah aktual/sesungguhnya yang menyangkut
pengarah biaya (cost driver) units produced,
direct labor hours, or machine hours. Incurred
during the period.
22
Application of Manufacturing Overhead
23
Job-Order CostingDocument Flow Summary
IndirectLabor
EmployeeTime Ticket
OtherActual OHCharges
Manufacturing Overhead Account
AppliedOverhead
Job Cost Sheets
MaterialsRequisition
IndirectMaterial
24
Kebutuhan Biaya overhead ditentukan dimuka (POHR)
  • Pengunaan (POHR) membuat mungkinnya
    memperkirakan total harga pokok pesanan segera.
  • Actual overhead periode berjalan tidak
    dapat diketahui sampai akhir periode.


25
Overhead Application Example
  • PearCo menggunakan dasar overhead pada direct
    labor hours (DLH). Total perkiraan overhead
    untuk setahun sebesar 640,000. Total estimated
    labor cost adalah 1,400,000 dan total estimated
    labor hours adalah 160,000.Berapa POHR (per
    jam) ?

26
Overhead Application Example
POHR 4.00 per DLH
Karena masing-masing jam kerja tenaga kerja
langsung atas suatu pekerjaan 4.00
27
Overhead Application Example
Berapa jumlah overhead yg akan dibebankan ke Job
X-32?
28
Overhead Application Example
29
Job-Order System Cost Flows
Mari menguji aliran biaya mengalir dalan sistem
biaya. Kita akan menggunakan T-Accounts dan mulai
dengan material.
30
Job-Order System Cost Flows
Work in Process(Job Cost Sheet)
Raw Materials
  • Direct Materials
  • Direct Materials
  • Material
  • Purchases
  • Indirect Materials

Mfg. Overhead
Actual
Applied
  • Indirect Materials

31
Job-Order System Cost Flows
Selanjutnya tambahkan labor costs dan bebankan
manufacturing overhead ke aliran biaya pesanan.
32
Job-Order System Cost Flows
Work in Process(Job Cost Sheet)
Salaries and Wages Payable
  • Direct Labor
  • Direct Materials
  • Direct Labor
  • IndirectLabor
  • Overhead Applied

Mfg. Overhead
Actual
Applied
Jika MO aktual dan MO tidak sama, pada akhir
periode akuntansi diperlukan penyesuaian.
  • OverheadApplied to Work inProcess
  • Indirect Materials
  • IndirectLabor
  • Others

33
Job-Order System Cost Flows
Sekarang barang selesai dan terjual. Masih dengan
saya?
34
Job-Order System Cost Flows
Work in Process(Job Cost Sheet)
Finished Goods
  • Direct Materials
  • Cost ofGoodsMfd.
  • Cost ofGoodsMfd.
  • Cost ofGoodsSold
  • Direct Labor
  • Overhead Applied

Cost of Goods Sold
  • Cost ofGoodsSold

35
Job-Order System Cost Flows
Mari kempali ke PearCo dan lihat apa yg akan
dilakukan jika MO aktual dan MO dibebankan tidak
sama.
36
Overhead Application Example
  • PearCos MO aktual pada setahun sebesar 650,000
    dengan 170,000 jam (DLH).
  • Berapa banyak MO PearCos jobs yang dibebankan
    selama tahun berjalan ? PearCos menggunakan POHR
    sebesar 4.00 per DLH.

37
Overhead Application Example
  • PearCos MO aktual pada setahun sebesar 650,000
    dengan 170,000 jam (DLH).
  • Berapa banyak MO PearCos jobs yang dibebankan
    selama tahun berjalan ? PearCos menggunakan POHR
    sebesar 4.00 per DLH.

SOLUTION Applied Overhead POHR Actual
Direct Labor Hours Applied Overhead 4.00 per
DLH 170,000 DLH 680,000
38
Overhead Application Example
  • PearCos MO aktual pada setahun sebesar 650,000
    dengan 170,000 jam (DLH).
  • Berapa banyak MO PearCos jobs yang dibebankan
    selama tahun berjalan ? PearCos menggunakan POHR
    sebesar 4.00 per DLH.

PearCo memiliki MO overappliedsebesar 30,000.
Apa yg akanPearCo lakukan ?
SOLUTION Applied Overhead POHR Actual
Direct Labor Hours Applied Overhead 4.00 per
DLH 170,000 DLH 680,000
39
Overapplied and Underapplied Manufacturing
Overhead
PearCos Method
30,000mungkin dialokasikan ke
perkiraan-perkiraan.
30,000 mungkin di tutup langsung ke cost of
goods sold.
OR
Work inProcess
FinishedGoods
Cost of Goods Sold
Cost of Goods Sold
40
Overapplied and Underapplied Manufacturing
Overhead
PearCosMfg. Overhead
PearCos Costof Goods Sold
Unadjusted Balance
Actualoverheadcosts 650,000
OverheadAppliedto jobs 680,000
30,000
30,000
AdjustedBalance
30,000 overapplied
41
Overapplied and Underapplied Manufacturing
Overhead - Summary
PearCos Method
42
Overhead Application Question 1
  • Tiger, Inc. memiliki MO aktual sebesar
    1,210,000 dan POHR sebesar 4.00 per jam mesin
    (MH). MH selama periode berjalan 290,000 MH.
    Berapa MO ?
  • a. 50,000 overapplied.b. 50,000
    underapplied.c. 60,000 overapplied.d.
    60,000 underapplied.

43
Overhead Application Question 2
  • Diasumsikan bahwa MO 60,000 underapplied.
    Jumlah ini sakan menyebabkan penyesuaian berupa
    penurunan/decrease cost of goods sold by 60,000.
  • a. True
  • b. False

44
Job-Order Costing Typical Accounting Entries
Mari lihat ringkasan ayat-ayat jurnal untuk
sistem harga pokok pesanan.
45
Cost Flows Material Purchases
  • Pembelian raw material dicatat dalam perkiraan
    persediaan (inventory account).

46
Cost Flows Material Usage
  • Pemakaian bahan langsung (direct materials) yg
    digunakan utk produksi ( Work in Process)
    pengurangan bahan baku (raw material). Penggunaan
    bahan tdk langsung (indirect materials)
    dibebankan ke biaya produksi (manufacturing
    Overhead) dan juga penurunan pd bahan baku (raw
    material) .

47
Cost Flows Labor
  • Upah kerja langsung diadakan utk produksi
    (work in process) dan upah kerja tdk langsung
    (indirect labor) dibebankan kepada biaya overhead
    pabrik (manufacturing overhead).

48
Cost Flows Actual Overhead
  • Tabahan indirect materials dan indirect labor,
    serta other manufacturing overhead costs yang
    dibebankan kepada perkiraan manufacturing
    Overhead.

49
Cost Flows Overhead Applied
  • Work in Process bertambah ketika MO dibebankan
    kepada pesanan.

50
Cost Flows Period Expenses
  • Nonmanufacturing costs (period expenses)
    dibebankan sebagai biaya non produksi

51
Cost Flows Cost of Goods Manufactured
  • Pesanan selesai, HP Produksi (cost of goods
    manufactured) ditransfer ke barang jadi (finished
    goods) dari barang dlm proses (work in process).

52
Cost Flows Sales
  • Ketika brg jadi dijual, ada 2 ayat (1)
    mencata penjualan and (2) mencatat HPP (cost of
    goods sold) dan engurangi barang jadi (and reduce
    Finished Goods).

53
End of Chapter 3
Write a Comment
User Comments (0)
About PowerShow.com