Edinburgh Fastlink - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Edinburgh Fastlink

Description:

... Real Time Information CCTV On street Bus Lanes Accessible Bus stops Guided busway track High Tech Appearance Conclusion BRT is a success for Edinburgh ! – PowerPoint PPT presentation

Number of Views:77
Avg rating:3.0/5.0
Slides: 22
Provided by: MichaelH197
Category:

less

Transcript and Presenter's Notes

Title: Edinburgh Fastlink


1
Edinburgh Fastlink
2
Edinburgh Fastlink
  • Constructed under the project name West Edinburgh
    BuswayS (WEBS)
  • Comprises
  • 1.5km two lane guided busway
  • 3.45km of on-street bus priority measures
  • Overall corridor length is 8km from City Centre
    to Edinburgh Park

3
Edinburgh Fastlink Route
West Approach and Fountain Park Development to
City Centre
The Gyle Shopping Centre
Balgreen/ Stevenson Residential Area
Stenhouse Residential Area
Edinburgh Business Park
Guided Busway
Edinburgh Park Railway Station and Interchange
Sighthill and Broomhouse Residential
Sighthill Industrial Estate
Hermiston Gait Retail Park
4
The Fastlink Route
Location Mode of bus Priority Max saving in Seconds
South Gyle Bus lane Dual Carriageway Converted 58
Fastlink Guided Busway 540
Stenhouse / Stevenson Drive Road widening for new Bus lane 305
Balgreen / Stevenson Road Realignment to allow Bus Lane 62
West Approach Road Bus lane Dual Carriageway Converted 114
Links in with Car Free Princes Street and
Greenways on Leith Walk
5
Guideway
  • 1st in Scotland
  • Longest continuous in the UK
  • Owned by City Council
  • Procured and managed by tie
  • Constructed on time and within budget
  • Operated as open access by agreement at present
    single operator Lothian Buses
  • Quality Standards written into agreement

6
Powers
  • Guideway
  • Private Bill lodged in 1995
  • City of Edinburgh (Guided Busway) Confirmation
    Act 1998
  • Guided Busway by Definition
  • On Street
  • Traffic Regulation Orders

7
Features
  • Guideway
  • Level boarding
  • CCTV
  • Real time Information
  • New Shelters

8
Features
  • On Street
  • Level boarding
  • New Shelters
  • Bus Lane Priority

9
Features
  • Bus Operation
  • Frequent Service
  • Euro 3 Emissions standard or better
  • Kneeling buses
  • On bus CCTV

10
Implementation
  • Technical support contract
  • General Technical advice
  • Contract Project Managers
  • On street design
  • Support to TRO process on street
  • Guided Busway Contract
  • On Street Bus Priority Measures Contract

11
Partnerships
  • Bus Operators
  • Design and Build Contractor
  • Maintenance and Operation
  • Consultation and Community Liaison

12
Construction Method
  • slipformed
  • Continuously Reinforced concrete Pavement (CRCP)
  • Designed to crack naturally

13
Operation
  • Access by agreement
  • Frequency 4 minutes
  • 30 buses original fleet
  • Additional 5 buses purchased
  • 7 rise in patronage in 1st Year
  • Improved Reliability

14
Guideway PerformanceWestbound Journey Times
15
Guideway PerformanceEastbound Journey Times
16
Guideway PerformanceWestbound Reliability
17
Guideway PerformanceEastbound Reliability
18
Public Perception
  • Sample of 182 users
  • 12 of existing users used the route more
    because of Fastlink
  • 14 had increased their use or started using
    Fastlink because of its facilities
  • The Guideway offers benefits over bus lanes 76
    Agree
  • The guided busway should be extended 73 Agree

19
Public Perception
  • Importance Ranked Benefits
  • Reliability
  • Journey Time
  • Frequent Services
  • Affordability
  • Clear priority to buses
  • Environmental benefits
  • Safe and easy boarding

20
Public Perception
  • Importance Ranked Facilities
  • Real Time Information
  • CCTV
  • On street Bus Lanes
  • Accessible Bus stops
  • Guided busway track
  • High Tech Appearance

21
ConclusionBRT is a success for Edinburgh !
  • Scottish Transport Awards 2005 Most Innovative
    Transport Project of the Year Winner
  • Measurable Journey Time savings off street
  • Measurable Journey Time savings on street
  • Improved Reliability
  • Patronage Increases
  • High Perception by passengers
  • Partnership Delivery and Operation
  • Significant non user benefits
Write a Comment
User Comments (0)
About PowerShow.com