Millennium Development Goals - PowerPoint PPT Presentation

Loading...

PPT – Millennium Development Goals PowerPoint presentation | free to download - id: 3f975a-N2RhN



Loading


The Adobe Flash plugin is needed to view this content

Get the plugin now

View by Category
About This Presentation
Title:

Millennium Development Goals

Description:

Millennium Development Goals 5. Improve maternal health reduce maternal mortality rate by three quarters by 2015 (half by 2000, half by 2015) 7. – PowerPoint PPT presentation

Number of Views:170
Avg rating:3.0/5.0
Slides: 24
Provided by: drruth2
Learn more at: http://emb.gov.ph
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: Millennium Development Goals


1
MillenniumDevelopmentGoals
2
1. Eradicate extreme poverty and hunger
  • halve the proportion of people living in extreme
    poverty between 1990 and 2015
  • halve the proportion of population below level
    of dietary energy consumption and halve the
    proportion of underweight children (under 2 years
    old)

3
2. Achieve universal access to primary education
  • Achieve universal access to primary education by
    2015

4
3. Promote gender equity and empower women
  • eliminate gender disparity in primary and
    secondary education preferably by 2005 and in all
    levels of education no later than 2015

5
4. Reduce child mortality
  • reduce children under-five mortality rate by
    two-thirds by 2015

6
5. Improve maternal health
  • reduce maternal mortality rate by three quarters
    by 2015 (half by 2000, half by 2015)

7
6. Combat HIV/AIDS, Malaria and other diseases
  • increase access to reproductive health services
    to 60 percent by 2005, 80 per cent by 2010 and
    100 percent by 2015.
  • Halt and reverse the spread of HIV/AIDS by 2015.
  • Have halved by 2015, and began to reverse the
    incidence of malaria and other major diseases

8
7. Ensure Environmental Sustainability
  • Implement national strategies for sustainable
    development by 2005, to reverse loss of
    environmental resources by 2015
  • By 2020. to have achieved a significant
    improvement in the lives of at least 100 million
    slum dwellers
  • Halve the proportion of people with no access to
    safe drinking water or those who cannot afford it
    by 2015.
  • Halve the proportion of people with no access to
    safe drinking water or those who cannot afford it
    by 2015

9
8. Develop a global partnership for development
  • Develop further an open, rule-based, predictable
    non-discriminatory trading and financial system,
    include a commitment to good governance,
    development and poverty reduction-both nationally
    and internationally.

10
BUILDING CAPACITIES OF COMMUNITIES TO COPE WITH
GLOBALIZATION
  • A Philippine Capacity 2015 Proposal
  • 9 August 2004
  • Sulo Hotel, Quezon City

11
BACKGROUND
  • According to the recent UN Common Country
    Assessment
  • The poverty situation continues to be serious.
  • The countrys environment natural resources
    on w/c 2/3 of the population depend, continue to
    be degraded.
  • Globalization is providing both
    opportunities risks.

12
Background cont
  • Globalization has ushered a new context
    connectivity among actors activities.
  • SMEs,comprising 99 of enterprises
  • providing 76 of labor force has been
  • recognized as a potent force in the war
    against poverty.
  • However, they only currently contribute 33
    to total economic output because of

13
Background cont
  • a.) limited access to credit.
  • b.) underdeveloped sources of raw materials.
  • c.) limited access to modernizing technology.
  • d.) lack or low level of market information.
  • SMEs unsustainable practices not only
  • undermine their productivity, but also result in
  • damage to the environment adverse social
  • impacts.

14
Background cont
  • The optimal functioning of SMEs is dependent
  • on a conducive policy environment, proper
  • provision of delivery of basic services
  • presence of critical infrastructure.
  • LGUs, through good governance, facilitate
    the
  • provision of the above.
  • As a capacity building agent and repository
    of
  • technical information knowledge, the
    Academe provides the manpower technical
  • assistance direly needed by SMEs.

15
THE PROPOSAL
  • Objective
  • Strengthen key factors that catalyze the
  • sustainable development of communities e.g.
  • partnerships among and capacities of the key
  • actors at the local level-SMEs,LGUs the
  • Academe.

16
WHY SMEs
  • Free enterprises are the drivers of economic
  • growth.
  • Wealth creation by local SMEs simultaneously
  • address wealth disparity issues.
  • SMEs empower local people through control
  • ownership of benefits from productive
    devt., as well as, facilitate a high degree of
    participatory devt.
  • SMEs w/c are locally initiated managed are
    more
  • likely to be socially acceptable
    culturally valid.

17
  • Negative environmental impacts are more
  • immediately felt corrected at local
    levels.
  • Facilitating investment flows to local areas
  • moderate the centrifugal flow of natural,
    financial human resources to centers.
  • With ICT, technical market information
    are easier to provide to local SMEs.

18
The Proposed Methodology
  • Preparatory Assistance (PA) to undertake
    extensive consultations among stakeholders,
    experts and other interested parties to determine
    the elements, scope and methodology for the full
    blown project.

19
  • PA to generate criteria to determine
  • candidate sites their rapid assess-
  • ment in terms of conditions,gover-
  • nance structures inter-actions.
  • PA to catalyze mechanism building
  • strengthening of linkages among
  • prospective partners.

20
  • PA to result in development
  • of a
  • Project Document (ProDoc)

21
Proposed PA Activities
  • Activity 1 Project scope determination
  • formulation of site
    selection
  • criteria.
  • Activity 2 Data gathering site selection.
  • Activity 3 Needs assessment for capacity
  • building of critical stakeholders.
  • Activity 4 Mechanism building/
  • strengthening

22
  • Activity 5 Develop Project Document
  • Activity 6 Foster partnerships/networks.

23
Proposed Duration
  • Nine (9) months from start of PA
About PowerShow.com