Title: hot water to station
1hot water to station return
480 V to dome
2(No Transcript)
3To dome, large animal, and astro-lab
42a. first stage regulator
3. vapor propane feed
1a tank
1b tank
4. liquid propane feed
5 filter
Approx 20 of fall between tanks and utility shed
6. Second stage regulator
Propane vapor at .2 psi
6
boilers, stove
9. regulator
microturbine generators
Utility shed
Propane vapor at 45 psi and 50 degrees F (use hot
water line or heat tape?)
7 liquid pump
8 vaporizer
underground
5zone circuits (6 zones)
Loop to small animal building
Loop to dog building
6Hydronic heating system manifold (in DEG room)
Pace lab
Sm. animal
Lg. animal
Pressure tank
P
P
P
Thermostat-controlled pumps
P
On/off
To TES tank (future)
P
P
G
To boiler 1
To boiler 2
7(No Transcript)
8Generator room sketch - floorplan
9Generator room N wall interior (all walls
cinder block)
10Generator room W wall note ducting (room on
right side is fictitious) note 12 rafters and
insulation
11Generator room south wall note high windows
and doorway. Conduit at lower left of door leads
to main distribution panel for Pace Lab
12E wall note garage door and 30 door.