National Institute of Advanced Industrial Science and Technology. Status report on the ... Grid Technology Research Center. AIST. Hiroshi Takemiya, Yoshio ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 7
Provided by: yos42
Category:

less

Transcript and Presenter's Notes

Title: Status report on the large-scale long-run simulation on the grid - Hybrid QM/MD simulation -


1
Status report on thelarge-scale long-run
simulation on the grid- Hybrid QM/MD simulation -
  • Grid Technology Research Center
  • AIST
  • Hiroshi Takemiya, Yoshio Tanaka

2
Goal of the experiment
  • To verify the effectiveness of our programming
    approach for large-scale long-run grid
    applications
  • Flexibility
  • Robustness
  • efficiency
  • Friction simulation
  • Nano-scale prober moves on the Si substrate
  • Requiring hundreds of CPUs
  • Requiring long simulation time over a few months
  • No. of QM regions and No. of QM atoms change
    dynamically

Gridifying the application Using GridRPC MPI
  • lt Initial conditiongt
  • 2 QM regions with
  • 72 41 QM atoms
  • Totally 28598 atoms

3
Testbed for the Friction Simulation
  • Used 11 clusters with totally 632 CPUs in 8
    organizations.
  • PRAGMA Clusters
  • SDSC (32 CPUs), KU (8 CPUs), NCSA (8 CPUs), NCHC
    (8 CPUs)
  • Titech-1(8 CPUs), AIST(8 CPUs)
  • AIST Super Cluster
  • M64 (128 CPUs), F32-1(128 CPUs 128 CPUs)
  • Japan Clusters
  • U-Tokyo (128 CPUs), Tokushima-U (32 CPUs),
    Titech-2 (16 CPUs)

M64
F32
NCSA
KU
U-Tokyo
SDSC
AIST
Titech-2
NCHC
Titech-1
Tokushima-U
4
Result of the Friction Simulation
  • Experiment Time 52. 5 days
  • Longest Calculation Time 22 day
  • Manual restart 2 times
  • Execution failure 165 times
  • Succeeded in recovering these failures
  • Changing the No. of CPUs used 18 times
  • succeeded in adjusting No. of CPUs to the No. of
    QM regions/QM atoms

5
Summary and future work
  • Our approach is effective for running large-scale
    grid applications for a long time
  • Need more grid services
  • Getting information on available resources
  • Resource reservation
  • Coordinating with resource manager/scheduler
  • Need cleaner MPI
  • mpich quits leaving processes/IPC resources
  • Using GridMPI in place of mpich

6
(No Transcript)